Glossary of Terms

Archaeological Potential

Archaeological potential is defined within the City of Toronto's Archaeological Management Plan as land which may contain archaeological resources or sites. Soil disturbance activities associated with public works and infrastructure projects in areas of archaeological potential should be subject to an archaeological resource assessment in advance of construction. The assessment will evaluate the significance of any resources encountered and outline measures to mitigate possible impacts. Contact: Susan Hughes - City Planning, Heritage Preservation Services at 416 338-1096. Read more.

Archaeological potential is defined within the City of Toronto's Archaeological Management Plan as land which may contain archaeological resources or sites. Soil disturbance activities associated with public works and infrastructure projects in areas of archaeological potential should be subject to an archaeological resource assessment in advance of construction. The assessment will evaluate the significance of any resources encountered and outline measures to mitigate possible impacts. Contact: Susan Hughes - City Planning, Heritage Preservation Services at 416 338-1096. Read more.

Ashbridges Bay Light Rail Vehicle

Installation of new tracks along Leslie Street from Commissioners Street to Queen Street and streetscaping improvements along Leslie Street from Commissioners Street to Queen Street and along Queen Street from Hastings Avenue to Jones Avenue. This work will also include resurfacing of the road and sidewalk re-building as required. Read more.

Installation of new tracks along Leslie Street from Commissioners Street to Queen Street and streetscaping improvements along Leslie Street from Commissioners Street to Queen Street and along Queen Street from Hastings Avenue to Jones Avenue. This work will also include resurfacing of the road and sidewalk re-building as required. Read more.

Avenue Studies

These studies examine areas where potential growth is encouraged. These studies identify challenges and opportunities for development including the sizes of buildings, traffic and parking issues and community desires.

Read more about Avenue Studies.

These studies examine areas where potential growth is encouraged. These studies identify challenges and opportunities for development including the sizes of buildings, traffic and parking issues and community desires.

Read more about Avenue Studies.

Basement Flooding (Linear & Site)

To help reduce flooding risk in areas prone to basement flooding. May include upgrades to the existing storm sewer system, such as installing new pipes, or replacing existing pipes with larger pipes, the installation of dry ponds or underground storage tanks, and other improvements to the sewer system.

Read more about the Basement Flooding Remediation Projects.

To help reduce flooding risk in areas prone to basement flooding. May include upgrades to the existing storm sewer system, such as installing new pipes, or replacing existing pipes with larger pipes, the installation of dry ponds or underground storage tanks, and other improvements to the sewer system.

Read more about the Basement Flooding Remediation Projects.

Basement Flooding Study

Locations recognized as frequently experiencing basement flooding. Environmental Assessments (EAs) to review the systems' ability to manage runoff during extreme storms. Recommendations from EAs are prioritized and scheduled for construction in coordination with other projects.

Read more about the Basement Flooding Protection Program.

Locations recognized as frequently experiencing basement flooding. Environmental Assessments (EAs) to review the systems' ability to manage runoff during extreme storms. Recommendations from EAs are prioritized and scheduled for construction in coordination with other projects.

Read more about the Basement Flooding Protection Program.

Beanfield Metroconnect - Cast Iron Replacement

Installation of new pipes. Read more.

Installation of new pipes. Read more.

Bridge Rehabilitation

Maintenance work to keep the bridge in a state of good repair.

Maintenance work to keep the bridge in a state of good repair.

Business Improvement Areas

A BIA is an association of commercial property owners and tenants within a defined area who work in partnership with the City to create thriving, competitive, and safe business areas that attract shoppers, diners, tourists, and new businesses. Toronto now has 72 BIAs, representing over 32,000 businesses - the largest number of BIAs in North America.

Read more.

A BIA is an association of commercial property owners and tenants within a defined area who work in partnership with the City to create thriving, competitive, and safe business areas that attract shoppers, diners, tourists, and new businesses. Toronto now has 72 BIAs, representing over 32,000 businesses - the largest number of BIAs in North America.

Read more.

Business Improvement Projects

Business Improvement Area projects, which may include streetscape/intersection improvements, lighting, tree planting, banner poles, etc. Read more.

Business Improvement Area projects, which may include streetscape/intersection improvements, lighting, tree planting, banner poles, etc. Read more.

Capital Projects (MTO)

Reconstruction/rehabilitation of MTO highways and bridges, addition of HOV lanes, repair and restoration of culverts, storm sewers and/or security fencing. Read more.

Reconstruction/rehabilitation of MTO highways and bridges, addition of HOV lanes, repair and restoration of culverts, storm sewers and/or security fencing. Read more.

Capital Works (TTC)

Capital Projects

Work could include station modernization, pavement rehabilitation and/or bridge and tunnel repair.

Electrical work

Work includes reconstruction of streetcar overhead lines and replacement of the track or power system.

Curb Cuts

Installation of new curb cuts including sidewalk and curb modifications to facilitate new accessible LRT vehicles. In addition, installation of ticket vending machines on streetcar routes.

Capital Projects

Work could include station modernization, pavement rehabilitation and/or bridge and tunnel repair.

Electrical work

Work includes reconstruction of streetcar overhead lines and replacement of the track or power system.

Curb Cuts

Installation of new curb cuts including sidewalk and curb modifications to facilitate new accessible LRT vehicles. In addition, installation of ticket vending machines on streetcar routes.

Centre Studies

Four key locations on the rapid system, shown as Centres, play an important role in how we manage growth. The Scarborough, North York, Etobicoke and Yonge-Eglinton Centres are places with excellent transit accessibility where jobs, housing and services will be together. Read more.

Four key locations on the rapid system, shown as Centres, play an important role in how we manage growth. The Scarborough, North York, Etobicoke and Yonge-Eglinton Centres are places with excellent transit accessibility where jobs, housing and services will be together. Read more.

City Ward

A geographic area of the city that is represented politically by one Councillor.

A geographic area of the city that is represented politically by one Councillor.

Civic Improvements (Linear & Site)

Opportunities to improve neighbourhood areas, especially where pedestrian and vehicular traffic is greatest. Could also improve neighbourhoods through major planning initiatives.

Opportunities to improve neighbourhood areas, especially where pedestrian and vehicular traffic is greatest. Could also improve neighbourhoods through major planning initiatives.

Cogeco Data - New Fibre Installation

Installing new cable.

Read more.

Installing new cable.

Read more.

Community Centre Projects

Community centre construction, maintenance/rehabilitation and/or additions.

Community centre construction, maintenance/rehabilitation and/or additions.

Community Council Area

Community Councils are committees of City Council that consider local City business within a specific area and provide input into Council's decision-making process. Their responsibilities generally include local planning and development matters, traffic plans, parking regulations and exemptions to certain bylaws. There are six community councils in Toronto - representing between six and 10 wards each.

Community Councils are committees of City Council that consider local City business within a specific area and provide input into Council's decision-making process. Their responsibilities generally include local planning and development matters, traffic plans, parking regulations and exemptions to certain bylaws. There are six community councils in Toronto - representing between six and 10 wards each.

Cycling Network Projects

On-Street Bikeway Network Construction

Installation of various cycling infrastructure including Bike Lanes, Cycle Tracks and Sharrows.

Off-Street Bikeway Network Construction

Construction of multi-use bike trails.

On-Street Bikeway Network Construction

Installation of various cycling infrastructure including Bike Lanes, Cycle Tracks and Sharrows.

Off-Street Bikeway Network Construction

Construction of multi-use bike trails.

Eglinton - Scarborough Crosstown Project

Crosstown Project

Installation of new, modern transit along Eglinton Avenue (from approximately Black Creek Drive to Kennedy Station) and the Scarborough Rapid Transit line. Approximately 10 km underground segment between Keele St. to Brentcliff Rd. and, approximately 9 km at-grade segment from Kennedy Station to Brentcliff Road. Work also includes approximately 10 km of the Scarborough RT conversion and extension, from Kennedy Station and connecting to the new Sheppard Ave LRT. Read more.

Stations

Installation of new LRT underground stations and at-grade stops along the Eglinton - Scarborough Crosstown transit line.

Utility Relocation

Relocation of underground utilities along the Eglinton - Scarborough Transit Line.

Underground Installation

May include installation of emergency exit buildings and other work around- the stations along the Eglinton Crosstown Transit Line.

No Work Zone

Areas where no work will take place by the TTC/Metrolinx along the Eglinton - Scarborough Transit Line.

Crosstown Project

Installation of new, modern transit along Eglinton Avenue (from approximately Black Creek Drive to Kennedy Station) and the Scarborough Rapid Transit line. Approximately 10 km underground segment between Keele St. to Brentcliff Rd. and, approximately 9 km at-grade segment from Kennedy Station to Brentcliff Road. Work also includes approximately 10 km of the Scarborough RT conversion and extension, from Kennedy Station and connecting to the new Sheppard Ave LRT. Read more.

Stations

Installation of new LRT underground stations and at-grade stops along the Eglinton - Scarborough Crosstown transit line.

Utility Relocation

Relocation of underground utilities along the Eglinton - Scarborough Transit Line.

Underground Installation

May include installation of emergency exit buildings and other work around- the stations along the Eglinton Crosstown Transit Line.

No Work Zone

Areas where no work will take place by the TTC/Metrolinx along the Eglinton - Scarborough Transit Line.

Enbridge Gas Distributions Inc - Cast Iron Replacement

Replacing existing cast iron pipes with new plastic pipes.

Replacing existing cast iron pipes with new plastic pipes.

Environmental Assessment

Proposed municipal transportation or water related projects may, by law, require an environmental assessment study. These studies assess the possible positive and negative impacts a project may have and determine a preferred option.

Proposed municipal transportation or water related projects may, by law, require an environmental assessment study. These studies assess the possible positive and negative impacts a project may have and determine a preferred option.

Enwave - Pipe Installation

Installation of a pin an open trench. It might be located in a hand dug, temporary construction tunnel. The pipe is insulated and encased in concrete. Read more.

Installation of a pin an open trench. It might be located in a hand dug, temporary construction tunnel. The pipe is insulated and encased in concrete. Read more.

Finch LRT

Installation of new, modern transit along Finch Ave from Humber College to Finch West Station on the new Toronto-York Spadina Subway extension.

Installation of new, modern transit along Finch Ave from Humber College to Finch West Station on the new Toronto-York Spadina Subway extension.

Georgetown South and Bridge Projects

Expanding the Georgetown GO line to meet GO transit ridership demand and growth and to accommodate existing and future VIA Rail and CN freight service as well as the new Air Rail Link between Union Station and Pearson International Airport. Includes additional tracks, modifications to bridges along the route as well as new bridges and underpasses/tunnels.

Read more.

Expanding the Georgetown GO line to meet GO transit ridership demand and growth and to accommodate existing and future VIA Rail and CN freight service as well as the new Air Rail Link between Union Station and Pearson International Airport. Includes additional tracks, modifications to bridges along the route as well as new bridges and underpasses/tunnels.

Read more.

Hydro One - Infrastructure Renewal Project

Lakeshore Infrastructure Renewal Project

Replacing existing transmission infrastructure that services the western Lakeshore area.

Read more.

Midtown Electricity Infrastructure Renewal Project

Replacing existing transmission infrastructure that services midtown and areas to the west.

Read more.

Lakeshore Infrastructure Renewal Project

Replacing existing transmission infrastructure that services the western Lakeshore area.

Read more.

Midtown Electricity Infrastructure Renewal Project

Replacing existing transmission infrastructure that services midtown and areas to the west.

Read more.

Moratorium

A City policy that prevents non-emergency road work from taking place in an area where it has occurred in the past five years. This is done to reduce disruption to a community where work has previously taken place and to maintain the quality of our roads.

A City policy that prevents non-emergency road work from taking place in an area where it has occurred in the past five years. This is done to reduce disruption to a community where work has previously taken place and to maintain the quality of our roads.

New Light Rail Vehicle (LRV) Maintenance & Storage Facility

Installation of new tracks along Leslie Street from Commissioners Street to Queen Street and streetscaping improvements along Leslie Street from Commissioners Street to Queen Street and along Queen Street from Hastings Avenue to Jones Avenue. This work will also include resurfacing of the road and sidewalk re-building as required.

Read more.

Installation of new tracks along Leslie Street from Commissioners Street to Queen Street and streetscaping improvements along Leslie Street from Commissioners Street to Queen Street and along Queen Street from Hastings Avenue to Jones Avenue. This work will also include resurfacing of the road and sidewalk re-building as required.

Read more.

New Sidewalk Construction

Installation of new sidewalks where none existed before.

Installation of new sidewalks where none existed before.

Pan Am 2015

Cycling Route

Pan Am cycling route.

Venue

Facilities and buildings will be used to host the Pan Am Games in 2015.

Read more.

Cycling Route

Pan Am cycling route.

Venue

Facilities and buildings will be used to host the Pan Am Games in 2015.

Read more.

Road Reconstruction

Replacement of the entire road structure including the asphalt and underlying support materials, drainage, curbs, boulevards and sidewalks.

Replacement of the entire road structure including the asphalt and underlying support materials, drainage, curbs, boulevards and sidewalks.

Road Resurfacing

Replaces old asphalt surface with new asphalt surface, and includes repairing any damaged sidewalks and curbs. May include the closure of individual lanes or the entire road.

Replaces old asphalt surface with new asphalt surface, and includes repairing any damaged sidewalks and curbs. May include the closure of individual lanes or the entire road.

Rogers - Underground Replacement/Rehabilitation Work

Installing new cable to increase network capacity.

Installing new cable to increase network capacity.

Secondary Plans

Secondary Plans establish local development policies to guide growth and change in a defined area of the City. The plans will not be prepared for some areas of the City, where major change is not expected. Secondary Plans guide the creation of new neighbourhood and employment areas while ensuring adequate public infrastructure and environmental protection. Read more.

Secondary Plans establish local development policies to guide growth and change in a defined area of the City. The plans will not be prepared for some areas of the City, where major change is not expected. Secondary Plans guide the creation of new neighbourhood and employment areas while ensuring adequate public infrastructure and environmental protection. Read more.

Sewer Rehabilitation

Rehabilitating an existing sewer pipe to extend its life and improve system performance. May include cleaning the interior of an existing sewer, installing a liner inside an existing pipe, sealing cracks and/or joints, repairs to catch basins or maintenance holes, and necessary upgrades of city-owned portion of sewer connections.

Read more about the Sewer Rehabilitation Program.

Rehabilitating an existing sewer pipe to extend its life and improve system performance. May include cleaning the interior of an existing sewer, installing a liner inside an existing pipe, sealing cracks and/or joints, repairs to catch basins or maintenance holes, and necessary upgrades of city-owned portion of sewer connections.

Read more about the Sewer Rehabilitation Program.

Sewer Replacement

Constructing new sewers to improve system performance. The program includes any necessary upgrades to maintenance holes, catch basins or the city-owned portion of connections to properties.

Constructing new sewers to improve system performance. The program includes any necessary upgrades to maintenance holes, catch basins or the city-owned portion of connections to properties.

Sheppard LRT

Installation of new, modern transit along Sheppard Ave from Don Mills Station to Morningside Avenue. Approximately 12 km in length at-grade transit line.

Installation of new, modern transit along Sheppard Ave from Don Mills Station to Morningside Avenue. Approximately 12 km in length at-grade transit line.

Stormwater Management

Provides drainage of surface water from streets - necessary to keep the roads in a state of good repair and limit surface flooding. These projects also slow down the flow of water and allow it to seep into the ground. Stormwater management projects may include installing new storm sewers or catch basins, maintaining existing ditches or swales, and constructing underground or above ground storage systems.

Read more about the Wet Weather Flow Master Plan.

Provides drainage of surface water from streets - necessary to keep the roads in a state of good repair and limit surface flooding. These projects also slow down the flow of water and allow it to seep into the ground. Stormwater management projects may include installing new storm sewers or catch basins, maintaining existing ditches or swales, and constructing underground or above ground storage systems.

Read more about the Wet Weather Flow Master Plan.

Street Furniture

Installation of various street furniture including shelters, information pillars, washrooms, etc.

Installation of various street furniture including shelters, information pillars, washrooms, etc.

Streetscape Manual

The Streetscape Manual is a reference tool developed to guide the design, construction and maintenance of streetscape improvements on Toronto's road network. The manual emphasizes design quality with specifications for paving, trees, medians, lighting and street furniture.

Read more.

The Streetscape Manual is a reference tool developed to guide the design, construction and maintenance of streetscape improvements on Toronto's road network. The manual emphasizes design quality with specifications for paving, trees, medians, lighting and street furniture.

Read more.

Toronto Hydro (Linear & Site)

Site - Spot Repair

Work on spot locations.

Underground/Overhead Work

A combination of work on overhead and underground infrastructure.

Site - Spot Repair

Work on spot locations.

Underground/Overhead Work

A combination of work on overhead and underground infrastructure.

Toronto York Spadina Subway Extension

Extension of the subway system from Downsview Station northwest through York University to the Vaughan Corporate Centre.

Read more

Extension of the subway system from Downsview Station northwest through York University to the Vaughan Corporate Centre.

Read more

Track Replacement

Replacing the streetcar tracks/rails and includes replacing the underlying support materials. May also include resurfacing or reconstruction of the adjacent road/traffic lanes.

Replacing the streetcar tracks/rails and includes replacing the underlying support materials. May also include resurfacing or reconstruction of the adjacent road/traffic lanes.

Transmission Watermain Program

Involves replacing or installing new watermains.

Read more about the Water Transmission System.

Involves replacing or installing new watermains.

Read more about the Water Transmission System.

Transportation Safety and Local Improvements

Provide safety related improvements to the roadway.

Provide safety related improvements to the roadway.

TRCA

The Regulation Limit identifies the TRCA's area of interest and the area in which a permit is required from the TRCA. Read more.

The Regulation Limit identifies the TRCA's area of interest and the area in which a permit is required from the TRCA. Read more.

Utility Cut Repair and Road Paving

Utility Cut Road Work

Replaces old asphalt surface with new asphalt surface, and includes repairing any damaged sidewalks and curbs. May include the closure of individual lanes or the entire road.

Utility Relocation

Relocation of underground utilities along the Eglinton - Scarborough Transit Line.

Replaces old asphalt surface with new asphalt surface, and includes repairing any damaged sidewalks and curbs. May include the closure of individual lanes or the entire road.

Waterfront Toronto Projects

Revitalizing the waterfront area to create a vibrant environment for residents, pedestrians and cyclists. Read more.

Revitalizing the waterfront area to create a vibrant environment for residents, pedestrians and cyclists. Read more.

Water Service Replacement Program

The planned replacement of the city-owned portion of substandard water service connections in coordination with other programs. Two access pits are excavated - one at the property line and one at the watermain. The new service connection is installed between these two pits. The property owner is encouraged to replace the private portion of substandard water service connection at the same time.

Read more information about the Water Service Replacement Program.

The planned replacement of the city-owned portion of substandard water service connections in coordination with other programs. Two access pits are excavated - one at the property line and one at the watermain. The new service connection is installed between these two pits. The property owner is encouraged to replace the private portion of substandard water service connection at the same time.

Read more information about the Water Service Replacement Program.

Watermain Rehabilitation

Watermain Cathodic Protection

Extends the service life of existing metallic watermains by reducing external pipe corrosion, a primary cause of watermain deterioration. Involves attaching a metal rod to the watermain so that the rod corrodes instead of the pipe.
Read more about the Watermain Rehabilitation program.

Watermain Clean and Cement Mortar Lining

Removing build-up from the inside of older watermains, relining the internal pipe with a thin layer of cement, as well as replacing fire hydrants and water valves. Addresses issues such as low water pressure, low water flow or rusty water and improves system performance. Construction includes the excavation of pits to access the inside of the pipe. During construction, water service is maintained through an above-ground pipe or by-pass.
Read more about the Watermain Rehabilitation program.

Watermain Structural Lining

Removing build-up from the inside of older watermains, and inserting a "new pipe" within the old pipe. May also replace fire hydrants, water valves, and the city-owned portion of substandard water service connections. Addresses complaints such as low water pressure, low water flow or rusty water and also strengthens pipe to extend its service life. Construction includes the excavation of pits to access the inside of the pipe. During construction, water service is maintained through an above-ground pipe or by-pass.
Read more about the Watermain Rehabilitation program.

Watermain Cathodic Protection

Extends the service life of existing metallic watermains by reducing external pipe corrosion, a primary cause of watermain deterioration. Involves attaching a metal rod to the watermain so that the rod corrodes instead of the pipe.
Read more about the Watermain Rehabilitation program.

Watermain Clean and Cement Mortar Lining

Removing build-up from the inside of older watermains, relining the internal pipe with a thin layer of cement, as well as replacing fire hydrants and water valves. Addresses issues such as low water pressure, low water flow or rusty water and improves system performance. Construction includes the excavation of pits to access the inside of the pipe. During construction, water service is maintained through an above-ground pipe or by-pass.
Read more about the Watermain Rehabilitation program.

Watermain Structural Lining

Removing build-up from the inside of older watermains, and inserting a "new pipe" within the old pipe. May also replace fire hydrants, water valves, and the city-owned portion of substandard water service connections. Addresses complaints such as low water pressure, low water flow or rusty water and also strengthens pipe to extend its service life. Construction includes the excavation of pits to access the inside of the pipe. During construction, water service is maintained through an above-ground pipe or by-pass.
Read more about the Watermain Rehabilitation program.

Watermain Replacement

Involves constructing new watermains to enhance the operation and the reliability of the water distribution system. May include the replacement of fire hydrants, water valves, and the city-owned portion of substandard water service connections.

Read more about Watermain Breaks.

Involves constructing new watermains to enhance the operation and the reliability of the water distribution system. May include the replacement of fire hydrants, water valves, and the city-owned portion of substandard water service connections.

Read more about Watermain Breaks.