There is a long list of new non-residential developments under construction ranging from office space to tourism attractions occurring in the city of Toronto.

Find out more about these developments below or download a list of non-residential projects.

NOTE: Pre-construction status refers to a property that has a lead tenant who is committed to occupy the property or a planning application submitted to the City of Toronto.

CIBC Square

Office: Under Construction (ETA: 2020 & 2023)

Office Space: 2,700,000 square feet

81 Bay St., Toronto, ON, Canada

1 Yonge

Office: Under Construction (ETA: TBD)

Office Space: 1,658,000 square feet

Southcore

Office: Under Construction (ETA: 2020)

Office Space: 879,000 square feet

16 York St., Toronto, ON, Canada

100 Queen Quay East

Office: Under Construction (ETA: 2021)

Office Space: 763,000 square feet

BMO Yonge-Dundas "Urban Campus"

Office: Under Construction (ETA: 2021)

Office Space: 346,000 square feet

290 Yonge St., Toronto, ON, Canada

Daniels Waterfront

Office: Under Construction (ETA: 2019)

Office Space: 280,000 square feet

130 Queen St. E., Toronto, ON, Canada

King Portland Centre

Office: Under Construction (ETA: Q1 2019)

Office Space: 255,565 square feet

620 King St. W., Toronto, ON, Canada

500 Lake Shore Boulevard West

Office: Under Construction (ETA: Spring 2019)

Office Space: 143,000 square feet

40 Hanna Avenue

Office: Under Construction (ETA: TBD)

Office Space: 118,446 square feet

150 Sterling Road

Office: Under Construction (ETA: Fall 2017)

Office Space: 100,000 square feet

60 Atlantic Avenue

Office: Under Construction (ETA: 2017)

Office Space: 85,000 square feet

430 Bathurst Street

Office: Under Construction (ETA: Spring 2018)

Office Space: 70,000 square feet

Commerce Court Complex

Office: Pre-construction (ETA:TBD)

Office Space: 1,940,292 square feet

56 Yonge St., 21 Melinda St., 18 to 30 Wellington St. W., 187 to 199 Bay St. and 25 King St. W.

45 Bay Street

Office: Pre-construction (ETA: 2018)

Office Space: 1,200,000 square feet

160 Front Street West

Office: Pre-construction (ETA: TBD)

Office Space: 1,120,000 square feet

Union Centre

Office: Pre-construction (ETA: 2018)

Office Space: 1,000,000 square feet

171 Front St. W., Toronto, ON, Canada

The Well

Office/Retail: Pre-construction (ETA: 2018)

Office Space: 1,000,000 square feet

Retail Space: 12,583 square feet

440 Front St. W., Toronto, ON, Canada

30 Bay Street

Office: Pre-construction (ETA: 2017)

Office Space: 944,000 square feet

Bay Adelaide North Tower

Office: Pre-construction (ETA: 2017)

Office Space: 900,000 square feet

40 Temperance St., Toronto, ON, Canada

388 King Street West & 82 Peter Street

Office: Pre-construction (ETA: 2017)

Office Space: 820,000 square feet

StudioCentre

Office: Pre-construction (ETA: TBD)

Office Space: 750,000 square feet

629 Eastern Ave., Toronto, ON, Canada

844 Don Mill Road

Office: Pre-construction (ETA: TBD)

Office Space: 605,448 square feet

GM Canada Mobility Campus

Office/Research: Pre-construction (ETA: TBD)

Office Space: 528,712 square feet

R&D Workshop: 2,562 square feet

721 Eastern Ave., Toronto, ON, Canada

7-15 Fraser Avenue

Office: Pre-construction (ETA: TBD)

Office Space: 500,000 square feet

Bayside Toronto

Office: Pre-construction (ETA: TBD)

Office Space: 400,000 square feet

261 Queens Quay E., Toronto, ON, Canada

25 Ontario Street

Office: Pre-construction (ETA: 2019-2020)

Office Space: 400,000 square feet

Waterfront Innovation Centre

Office: Pre-construction (ETA: 2019)

Office Space: 350,000 square feet

125 and 155 Queen St. E., Toronto, ON, Canada

65-75, 79-81, 83, and 85-89 King Street East

Office: Pre-construction (ETA: TBD)

Office Space: 389,083 square feet

2 Tecumseth Street

Office: Pre-construction (ETA: TBD)

Office Space: 290,443 square feet

595 Bay Street

Office: Pre-construction (ETA: TBD)

Office Space: 285,000 square feet

58 Atlantic Avenue & 25 Liberty (renovation)

Office: Pre-construction (ETA: TBD)

Office Space: 275,000 square feet

99 Atlantic Avenue (renovation)

Office: Pre-construction (ETA: TBD)

Office Space: 192,000 square feet

49 Spadina Avenue

Office: Pre-construction (ETA: TBD)

Office Space: 188,800 square feet

100 Simcoe Street

Office: Pre-construction (ETA: TBD)

Office Space: 184,827 square feet

80 Atlantic Avenue

Office: Pre-construction (ETA: Spring 2018)

Office Space: N/A

19 Duncan Street

Office: Pre-construction (ETA: 2021)

Office Space: N/A

ORCA Project

Office: Pre-construction (ETA: TBD)

Office Space: N/A

433 Front St. W., Toronto, ON, Canada

East Harbour

Office: Pre-construction (ETA: TBD)

Office Space: N/A

21 Don Roadway, Toronto, ON, Canada

SteelessTech Campus (expansion)

Office/Industrial/Retail: Pre-construction (ETA: TBD)

Office Space : 798,026 square feet (68% of total GFA)

Industrial Space: 222,210 square feet (19% of total GFA)

Retail Space: 12,583 square feet (1% of total GFA)

3125 Steeles Ave. E., North York, ON, Canada

FGF Brands (new building)

Industrial: Under Construction

Estimated Investment: $50 million

1235 Ormont Dr., North York, ON, Canada

Toronto Research Chemical (expansion)

Industrial: Under Construction

Estimated Investment: N/A

2 Brisbane Rd., North York, ON, Canada

Tiffany Gate Foods (expansion)

Industrial: Under Construction

Estimated Investment: $18 million

198 Steinway Blvd., Etobicoke, ON, Canada

Fortress Technology (expansion)

Industrial: Under Construction

Estimated Investment: $2.25 million

51 Grand Marshall Dr., Scarborough, ON, Canada

Leland Industries (expansion)

Industrial: Under Construction

Estimated Investment: N/A

95 Commander Blvd., Scarborough, ON, Canada

Steam Whistle Brewery (expansion)

Industrial: Pre-construction (ETA: TBD)

Estimated Investment: $18 million

255 Bremner Blvd., Toronto, ON, Canada

Canada Goose (expansion)

Industrial: Pre-construction

Estimated Investment: $14 million

1381 Castlefield Ave., York, ON, Canada

Sherway Gardens Mall (expansion)

Retail: Under Construction

Estimated Investment: $350 million

25 The West Mall, Etobicoke, ON, Canada

Yorkdale Mall (expansion)

Retail: Under Construction

Retail Space: 300,000 square feet

Estimated Investment: $331 million

3401 Dufferin St., North York, ON, Canada

Massey Hall (revitalization)

Creative Space: Under Construction

Estimated Investment: $135 million

178 Victoria St., Toronto, ON, Canada

Pinewood Toronto Studios (expansion)

Creative Space: Under Construction

Estimated Investment: $40 million

255 Commissioners St., Toronto, ON, Canada

Proper Television (renovation)

Creative Space: Under Construction

Estimated Investment: $5 million

772 Dovercourt Rd., Toronto, ON, Canada

Cinaspace Film Studios (expansion)

Creative Space: Pre-construction

Creative Space: 54,000 square feet

Estimated Investment: $15 million

777 Kipling Ave., Etobicoke, ON, Canada

Threatre Museum of Canada

Creative Space: Under Construction

Estimated Investment: N/A

335 King St. W., Toronto, ON, Canada

Humber River Regional Hospital & Forensic Science Lab

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $765 million

Keele St. and Wilson Ave.

Sanofi Paster Connaught Campus - new pharmaceutical facility

Academic/Research/Medical/Health: Under Construction (ETA: 2021)

Estimated Investment: $500 million

 

St. Michael's Hospital (expansion)

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $301 million

30 Bond St., Toronto, ON, Canada

More Information

CAMH - Phase 1C

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $250 million

1001 Queen St. W., Toronto, ON, Canada

More Information

William Osler Health System (Etobicoke General)

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $200 million

101 Humber College Blvd., Etobicoke, ON, Canada

More Information

University of Toronto - Centre for Innovation, Technology and Entrepreneurship (CITE)

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $200 million

55 St George St., Toronto, ON, Canada

More Information

Ryerson University - Daphne Cockwell Health Centre Complex

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $156 million

270 Church St., Toronto, ON, Canada

More Information

Kipling Acres - Long Term Care

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $79 million

2233 Kipling Ave., Etobicoke, ON, Canada

More Information

Ontario College of Art and Design University (OCAD) (expansion)

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $60 million

100 McCaul St., Toronto, ON, Canada

More Information

University of Toronto - Daniels Faculty of Architecture, Landscape and Design (expansion)

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $50 million

1 Spadina Cres., Toronto, ON, Canada

University of Toronto - Robarts Library (second phase of renovation)

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $35 million

130 St George St., Toronto, ON, Canada

More Information

Ryerson University - Centre for Urban Innovation

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $19.8 million

44 Gerrard St. E., Toronto, ON, Canada

More Information

Humber College - Welcome Centre

Academic/Research/Medical/Health: Under Construction

Estimated Investment: N/A

2 Colonel Samuel Smith Park Dr., Etobicoke, ON, Canada

York University - Student Centre

Academic/Research/Medical/Health: Under Construction

Estimated Investment: N/A

4700 Keele St., North York, ON, Canada

More Information

York University - Schulin Research and Graduate Building

Academic/Research/Medical/Health: Under Construction (ETA: Spring 2018)

Estimated Investment: N/A

4700 Keele St., North York, ON, Canada

Centennial College - Downsview Park Aerospace Campus

Academic/Research/Medical/Health: Under Construction (ETA: 2018)

Estimated Investment: N/A

65 Carl Hall Rd., North York, ON, Canada

More Information

Ontario Court of Justice Toronto

Institutional: Under Construction (ETA: Spring 2022)

Estimated Investment: $956.4 million

11 Centre St., Toronto, ON, Canada

SickKids Hospital (expansion)

Academic/Research/Medical/Health: Pre-construction

Space: 479,209 square feet

Estimated Investment: N/A

175 Elizabeth St., Toronto, ON, Canada

Michael Garron Hospital (renovation)

Academic/Research/Medical/Health: Pre-construction (ETA: 2022)

Estimated Investment: N/A

825 Coxwell Ave., East York, ON, Canada

More Information

Wexford Residence Inc (Long Term Care)

Academic/Research/Medical/Health: Pre-construction (ETA:TBD)

Estimated Investment: N/A

1860 Lawrence Ave. E., Scarborough, ON, Canada

George Street Revitalization - Redevelopment of Seaton House

Academic/Research/Medical/Health: Pre-construction (ETA:TBD)

Estimated Investment: $50 million

339 George St., Toronto, ON, Canada

Eglinton LRT

Infrastructure: Under Construction (ETA: 2020)

Estimated Investment: $4.9 billion

Eglinton Ave. E. and Yonge St.

Union Station Revitalization (and York Street PATH Connection)

Infrastructure: Under Construction

Estimated Investment: $795 million

75 Front St. W., Toronto, ON, Canada

Leslie Barns (Streetcar Maintenance and Storage)

Infrastructure: Under Construction

Estimated Investment: $500 million

1313 Lake Shore Blvd. E., Toronto, ON, Canada

Toronto Hydro - Bremmer Transformer Station

Infrastructure: Under Construction

Estimated Investment: $272 million

25 Rees St., Toronto, ON, Canada

GO Bus Terminal at Union Station

Infrastructure: Under Construction

Estimated Investment: $102 million

81 Bay St., Toronto, ON, Canada

City of Toronto Green Bin Processing Facility

Infrastructure: Under Construction

Estimated Investment: $75 million

120 Disco Rd., Etobicoke, ON, Canada

Dufferin Organics Processing Facility

Infrastructure: Under Construction

Estimated Investment: $70.5 million

35 and 75 Vanley Cres., North York, ON, Canada

More information

Sheraton Centre Toronto (renovation)

Tourism: Under Construction

Estimated Investment: $90 million

123 Queen St. W., Toronto, ON, Canada

Ken Shaw Lexus Toyota

Retail: Under construction (ETA: TBD)

Estimated Investment: N/A

2336 St Clair Ave. W., Toronto, ON, Canada

Sear's warehouse (redevelopment)

Retail: Pre-construction (ETA: TBD)

2200 Islington Ave., Etobicoke, ON, Canada

Title Description
CIBC Square

Office: Under Construction (ETA: 2020 & 2023)

Office Space: 2,700,000 square feet

81 Bay St., Toronto, ON, Canada

1 Yonge

Office: Under Construction (ETA: TBD)

Office Space: 1,658,000 square feet

Southcore

Office: Under Construction (ETA: 2020)

Office Space: 879,000 square feet

16 York St., Toronto, ON, Canada

100 Queen Quay East

Office: Under Construction (ETA: 2021)

Office Space: 763,000 square feet

BMO Yonge-Dundas "Urban Campus"

Office: Under Construction (ETA: 2021)

Office Space: 346,000 square feet

290 Yonge St., Toronto, ON, Canada

Daniels Waterfront

Office: Under Construction (ETA: 2019)

Office Space: 280,000 square feet

130 Queen St. E., Toronto, ON, Canada

King Portland Centre

Office: Under Construction (ETA: Q1 2019)

Office Space: 255,565 square feet

620 King St. W., Toronto, ON, Canada

500 Lake Shore Boulevard West

Office: Under Construction (ETA: Spring 2019)

Office Space: 143,000 square feet

40 Hanna Avenue

Office: Under Construction (ETA: TBD)

Office Space: 118,446 square feet

150 Sterling Road

Office: Under Construction (ETA: Fall 2017)

Office Space: 100,000 square feet

60 Atlantic Avenue

Office: Under Construction (ETA: 2017)

Office Space: 85,000 square feet

430 Bathurst Street

Office: Under Construction (ETA: Spring 2018)

Office Space: 70,000 square feet

Commerce Court Complex

Office: Pre-construction (ETA:TBD)

Office Space: 1,940,292 square feet

56 Yonge St., 21 Melinda St., 18 to 30 Wellington St. W., 187 to 199 Bay St. and 25 King St. W.

45 Bay Street

Office: Pre-construction (ETA: 2018)

Office Space: 1,200,000 square feet

160 Front Street West

Office: Pre-construction (ETA: TBD)

Office Space: 1,120,000 square feet

Union Centre

Office: Pre-construction (ETA: 2018)

Office Space: 1,000,000 square feet

171 Front St. W., Toronto, ON, Canada

The Well

Office/Retail: Pre-construction (ETA: 2018)

Office Space: 1,000,000 square feet

Retail Space: 12,583 square feet

440 Front St. W., Toronto, ON, Canada

30 Bay Street

Office: Pre-construction (ETA: 2017)

Office Space: 944,000 square feet

Bay Adelaide North Tower

Office: Pre-construction (ETA: 2017)

Office Space: 900,000 square feet

40 Temperance St., Toronto, ON, Canada

388 King Street West & 82 Peter Street

Office: Pre-construction (ETA: 2017)

Office Space: 820,000 square feet

StudioCentre

Office: Pre-construction (ETA: TBD)

Office Space: 750,000 square feet

629 Eastern Ave., Toronto, ON, Canada

844 Don Mill Road

Office: Pre-construction (ETA: TBD)

Office Space: 605,448 square feet

GM Canada Mobility Campus

Office/Research: Pre-construction (ETA: TBD)

Office Space: 528,712 square feet

R&D Workshop: 2,562 square feet

721 Eastern Ave., Toronto, ON, Canada

7-15 Fraser Avenue

Office: Pre-construction (ETA: TBD)

Office Space: 500,000 square feet

Bayside Toronto

Office: Pre-construction (ETA: TBD)

Office Space: 400,000 square feet

261 Queens Quay E., Toronto, ON, Canada

25 Ontario Street

Office: Pre-construction (ETA: 2019-2020)

Office Space: 400,000 square feet

Waterfront Innovation Centre

Office: Pre-construction (ETA: 2019)

Office Space: 350,000 square feet

125 and 155 Queen St. E., Toronto, ON, Canada

65-75, 79-81, 83, and 85-89 King Street East

Office: Pre-construction (ETA: TBD)

Office Space: 389,083 square feet

2 Tecumseth Street

Office: Pre-construction (ETA: TBD)

Office Space: 290,443 square feet

595 Bay Street

Office: Pre-construction (ETA: TBD)

Office Space: 285,000 square feet

58 Atlantic Avenue & 25 Liberty (renovation)

Office: Pre-construction (ETA: TBD)

Office Space: 275,000 square feet

99 Atlantic Avenue (renovation)

Office: Pre-construction (ETA: TBD)

Office Space: 192,000 square feet

49 Spadina Avenue

Office: Pre-construction (ETA: TBD)

Office Space: 188,800 square feet

100 Simcoe Street

Office: Pre-construction (ETA: TBD)

Office Space: 184,827 square feet

80 Atlantic Avenue

Office: Pre-construction (ETA: Spring 2018)

Office Space: N/A

19 Duncan Street

Office: Pre-construction (ETA: 2021)

Office Space: N/A

ORCA Project

Office: Pre-construction (ETA: TBD)

Office Space: N/A

433 Front St. W., Toronto, ON, Canada

East Harbour

Office: Pre-construction (ETA: TBD)

Office Space: N/A

21 Don Roadway, Toronto, ON, Canada

SteelessTech Campus (expansion)

Office/Industrial/Retail: Pre-construction (ETA: TBD)

Office Space : 798,026 square feet (68% of total GFA)

Industrial Space: 222,210 square feet (19% of total GFA)

Retail Space: 12,583 square feet (1% of total GFA)

3125 Steeles Ave. E., North York, ON, Canada

FGF Brands (new building)

Industrial: Under Construction

Estimated Investment: $50 million

1235 Ormont Dr., North York, ON, Canada

Toronto Research Chemical (expansion)

Industrial: Under Construction

Estimated Investment: N/A

2 Brisbane Rd., North York, ON, Canada

Tiffany Gate Foods (expansion)

Industrial: Under Construction

Estimated Investment: $18 million

198 Steinway Blvd., Etobicoke, ON, Canada

Fortress Technology (expansion)

Industrial: Under Construction

Estimated Investment: $2.25 million

51 Grand Marshall Dr., Scarborough, ON, Canada

Leland Industries (expansion)

Industrial: Under Construction

Estimated Investment: N/A

95 Commander Blvd., Scarborough, ON, Canada

Steam Whistle Brewery (expansion)

Industrial: Pre-construction (ETA: TBD)

Estimated Investment: $18 million

255 Bremner Blvd., Toronto, ON, Canada

Canada Goose (expansion)

Industrial: Pre-construction

Estimated Investment: $14 million

1381 Castlefield Ave., York, ON, Canada

Sherway Gardens Mall (expansion)

Retail: Under Construction

Estimated Investment: $350 million

25 The West Mall, Etobicoke, ON, Canada

Yorkdale Mall (expansion)

Retail: Under Construction

Retail Space: 300,000 square feet

Estimated Investment: $331 million

3401 Dufferin St., North York, ON, Canada

Massey Hall (revitalization)

Creative Space: Under Construction

Estimated Investment: $135 million

178 Victoria St., Toronto, ON, Canada

Pinewood Toronto Studios (expansion)

Creative Space: Under Construction

Estimated Investment: $40 million

255 Commissioners St., Toronto, ON, Canada

Proper Television (renovation)

Creative Space: Under Construction

Estimated Investment: $5 million

772 Dovercourt Rd., Toronto, ON, Canada

Cinaspace Film Studios (expansion)

Creative Space: Pre-construction

Creative Space: 54,000 square feet

Estimated Investment: $15 million

777 Kipling Ave., Etobicoke, ON, Canada

Threatre Museum of Canada

Creative Space: Under Construction

Estimated Investment: N/A

335 King St. W., Toronto, ON, Canada

Humber River Regional Hospital & Forensic Science Lab

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $765 million

Keele St. and Wilson Ave.

Sanofi Paster Connaught Campus - new pharmaceutical facility

Academic/Research/Medical/Health: Under Construction (ETA: 2021)

Estimated Investment: $500 million

 

St. Michael's Hospital (expansion)

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $301 million

30 Bond St., Toronto, ON, Canada

More Information

CAMH - Phase 1C

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $250 million

1001 Queen St. W., Toronto, ON, Canada

More Information

William Osler Health System (Etobicoke General)

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $200 million

101 Humber College Blvd., Etobicoke, ON, Canada

More Information

University of Toronto - Centre for Innovation, Technology and Entrepreneurship (CITE)

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $200 million

55 St George St., Toronto, ON, Canada

More Information

Ryerson University - Daphne Cockwell Health Centre Complex

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $156 million

270 Church St., Toronto, ON, Canada

More Information

Kipling Acres - Long Term Care

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $79 million

2233 Kipling Ave., Etobicoke, ON, Canada

More Information

Ontario College of Art and Design University (OCAD) (expansion)

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $60 million

100 McCaul St., Toronto, ON, Canada

More Information

University of Toronto - Daniels Faculty of Architecture, Landscape and Design (expansion)

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $50 million

1 Spadina Cres., Toronto, ON, Canada

University of Toronto - Robarts Library (second phase of renovation)

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $35 million

130 St George St., Toronto, ON, Canada

More Information

Ryerson University - Centre for Urban Innovation

Academic/Research/Medical/Health: Under Construction

Estimated Investment: $19.8 million

44 Gerrard St. E., Toronto, ON, Canada

More Information

Humber College - Welcome Centre

Academic/Research/Medical/Health: Under Construction

Estimated Investment: N/A

2 Colonel Samuel Smith Park Dr., Etobicoke, ON, Canada

York University - Student Centre

Academic/Research/Medical/Health: Under Construction

Estimated Investment: N/A

4700 Keele St., North York, ON, Canada

More Information

York University - Schulin Research and Graduate Building

Academic/Research/Medical/Health: Under Construction (ETA: Spring 2018)

Estimated Investment: N/A

4700 Keele St., North York, ON, Canada

Centennial College - Downsview Park Aerospace Campus

Academic/Research/Medical/Health: Under Construction (ETA: 2018)

Estimated Investment: N/A

65 Carl Hall Rd., North York, ON, Canada

More Information

Ontario Court of Justice Toronto

Institutional: Under Construction (ETA: Spring 2022)

Estimated Investment: $956.4 million

11 Centre St., Toronto, ON, Canada

SickKids Hospital (expansion)

Academic/Research/Medical/Health: Pre-construction

Space: 479,209 square feet

Estimated Investment: N/A

175 Elizabeth St., Toronto, ON, Canada

Michael Garron Hospital (renovation)

Academic/Research/Medical/Health: Pre-construction (ETA: 2022)

Estimated Investment: N/A

825 Coxwell Ave., East York, ON, Canada

More Information

Wexford Residence Inc (Long Term Care)

Academic/Research/Medical/Health: Pre-construction (ETA:TBD)

Estimated Investment: N/A

1860 Lawrence Ave. E., Scarborough, ON, Canada

George Street Revitalization - Redevelopment of Seaton House

Academic/Research/Medical/Health: Pre-construction (ETA:TBD)

Estimated Investment: $50 million

339 George St., Toronto, ON, Canada

Eglinton LRT

Infrastructure: Under Construction (ETA: 2020)

Estimated Investment: $4.9 billion

Eglinton Ave. E. and Yonge St.

Union Station Revitalization (and York Street PATH Connection)

Infrastructure: Under Construction

Estimated Investment: $795 million

75 Front St. W., Toronto, ON, Canada

Leslie Barns (Streetcar Maintenance and Storage)

Infrastructure: Under Construction

Estimated Investment: $500 million

1313 Lake Shore Blvd. E., Toronto, ON, Canada

Toronto Hydro - Bremmer Transformer Station

Infrastructure: Under Construction

Estimated Investment: $272 million

25 Rees St., Toronto, ON, Canada

GO Bus Terminal at Union Station

Infrastructure: Under Construction

Estimated Investment: $102 million

81 Bay St., Toronto, ON, Canada

City of Toronto Green Bin Processing Facility

Infrastructure: Under Construction

Estimated Investment: $75 million

120 Disco Rd., Etobicoke, ON, Canada

Dufferin Organics Processing Facility

Infrastructure: Under Construction

Estimated Investment: $70.5 million

35 and 75 Vanley Cres., North York, ON, Canada

More information

Sheraton Centre Toronto (renovation)

Tourism: Under Construction

Estimated Investment: $90 million

123 Queen St. W., Toronto, ON, Canada

Ken Shaw Lexus Toyota

Retail: Under construction (ETA: TBD)

Estimated Investment: N/A

2336 St Clair Ave. W., Toronto, ON, Canada

Sear's warehouse (redevelopment)

Retail: Pre-construction (ETA: TBD)

2200 Islington Ave., Etobicoke, ON, Canada

Summary of current non-residential projects

Office Space

  • About 7.4 million square feet of office space are currently under construction.
  • Toronto has more than 15 million square feet of office space in pre-construction stage (28 projects).

Industrial Space

  • Over $100 million has been invested in creating more industrial space in the city in the last two years, including a new building for FGF Brands and an expansion for Tiffany Gate Foods.

Retail Space

  • Several retail projects worth $681 million are currently under construction in the city.

Creative Space

  • Several large projects ($180 million) are currently under construction to support and expand creative industries in the city, including the revitalization of Massey Hall.

Academic/Research/Medical/Health

  • Hospitals, universities and colleges in the city are investing over $2 billion to expand current facilities and construct new facilities.
  • SickKids Hospital submitted its application in February 2018 for a proposed development which will include 479,209 square feet of non-residential GFA.

Infrastructure

  • A number of major infrastructure projects are under way in the city with an approximate investment of $6.7 billion, including the Eglinton LRT, Union Station Revitalization and Leslie Barns.

(Updated on April 16, 2018)