Public Consultation
Stakeholder consultation is an important part of the Class EA process. Extensive consultation has taken place at each phase of the Class EA process with the public, residents' associations, environmental groups, City agencies, boards and commissions such as the Toronto and Region Conservation Authority (TRCA), the Toronto Transit Commission, and Waterfront Toronto, as well as the Ontario Ministry of the Environment, Ontario Ministry of Natural Resources, the Department of Fisheries & Oceans, and Environment Canada.
This page provides a record of the public consultation materials that were available to the public during each phase of the Class EA study process.
| When? | What? |
|---|---|
| June 2008* | Notice of Study Commencement |
| Mid 2008* | Public Information Centre 1: Introduction of project, problem and opportunities |
| Early 2009* | Public Information Centre 2 : Alternative solutions, evaluation |
| Mid 2010* | Public Information Centre 3: Preliminary Preferred Solution |
| June 2011* | Public Information Centre 4 : Preliminary Preferred Design |
| August 2012 | Notice of Study Completion and 45-Day Review Period |
* We have finished these. Click on the link to get the information that was available.
Notice of Study Completion and 45-Day Review Period
The Environmental Study Report (ESR) for the Don River and Central Waterfront Class EA is being placed on the public record for a 45-day public review period from August 10, 2012 to September 24, 2012. The Notice of Study Completion has been issued to notify the public, stakeholders, and review agencies of the 45-day review period and opportunity to comment.
The Environmental Study Report is available for review starting August 10, 2012 for a 45-day review period at the following locations:
- Beaches Library
2161 Queen Street East
416-393-7703 - City Hall Library
100 Queen Street West
416-393-7650 - Leaside Library
165 McRae Drive
416-396-3835 - St. Lawrence Library
171 Front Street East
416-393-7655
The ESR main report and appendices (as PDF files) are available for download using the links below. Please note: some of the files are large in size and may take time to download.
- Executive Summary (PDF 3 MB)
- Main Report (PDF 38 MB)
- Appendices for Chapters 3, 4 and 5 (PDF 41 MB)
- Appendix 5.1 – Satellite Treatment Lakefill Siting Report (PDF 6 MB)
- Appendix for Chapter 6 – Preferred Design Concept (PDF 57 MB)
- Appendix for Chapter 7 – Public Consultation (PDF 80 MB)
The ESR main report and appendices are also available for download (as PDF files) in smaller sections using the links below.
Main Report
- Appendices for Chapters 3, 4 and 5
- Appendix 3, 4 and 5 Cover and Index
- Appendix 3.1.1 – Stage 1 Archaeological Assessment – Part 1
- Appendix 3.1.2 - Stage 1 Archaeological Assessment – Part 2
- Appendix 3.2 - Cultural Heritage Assessment Report
- Appendix 3.3 – Inner Harbour Water Quality Report
- Appendix 4 – Cover and Index
- Appendix 4.1- DWF System Capacity Analysis
- Appendix 4.2 – Verification of Flow Generation
- Appendix 4.3 – Waterfront Interceptor System Behaviour
- Appendix 4.4 – Report 13
- Appendix 4.5 – Technical Scores
- Appendix 4.6 – HSI Results for Don River
- Appendix 4.7 - ABTP
- Appendix 4.8 – WWF Treatment Cost Analysis
- Appendix 4.9 – Sitings Considered for Satellite Treatment
- Appendix 5 – Cover and Index
- Appendix 5.1 – Satellite Treatment Plant Lakefill Siting Report
- Appendix for Chapter 6 – Preferred Design Concept
- Appendix 6 – Cover and Index
- Appendix 6-A – DWF Offline Tanks
- Appendix 6-B – Plan and Profiles for Tunnel Routes
- Appendix 6-C – TBM Construction Shaft Sitings
- Appendix 6-D-1 – Vertical Storage Shaft Sitings
- Appendix 6-D-2 – Vertical Storage Shaft Concept Drawings
- Appendix 6-E – WWF Offline Tanks
- Appendix 6-F-1.1 – WWF Outlets and Drop Structure Details
- Appendix 6-F-2.1 – WWF Connections – Inner Harbour West and East
- Appendix 6-F-2.2 – WWF Connections – Lower Don
- Appendix 6-F-2.3 – WWF Connections – Taylor Massey Creek
- Appendix 6-F-2.4.1 – WWF Connection sites
- Appendix 6-F-2.4.2 – WWF Connection sites
- Appendix 6-G – Satellite Treatment Plant
- Appendix 6-H – Pumping Station
- Appendix 6-I – Staging and Implementation
- Appendix 6-J – Systems Hydraulics
- Appendix for Chapter 7 – Public Consultation
- Appendix 7 – Cover and Index
- Appendix 7.1 – Stakeholder Interviews and Notice of Commencement
- Appendix 7.2 – Printed Outreach Materials
- Appendix 7.3 – Frequently Asked Questions
- Appendix 7.4 – Correspondence from Public Agencies
- Appendix 7.5.1 – Records of Public Agency Meetings – Part 1
- Appendix 7.5.2 – Records of Public Agency Meetings – Part 2
- Appendix 7.6 – First Nations Consultation Activities
- Appendix 7.7 – PIC #1 materials
- Appendix 7.8.1 – PIC #2 materials – Part 1
- Appendix 7.8.2 – PIC #2 materials – Part 2
- Appendix 7.9.1 – PIC #3 materials – Part 1
- Appendix 7.9.2 – PIC #3 materials – Part 2
- Appendix 7.9.3 – PIC #3 materials – Part 3
- Appendix 7.10 – PIC # 4 materials
- Appendix 7.11 – Sample notice of borehole drilling
If you have an enquiry, would like to provide comments, or have any outstanding issues about the Class EA study, please address them to:
James Yacoumidis
Policy, Planning and Project Consultant
Toronto Water, City of Toronto
55 John Street, 18th floor, Metro Hall
Toronto, ON M5V 3C6
Tel: 416-392-8834
Fax: 416-338-2828
TTY: 416-397-0831
E-mail: cleanwaterways@toronto.ca
Public Information Centre #4
Public Information Centre 4 involved a series of open houses, held on June 20, 22, 23 and 27, 2011 in various locations in the Study Area. The purpose of the open houses was to provide information about the preliminary preferred design and receive public feedback. Comments were and requested by July 15, 2011. View the materials from the open houses:
- Display Boards
- Participant Workbook
- Siting and Project Data book:
- Meeting Minutes
- Frequently Asked Questions
Public Information Centre #3
Public Open House
Public Information Centre 3 involved a series of open houses, held on May 4, 10 and 11, 2010 in various locations in the Study Area. The purpose of the open houses was to provide information about the preliminary Preferred Solution and to gain public feedback. Comments were invited and requested by May 21, 2010. View the meeting material:
- Display Boards
- Participant Workbook
- Meeting Minutes
Public Workshop
Stakeholders who were interested in a more detailed discussion of the process followed for this phase of the Project were invited to attend a workshop the evening of May 31, 2010.
Public Forum
A follow up session was held on September 27, 2010 to give stakeholders an additional opportunity to discuss their perspectives about the Project and the preliminary preferred alternative.
Public Information Centre #2
A Public Information Centre was held on Monday, February 23, 2009 at the Novotel Toronto Centre to present an overview of the study, the findings to date, alternative solutions being considered and how they will be evaluated. Comments were invited and requested by March 2, 2009. View the meeting material:
- Display Boards (PDF 10.3MB)
- Presentation (PDF)
- Participant Workbook (PDF)
- Frequently Asked Questions (PDF)
- Meeting Minutes (PDF)
Public Information Centre #1
A Public Information Centre was held on Thursday, July 10, 2008 at the Ontario Science Centre to present an overview of the study, the public consultation program that is proposed, and to outline the next steps in the process. View the meeting material:
- Display panels (PDF)
- Presentation (PDF)
- Comment sheet (PDF)
- Meeting Minutes (PDF)