Environmental Project Report
Cover, Table of Contents, Exhibits, Abbreviations
Executive Summary
Chapter 1 – Introduction
Chapter 2 – Background Studies and Major Functional Design Options
Sections 2.1 to 2.6
Section 2.7
Section 2.8
Sections 2.9 to 2.12
Chapter 3 – Project Description
Sections 3.1 to 3.4
Sections 3.5.1 to 3.5.6
Sections 3.5.7 to 3.5.8
Section 3.6
Plates Part 1 (Index, Plates 1 to 45)
Plates Part 2 (Plates 46 to 89)
Chapter 4 – Existing and Future Conditions
Section 4.1.1
Sections 4.1.2 to 4.2
Chapter 5 – Impact Assessment, Mitigation and Monitoring
Chapter 6 – Consultation Process
Chapter 7 – Commitments to Future Action, Glossary of Terms and Reference List
Appendix
Cover, Table of Contents for Appendices A-H
Cover, Table of Contents for Appendicies I - J
Cover, Table of Contents for Appendices K-N
Appendix A - Air Quality Assessment Repor
Appendix B – Archaeological Assessment Report
Stage 1 Report
Executive Summary, Introduction, Section 1.0
Section 2.0 to Section 4.0
Appendix
Stage 2 Report
Text Part 1: Cover to Page 14
Text Part 2: Page 15 to End
Appendix
Appendix C – Cultural Resource Assessment Report
Appendix D – Drainage and Stormwater Management Assessment Report
Text
Appendix A – HEC-RAS Computer Outputs
Appendix B – Portals
Appendix C
Plates 1 to12
Plates 13 to 27
Plates 28 to 40
Appendix E – Geotechnical Assessment Report
Martin Grove Road to Kennedy Station
Text
Borehole Location Plan Drawings (Index, Dwgs. 1 to12)
Borehole Location Plan Drawings (Dwgs. 13 to 24)
Borehole Location Plan Drawings (Dwgs. 25 to 36)
Borehole Location Plan Drawings (Dwgs. 37 to 51)
Borehole Location Plan Drawings (Dwgs. 52 to 66)
Borehole Location Plan Drawings (Dwgs. 67 to 81)
Borehole Location Plan Drawings (Dwgs. 82 to 95)
Borehole Logs – Part 1
Borehole Logs – Part 2
Borehole Logs – Part 3
Borehole Logs – Part 4
Borehole Logs – Part 5
Borehole Logs – Part 6
Airport Section
Text
Drawings (Overview)
Drawings (Alignments 1 and 2)
Drawings (Alignments 3 and 4)
Borehole Logs – Part 1
Borehole Logs – Part 2
Appendix F – Hydrogeological Assessment Report
Text
Figures
Appendices
Appendix G – Natural Heritage Assessment Report
Text (Cover to Page 30)
Text (Page 30 to End)
Appendices
Appendix H – Noise and Vibration Assessment Report
Appendix I – Property Waste and Contamination Assessment Report
Text
Appendix A
Appendix B
Appendices C and D
Appendix J – Consolidated Traffic Report
Section 1 (Text, Appendices I to IV)
Section 1 (Appendices V to VIII)
Section 2 (Intro, Martin Grove to Jane)
Section 2 (Victoria Park to Birchmount, Summary and Conclusions)
Section 3 and Section 4
Appendix K – Jane Street to Keele Street – Vertical Alignment Options
Text
Appendix A and Appendix B
Appendix C
Appendix L – DMLRT-ECLRT Special Study Area Detailed Assessment
Text and Appendix A
Appendix B
Appendices C and D
Appendices E and F
Appendix M – Consultation
Introduction
Preliminary Planning Phase
Open House #1
Open House #2
Open House #2A
Correspondence
Transit Project Assessment Phase
Open House #3
Correspondence
Matrix of Public Comments Received and Reponses Provided
Matrix of Comments Received from Government Review Team and Responses Provided
Appendix N – Travel Demand Forecasting Report