Zoning Amendment Application - Humber River Regional Hospital
(Wards 6 and 27 - North York Humber and York Humber)
The Planning and Transportation Committee recommends
Purpose:
On January 11, 1999, Urban Economic Development Committee (UEDC) discussed the
December 18, 1998 Urban Planning and Development Services report regarding the
rezoning of the Humber River Regional Hospital (HRRH) on Church Street. UEDC
referred the report back to staff to permit further community consultation. This report
provides supplementary information on the revised plans and community
consultation, and is presented to the Transportation and Planning Committee to
enable the statutory Public Meeting. It is recommended that zoning be enacted to
permit a 2,415mē expansion of the Emergency Ward and related Imaging Services. The
report also recommends that any other expansion beyond this be subject to a Holding
Zone with further transportation impact analysis required.
Financial Implications:
All of the costs associated with the processing of this application are included within
the 1999 Operating Budget.
Recommendations:
It is recommended that the rezoning application for 200 Church Street be approved subject to the following
conditions:
(1) the zoning be amended to a hospital zone in accordance with an implementing zoning by-law which generally
complies with the draft by-law attached as Schedule "E";
(2) prior to the enactment of the zoning by-law, all requirements in accordance with the Municipal Act be met with
respect to the closure and sale of the following portions of roads (all within the former municipality of the City of
North York) to the Humber River Regional Hospital on terms and conditions to be determined by City Council:
(i) the southern 15.27 metres of Longview Drive; and
(ii) the closed portions on Woodward Drive on the east and west sides of the hospital;
(3) that an "H" holding designation be imposed on the proposed south addition (Phase 2). The lifting of the "H" by
City Council would be subject to the following conditions being met:
(i) an updated traffic impact study be prepared and submitted to the satisfaction of the Commissioner of Works
and Emergency Services that demonstrates that sufficient capacity is available to accommodate the additional
traffic generated by the Phase 2 (south) expansion, and that the development would not result in an unacceptable
level of arterial road service; and
(ii) a building permit has been issued for the west parking deck.
(4) the design principles outlined in Schedule "A" in the Final Report dated December 18, 1998 be considered in the
review of a site plan application;
(5) the conditions of the Works and Emergency Services Department as set out in Schedules "G", "H1" and "I" in
the Final Report dated December 18, 1998, and Appendix "D" in this report, be met;
(6) the conditions of the Public Health Department as set out in Schedules "K1" and "K2" in the Final Report
dated December 18, 1998 be met;
(7) the conditions of the utilities as set out is Schedules "M1", "M2" and "M3" in the Final Report dated December
18, 1998 be met;
(8) that the City Solicitor and Planning Staff do all things necessary to prepare and perfect the implementing
zoning by-law.
Procedural Steps
(1) On November 9, 1999, North York Community Council discussed the report from Real Estate and Facilities
regarding the closure and sale of portions of Longview Drive and Woodward Avenue.
(2) The Planning and Transportation Committee consideration of this current report is the statutory Public
Meeting under the Planning Act.
(3) On November 29, 1999, the Planning and Transportation Committee is receiving a report from Works and
Emergency Services to authorize the initiation of the appropriate road closure procedures.
(4) The Public Meeting for the road closing will be scheduled in early 2000 at Planning and Transportation
Committee once the appropriate notice has been provided. Provided that both the rezoning and road closing are
approved, then Council can enact a zoning by-law.
Background:
In January 1998 HRRH filed the original rezoning application for the hospital expansion. HRRH now requires a
rezoning to allow for the expansion of the hospital in two phases. The first and most immediate need is for a
2,415mē expansion of the emergency ward and related imaging services. The second phase is a potential 3,409mē
expansion at a later date, for a combined total expansion of 5,824mē.
At the January 1999 UEDC meeting, the Committee did not hear deputations, but referred the application back to
staff for further community consultation.
During the time taken for additional public consultation, HRRH initiated revisions to the plans which were in
response to community input and the changing nature of the health care delivery. The revisions included a slightly
enlarged south addition, which would necessitate additional parking in the anticipated form of a parking structure
on the existing west parking lot. Statistical details of the expansion are summarized on Table 1.
As per UEDC direction in January 1999, further community consultation was held in each former municipality as
outlined in this report. This report also consolidates all of the recommendations of the December 18, 1998 Final
Report and those arising from the revisions.
Site and Surrounding Area:
The site is bounded by Church Street, Uphill Avenue, Pelmo Crescent, Queenslea Avenue and Pine Street, and is
currently occupied by the hospital and 11 detached houses (see Schedules "A", "B" and "C"). The block straddles
the former municipal boundaries of York and North York. The main access to the hospital building is from Uphill
Avenue and is served by a visitor/patient parking lot adjacent to that access. Staff parking lots are located on the
west and north sides of the building. The height of the existing hospital varies between 2 and 7 storeys. Three
houses in private ownership and a 10-storey building containing a school are also located on the hospital block.
Original Proposal:
HRRH applied for a rezoning in January 1998 to allow for the following:
- a 2-storey expansion to the emergency wing on the north side of the hospital;
- a 3-storey addition to the mental health wing on the south side of the building; and
- a 2-storey parking garage structure to replace an existing surface parking lot and four houses fronting Church
Street at the southeast side of the site.
A Final Planning report dated December 18, 1998 recommending approval of the rezoning application, subject to
conditions, was prepared for consideration by UEDC.
Revised Proposal:
After further community consultation and the addition of the property at 52 Uphill Avenue to the site, HRRH
revised their application. The most recent revisions are for a phased project.
Phase 1 involves the expansion of the emergency wing and the expanded parking garage on the east side of the
hospital. The larger parking garage is made possible by the hospital purchase of 52 Uphill Avenue. In response to a
request from the community, the hospital-owned house at 54 Uphill Avenue will be retained as a house-form
building which will be an appropriate separation between the parking garage and the existing two privately-owned
residences on Pelmo Crescent.
Phase 2 is a 4-storey, 3,409mē south addition on the Church Street side, which may be required in the future. The
revised proposal adds a fourth floor to this south addition, which is stepped back from the lower three floors to
ensure minimal impact. See Schedule "D2" for elevations. The community had asked how much more expansion
could be expected on the site and Phase 2 was a response to that question. Phase 2 is proposed to form part of the
zoning by-law at this time and gives a final build out envelope to the site over the long term.
Given the unknown (possibly long term) time frame, the current uncertainty of the HRRH program that could in
the future occupy this space, and the complexity of the access/traffic and parking issues generated by Phase 2, a
Holding designation in the zoning by-law is proposed.
In order to lift the Holding designation and construct Phase 2, HRRH would need to fulfill several conditions.
These conditions would include a traffic study of Phase 2 and its impacts, with recommendations subject to the
satisfaction of the Commissioner of Works and Emergency Services.
It is currently expected that the south addition would trigger the need for a 2-storey parking structure to be
constructed on the west parking lot. This is anticipated to accommodate approximately 115 staff parking spaces,
and increase total on-site parking to 931 spaces. Statistics of the original and revised proposal are outlined below.
Table 1 - Project Information
Item |
Jan. 1999 Statistics |
Revised Statistics |
Site Area |
45,190 mē |
45,771 mē |
Emergency Addition (North) - phase
1 |
2,415 mē |
2,415 mē |
Church St. Addition (South) - phase 2 |
2,745 mē |
3,409 mē |
Total Additions |
5,160 mē |
5,824 mē |
Existing Gross Floor Area |
32,810 mē |
32,810 mē |
Existing Total Density |
0.73 FSI |
0.72 FSI |
Proposed Total Density - for Phase 1 |
0.78 FSI (35,225 mē) |
0.77 FSI (35,225 mē) |
Proposed Total Density - for Phase 1
& 2 |
0.84 FSI (37,970 mē) |
0.84 FSI (38,634 mē) |
Proposed East Parking Deck (Uphill) |
257 spaces |
382 spaces |
Proposed West Parking Deck |
Not proposed |
115 spaces |
West Surface Parking Lot |
271 spaces |
294 spaces |
North Surface Parking Lot |
148 spaces |
140 spaces |
Existing Parking |
526 spaces |
526 spaces |
Total Parking Phase 1 (north
addition only) |
676 spaces |
816 spaces |
Total Parking Phase 2 (north & south
additions) |
676 spaces |
931 spaces |
The issue of the accommodation of a day-care centre at the site was discussed in the December 1998 report. Since
then, the day-care operator has found a permanent home at another location, and therefore this issue is no longer
relevant.
Community Consultation:
In order to fully explore the application with the community, two working groups were set up to discuss design and
massing and parking and traffic. In addition, the six area councillors were directed by UEDC to form the Advisory
Committee on Hospital Restructuring Matters. The working groups and committee met frequently in 1998 to
discuss the proposal (see Appendices "A" and "C" for the meeting minutes).
As part of the community participation process, three information meetings were held in 1998, one in May and two
in November. The latter were held as Open Houses in each former municipality.
Further to the January 1999 UEDC directive to undertake further consultation, two more meetings, one in each
former municipality, were held on February 11 and March 4, 1999 (see Appendices "B" and "C" for motions made
at these meetings and the minutes).
The HRRH then decided to revise its application. A further Working Group meeting was held on June 17, 1999 to
discuss the revised proposal (Appendix "A"). Further community meetings were also held on September 16 and 30,
1999 (Appendix "C"). A number of issues were raised, including the amount of staff parking, the adequacy of
sewer and water services, and the length of time to construct the parking garage. These items were addressed and
are in the attached minutes.
The community was not satisfied with the original proposal and expressed opposition to HRRH expansion based on
the issues noted above. At the March 4, 1999 community meeting described above, an overwhelming majority voted
to recommend to City Council that the application be refused. With respect to the revised proposal, the community
did not express a higher level of satisfaction with those alterations that attempted to address their concerns.
Comments:
Built Form:
The revisions to built form include modification to the south addition by adding one additional floor stepped back
from the lower three and the addition of a second parking deck on the west side of the site. There is no change to
the second phase footprint or the setback from the street.
The Phase 2 addition is nine percent of the overall building and does not impact the Church Street streetscape, as it
would maintain a large front yard setback and green open space. Site Plan Approval will ensure proper landscape
treatment, access and lighting.
The design principles outlined in the December 1998 report are still pertinent to the proposal.
Traffic, Parking and Sewer/Water:
The Transportation Services Division, Works and Emergency Services has reviewed the updated traffic impact and
parking study (June 1999) submitted by the applicant's consultant and concurs that the adjacent road network can
accommodate the additional a.m. and p.m. peak hour site-generated traffic as a result of the Phase 1 (north)
expansion and revised site accesses (See Appendix "D").
The desire for traffic calming measures was identified during the public consultation process and identified in the
December 1998 report. Any traffic calming measures are to be reviewed in consultation with the Councillors, local
community, the hospital and Works and Emergency Services staff with the occupation of the Phase 1 (north)
expansion and any subsequent additions.
The proposed parking supply for the Phase 1 (north) expansion (for the emergency care services) represents an
increase of 290 parking spaces for a total on-site parking supply of 816 spaces, of which 215 are proposed as visitor
spaces. The updated traffic and parking study indicates that the future parking demand can be met by the addition
of the proposed east parking deck, and is acceptable to the Transportation Services Division. In this regard, the
current proposal would translate into a parking ratio of one space per 47 m2 of gross floor area for the entire site.
The kind of health care delivery that would prompt the expansion of the south portion of the building (Phase 2) has
not been settled. Previous plans to enlarge the existing mental health wing are not being pursued at present. The
traffic impacts of this expansion will be affected by the kind of expanded health care delivery which is to be
accommodated. Given that the community has expressed concerns with the potential for additional traffic resulting
from the Phase 2 (south) expansion, a mechanism is required to provide a basis for further evaluation of the
impacts of the HRRH expansion. Therefore, it is recommended that a Holding Zone Provision in the proposed
zoning by-law be placed on the future Phase 2 (south) addition, which could be lifted subject to the following
criteria:
- an updated traffic impact study be prepared and submitted to the satisfaction of the Commissioner of Works and
Emergency Services that demonstrates that sufficient capacity is available to accommodate the additional traffic
generated by the Phase 2 (south) expansion, and that the development would not result in an unacceptable level of
arterial road service; and
- a building permit must be issued for the west parking deck.
The building envelope and density of the south addition and west parking structure are established in the proposed
HOS Zoning By-law. The design, landscaping and other details of the Phase 2 addition will be reviewed at the Site
Plan Approval stage.
Works and Emergency Services have advised that there is adequate water and sanitary and storm sewer capacity to
serve the hospital.
Conclusions:
The revised plans have been reviewed with respect to design, traffic and parking. Planning staff have no objection
to the extension and redesign of the east parking deck, potential Phase 2 west parking deck and south addition. As a
further precaution for the latter phased development, a Hold provision is recommended for the south addition until
an updated traffic study has been conducted. Approval of the project is recommended, as in the previous planning
report, with the additional recommendations for a Hold on the south addition.
The revised proposal constitutes good planning and it is therefore recommended that the application and draft
zoning by-law be approved.
Contact:
Wendy Johncox, MCIP, RPP Tel: (416) 394-2868 Fax: (416) 394-2782
Senior Planner
Gerry Rogalski, Tel: (416) 395-7104 Fax: (416) 395-7155
Planner
_________
Schedule "A" - Official Plan Map
Schedule "B" - Zoning Map
Schedule "C" - Revised Site Plan
Schedule "D1" - Uphill Parking Garage Elevations
Schedule "D2" - Elevations (East Side - Uphill Ave.)
Schedule "D3" - Elevations (South Side - Church St.)
Schedule "D4" - North & West Elevations (Longview)
Schedule "D5" - Elevations (West Parking Garage)
Schedule "E"
Authority: Planning and Transportation Committee Report No.__ Clause No.__ , as adopted by Council on
____________.
Enacted by Council:
CITY OF TORONTO
Bill No.
BY-LAW No.
To amend Zoning By-law 7625 of the former City of North York and Zoning By-law 1-83 of the former City of
York for 200 Church Street
WHEREAS authority is given to Council by Section 34 of the Planning Act, R.S.O. 1990, c.P. 13, as amended, to
pass this By-law; and whereas Council of the City of Toronto has provided adequate information to the public and
has held at least one public meeting in accordance with the Planning Act;
The Council of the City of Toronto HEREBY ENACTS as follows:
1. Schedules "B" and "C" of By-law 7625 are amended in accordance with Schedule 1 of this by-law.
2. Section 6 of Zoning By-law 1-83 is amended by adding thereto the following as new Subsection (64):
"(64) By changing the area shown on District Map 3 comprising the lands described as Block 'A' in Schedule '1'
hereto from an R1 to R1 16(249)H, and by changing District Map 3 accordingly."
3. Section 64.44 of By-law 7625 is amended by adding the following subsection:
64.44(3) HOS(3)
DEFINITIONS
(a) For the purpose of this exception, "Gross Floor Area" shall mean the total area of all floors, measured between
the outside of the exterior walls of the building at the level of each floor, but excluding:
(i) any part of the building used exclusively for the accommodation of mechanical equipment necessary to
physically operate the building such as heating, ventilation, air conditioning, electrical, plumbing, fire protection
and elevator equipment;
(ii) car parking areas within the building including that contained in an above-grade parking structure.
PERMITTED USES
(b) In addition to the uses permitted in the HOS zone, the following use is also permitted:
Single family dwelling
USE QUALIFICATIONS
(c) Accessory Buildings accessory to the single family dwellings shall be subject to the requirements for accessory
buildings in R zones.
(d) A day nursery is not required to be associated with the hospital.
EXCEPTION REGULATIONS
(e) Gross Floor Area
The maximum gross floor area shall be 85% of the lot area.
(f) Building Envelopes
(i) Single family dwellings may only be permitted within the Building Envelopes B as shown on Schedule HOS(3).
(ii) Parking structures may only be located within Building Envelopes C and D as shown on Schedule HOS(3).
(iii) All other uses permitted may only be located in Building Envelopes A and B.
(iv) Parking kiosks may be located anywhere on the site except in any landscaped area required in clause (i).
(g) Yard Setbacks
(i) The yard setbacks shall be as shown on Schedule HOS(3)
(h) Building Height
(i) The height of any portion of the buildings shall not exceed the heights shown on Schedule HOS(3).
(ii) Notwithstanding (i), the height of any portion of the building or structure shall not exceed the horizontal
distance between that portion and an abutting R4 zone.
(iii) Notwithstanding (i) and (ii), the height of the parking structures shall not exceed 135.5 metres above sea level.
(i) Landscaping
(i) A minimum distance of 3.0 metres from all lots lines that abut a street shall be landscaped except for drop off
areas and driveways entering and exiting from the lot directly onto the street.
(ii) A minimum distance of 13.0 metres from the most westerly lot line defined as N17o54'10''W shall be landscaped.
(iii) Despite (i) above, buildings located within Building Envelopes B may encroach into the required landscaped
areas.
(j) Parking
A minimum of 1 space per 47 mē of gross floor area of the hospital shall be provided on site.
4. Section 64.13 of By-law 7625 is amended by adding the following subsection:
64.13(54) R4(54)
PERMITTED USES
(a) In addition to the uses permitted in the R4 zone, a school of nursing, a nurses' residence and a student residence
shall be permitted.
EXCEPTION REGULATIONS
(b) The school of nursing and nurses' residence buildings shall be set back a minimum distance of 18.5 metres from
the westerly lot line.
(c) The school of nursing and nurses' residence shall be set back a minimum distance of 12.1 metres from the
northerly lot line.
(d) The maximum height of the nurses residence shall be 10 storeys.
(e) The maximum height of the school of nursing shall be 2 storeys.
5. Section 16 of By-law 1-83 is amended by deleting Subsection (249) and inserting in its place the following as
Subsection (249):
16(249) LANDS - EAST OF PINE STREET, NORTH OF CHURCH STREET AND WEST OF UPHILL AVENUE
Notwithstanding the provisions of :
Subsection 3.1.4 of Section 3;
Subsection 3.4.11 of Section 3; and
Section 7.
The lands municipally known as 180, 186 and 200 Church Street, which lands are more particularly shown in
Schedule 1 hereto (and hereinafter referred to as the "lands") shall only be used for the erection and use of the
following permitted uses:
Accessory use, buildings or structures;
Clinic;
Day nursery;
Detached dwelling house;
Hospital;
Health science research laboratory;
Medical office;
Nursing home;
Parking lot; and
Retail store,
subject to the following conditions:
(a) Use Qualifications
(i) A clinic, health science research laboratory, nursing home, medical office, and retail store are permitted, if
(A) they are located on the same lands as the hospital.
(B) they are in association with a hospital on the same lands.
(ii) A retail store is permitted if:
(A) it is located in a building used primarily as a hospital
(B) the maximum retail store area is limited to 10% of the ground level of the hospital building at its main public
entrance.
(iii) Accessory Buildings accessory to the detached dwelling house shall be subject to the requirements for accessory
buildings in set out in Section 7.
(iv) The maximum height of buildings accessory to residential and non-residential uses, except for parking
structures, shall be 3.1 metres for flat-roof buildings and 3.7 metres for pitched-roof buildings.
Building Envelopes
(i) Detached dwelling houses may only be permitted within the Building Envelopes B as shown on Schedule HOS(3),
attached hereto.
(ii) Parking structures may only be located within Building Envelopes C and D as shown on Schedule HOS(3).
(iii) All other uses permitted may only be located in Building Envelopes A and B.
(iv) Parking kiosks may be located anywhere on the site except in any landscaped area required in clause (d).
(v) Notwithstanding (i), the height of the parking structures shall not exceed 135.5 metres above sea level.
EXCEPTION REGULATIONS
(a) Gross Floor Area
The maximum gross floor area shall be 85% of the lands.
(b) Yard Setbacks
The yard setbacks shall be as shown on Schedule HOS(3).
(c) Building Height
(i) The height of any portion of the buildings shall not exceed the heights shown on Schedule HOS(3),attached
hereto.
(ii) Detached dwelling houses may only be permitted within the Building Envelopes B as shown on Schedule
HOS(3), attached hereto.
(iii) Parking structures may only be located within Building Envelopes C and D as shown on Schedule HOS(3).
(iv) All other uses permitted may only be located in Building Envelopes A and B.
(d) Landscaping
(i) A minimum distance of 3.0 metres from all lots lines that abut a street shall be landscaped except for driveways
and drop off areas entering and exiting from the lands directly onto the street.
(ii) A minimum distance of 13.0 metres from the most westerly lot line defined as N17o54'10''W shall be landscaped.
(iii) Despite (i) above, buildings located within Building Envelopes B may encroach into the required landscaped
areas.
(e) Parking
A minimum of 1 space per 47 mē of gross floor area of the permitted uses shall be provided on site.
(f) Holding Provision
(i) Until the removal of the holding symbol "H", any portion of the lands designated R1-16(249)-H may be used
only for the purposes existing at the time of passing of the by-law including a two storey plus basement wing of the
hospital and open space.
(ii) The holding symbol "H" on the lands designated as R1-16(249)-H shall only be removed when the following
conditions have been met:
a) an updated traffic impact study be prepared and submitted to the satisfaction of the Commissioner of Works and
Emergency Services that demonstrates that sufficient capacity is available to accommodate the additional traffic
generated by the Phase 2 (south) expansion, and that the development would not result in an unacceptable level of
arterial road service; and
b) a building permit has been issued for the west parking deck.
6. Section 64.44 of By-law 7625 is amended by adding Schedule HOS(3) attached to this by-law.
7. By-laws 28538, 25569, 21789, 11620 which amended North York By-law 7625 are hereby repealed.
ENACTED AND PASSED this day of , A.D. 1999
________________ __________________
Mayor City Clerk
Schedule "1" to By-Law
Schedule "HOS(3)" to By-Law
Appendix "D"
(Memorandum dated October 6, 1999, from the
Director, Transportation Services - District 3,
North York Civic Centre, addressed to the
Director, Community Planning - North District)
Further to my memorandum of November 16, 1998, I am providing the following comments on the zoning
application for this site as per the revised site plan and traffic studies that have been submitted.
The development site is located on the north side of Church Street, west of Jane Street and south of Highway 401.
The applicant is proposing to build a 2,415 m2 addition to the existing hospital, for a total of approximately 35,225
m2 of hospital uses with 205 beds. There is also a proposal for a further south addition of 3,409 m2 in the future,
which is not anticipated to be built in the next five years but is part of the current rezoning application. The site
straddles the District 1/District 3 border, and any operational issues will continue to be reviewed by the separate
districts.
Traffic Assessment
BA Consulting Group Limited prepared an updated traffic impact study (June 1999) and a supplement for the
south addition (August 1999) that compared the traffic generated by the proposed development with the existing
uses on-site and the impact on the area road network. Trip generation rate surveys conducted on site were used in
determining the vehicle trips generated by the proposed uses and are shown in the following table.
|
AM Peak Hour |
PM Peak Hour |
|
In |
Out |
Total |
In |
Out |
Total |
Total Existing
Trips |
280 |
105 |
385 |
110 |
270 |
389 |
New Proposed
Trips |
135 |
75 |
210 |
45 |
150 |
195 |
Total Proposed
Trips |
415 |
180 |
595 |
155 |
420 |
575 |
New Future
Trips |
42 |
18 |
60 |
16 |
44 |
60 |
Total Future
Trips with
South Addition |
457 |
198 |
655 |
171 |
464 |
635 |
Overall, it is anticipated that there would be a net increase in the number of two-way vehicular trips generated by
approximately 210 trips in the a.m. peak hour and 195 trips in the p.m. peak hour from what is currently generated
on site. The future South Addition would add a further 60 two-way trips per peak hour.
Roadway capacity analyses of the surrounding streets indicate that the additional site generated traffic from the
proposed development can be accommodated on the adjacent road network. The need for traffic calming measures
was identified through the public meetings.
Access
(1) Full move access on Longview Drive to serve the North staff parking lot.
(2) Full-moves access on Longview Drive to the loading area.
(3) Full-move secondary access for emergency vehicles only on Uphill Avenue.
(4) Full-moves access to the parking structure, emergency area from the driveway that forms the west leg of the
intersection of Uphill and Woodward Avenues.
(5) Inbound only access to the parking and fire route access from Church Street.
(6) Full-moves service access on Church Street.
(7) Full-moves access to the parking from the driveway that forms the east leg of the intersection of Pine Street and
Woodward Avenue.
Parking
In accordance with By-law #7625, 268 spaces are required while 816 spaces are proposed (including 19 disabled spaces),
including the construction of a new parking deck on the east side of the site. At the proposed amount of parking, 20
disabled spaces are required.
The future south addition would include an increase in parking of 114 spaces for a total of 930 spaces through the
construction of a new parking deck on the west side of the site. 20 disabled spaces would still be required.
The following table summarizes the parking available for the proposal and the future south addition, including off-site
parking at the Prayer Palace and the Bond International College and on-street parking:
Parking Type/Location |
Existing Supply |
Proposed Supply |
Future Supply with
South Addition |
On-Site |
528 |
816 |
931 |
Off-Site |
40 |
40 |
40 |
On-Street |
40 |
35 |
35 |
Total |
608 |
891 |
1006 |
Proposed parking is based on actual demand rather than existing by-law standards. The current proposal would translate
into an approximate parking rate of one space per 47 m2 of gross floor area for the entire site (or one space per 4.9 m2 of
bedroom area or three spaces per bedroom).
Loading
In accordance with By-law #7625, three loading spaces are required and are proposed for the current expansion and the
future south addition.
Site Plan Review
Having reviewed the site plan (Dwg. No. A100 by Zeidler Roberts Partnership - Architects dated June 8, 1998), the
following issues have been noted that need to be addressed by the applicant:
(1) The designated separation between the eastbound left-turn lane and the through/right-turn lane at the intersection of
Jane and Church Streets must be increased to 60 metres plus taper through appropriate pavement markings. This may
require changes to parking by-laws on Church Street.
(2) Upgraded pavement markings and signage, including improved pedestrian crossing treatments, must be provided at the
intersections of Uphill Avenue with Pelmo Crescent, Woodward Avenue, and Church Street.
(3) An eastbound left turn lane is required for the inbound-only Church Street parking access through pavement markings
to improve traffic operations. This will require the removal of parking spaces and meters on the north side of Church Street
and changes to parking by-laws.
(4) All parking spaces and aisles must conform to the requirements of Zoning By-law 7625, including widths of 2.7 metres.
(5) In accordance with Zoning By-law 7625, a minimum of three loading spaces are required with minimum dimensions of
11 metres long, 3.6 metres wide and have a vertical clearance of 4.2 metres.
(6) In accordance with By-law 31770, 20 disabled spaces must be provided.
(7) The secondary emergency access on Uphill Avenue must be gated or chained.
(8) All other existing access must be closed and restored to City of Toronto standards.
(9) All of the above conditions must be met at no cost to the City of Toronto.
Traffic Calming
During the public consultation process, various traffic calming measures were illustrated that would change driver
behaviour and result in an overall reduction of speed, which appears to be a principal concern of the area community.
Any traffic calming measures required are to be reviewed in consultation with the Councillors and Traffic Operations staff
(in both District 1 and District 3), in co-ordination with the local community and the hospital, with the occupation of the
first and subsequent phases of the expansion. These measures are to be implemented at the developer's expense.
Road Closures
The expansion on the north side of the hospital building requires a portion of Longview Drive to be closed and sold to the
Hospital. In addition a portion of Woodward Avenue east of Pine Street and a portion of Woodward Avenue west of Uphill
Avenue (which are being used solely by the Hospital for a parking area and access) are to be closed.
A separate report on the road closures is being prepared as part of this application in accordance with Council policy.
South Addition
The transportation analysis provides a general overview of the anticipated traffic and parking demand for the proposed
south addition. Given that the south addition is not expected to be built for a few years, it is recommended that an updated
traffic impact and parking study be required at the time the applicant proceeds with the south addition and the west parking
deck to verify the assumptions contained in the traffic report dated August 1999.
Conclusions
Given the above, I have no objections to the proposal from a transportation perspective subject to the applicant complying
with the above noted requirements through the site plan control process.
_________
The Planning and Transportation Committee also submits the following report (December 18, 1998) from the
Commissioner of Urban Planning and Development Services:
Purpose:
This is a final recommendation report on the rezoning for the expansion of the Humber River Regional Hospital at 200
Church Street to permit additions to the existing hospital on the north and south sides. A two storey parking garage on the
southeast corner of the site has also been proposed. This site straddles the boundary of the former municipalities of York
and North York and therefore all planning reports have been directed to the Urban Environment and Development
Committee for consideration and in order to hold the statutory public meeting.
Recommendations:
It is recommended that the rezoning application for 200 Church Street be approved subject to the following conditions:
(1) the zoning be amended to a hospital zone in accordance with an implementing zoning by-law which generally complies
with the draft by-law attached as Schedule "F" and the by-law be perfected prior to enactment;
(2) prior to the enactment of the zoning by-law, the following conditions shall be met:
(i) the southern 15.27 metres of Longview Drive be closed and stopped up and conveyed to those persons entitled by law to
such conveyance; and
(ii) the closed portions of Woodward Drive on the east and west sides of the hospital site be conveyed to the hospital;
(3) the design principles outlined in Schedule "A" apply to the consideration of any site plan approval application;
(4) prior to site plan approval, a community meeting be held to discuss the parking and drop off areas for the proposed
daycare at 180 Church Street and the daycare be included as a permanent use in the zoning by-law;
(5) the conditions of the Works and Emergency Services Department as set out in Schedules "G", "H1" and "I" be met;
(6) the conditions of the Public Health as set out in Schedule "K1" and "K2" be met.; and
(7) the conditions of the utilities as set out in Schedules "M1", "M2", and "M3" be met.
Background:
1.0 Site and Surrounding Area
The site straddles the former municipalities of York and North York in the southeast quadrant of Jane Street and 401 and is
predominantly surrounded by detached homes. The hospital owns 10 of the 14 houses around the site (See Schedules "A"
and "B").
The hospital site (See Schedule "C" - Site Plan) is characterized by the existing two to seven storey hospital building in the
middle of the site with its main access on Uphill Avenue. Parking is located on the east, west and north portions of the site
with the service areas are generally located on the west side of the hospital.
2.0 Proposal
The Humber River Regional Hospital is proposing to expand the Church Street facility to implement the Provincial Health
Services Restructuring Commission (HSRC) directives. The original proposal submitted was for the immediate expansion
of both the mental health wing on the south side of the building (Church Street) involving a two level structure plus a
basement level of approximately 2,415 m2 (26,000 sq.ft.) and the expansion of the emergency wing on the north side of the
building (Pelmo Crescent) involving a one level plus basement level addition of approximately 2,415 m2 (26,000 sq.ft.).
The north addition also requires the closing and acquisition of Longview Drive. A new electrical transformer station is also
proposed on the west side of the existing building with an area of approximately 330 mē (3,570 sq.ft.).
Since the time of the original proposal, the hospital has determined that the mental health program can be moved to the
Finch site of the Humber River Regional Hospital and therefore the south expansion of the Church Street site is not
immediately necessary which responses to community consultation where a common suggestion arose to move any
programs possible to the Finch site of the hospital where there is more room for expansion.
In addition, the applicant is proposing to construct a two level parking structure, located partially underground, on the
southeast corner of the site at the junction of Church Street and Uphill Avenue. The parking spaces will increase by 150
spaces from 526 spaces to a total of 676 spaces. The total increase in the gross floor area including the south expansion
would be 5,160 m2 (55,550 ft.) increasing the existing floor space index of 0.71 to 0.82. With the south expansion
excluded, the increase in gross floor area is 2,745 mē (29,570 sq.ft.) which increases the floor space index to 0.77.
Table 2.1- Site Statistics
|
North Addition +
Electrical |
South Addition |
Existing Hospital |
Total |
Site Area |
|
|
|
45,190 mē |
Gross Floor Area |
2,745mē |
2,415mē |
32,236 mē |
37,396 mē |
Floor Space Index |
0.06 |
0.05 |
0.71 |
0.82 |
Parking Provided |
150 spaces |
526 spaces |
676 spaces |
Parking Required |
1 space/28 mē of bedroom area |
144 spaces |
3.0 Planning Controls:
The site straddles two former municipalities, therefore two Official Plan and Zoning By-law designations apply to the site.
3.1 Official Plan Designations:
North York District: General Institutional which permits institutional uses including hospitals and uses ancillary and
complementary to hospitals
York District: Institutional which permits the hospital use
The proposal complies with the Official Plans for both former municipalities.
3.2. Zoning
North York District: R4 (One-Family Detached Dwellings Fourth Density Zone) subject to site specific by-laws 11620,
21789, 25569, and 28638 which permit the existing hospital use and built form.
York District: R1 (Residential Zone 1) subject to site specific by-law Section 16(249) which permits the hospital use and
built form.
The existing site specific by-laws in both municipalities do not contemplate any extension of boundary lines to include the
house lots now owned by the hospital, or the expansion of the hospital uses onto those lots. Expansion of the hospital
footprint and the parking areas is also not contemplated in the existing site specific by-laws.
4.0 Community Consultation
Prior to the rezoning application, submitted on February 24, 1998, the hospital held several meetings with the community
to inform the local residents of the future plans for the hospital and get their feedback. The Urban Planning and
Development Services Department held an Information Meeting at Pelmo Park School on May 21, 1998. Two working
groups were formed to address the issues identified by planning staff and the community. The issues are outlined below.
As well, City Council, at its meeting of June 3, 4 and 5, 1998, recommended that an Advisory Committee on restructuring
matters be created with representation from local councillors and the community.
4.1 Working Groups
The Working Groups are comprised of local residents living, for the most part, in the immediate vicinity of the hospital.
Representatives from the Pelmo Park and Weston Ratepayers Associations attended as representatives of the larger
communities. Planning staff also attended the various meetings.
The Working Groups identified and discussed the issues over a span of nine meetings. The meetings were divided into two
main topics: Design and Massing, and Parking and Traffic.
The following issues arose at the Design and Massing Group meetings:
- location and built form of the parking garage
- location of front entrance for the hospital
- substantial landscaping required over the entire site
- keep existing front yard (as much as possible) on Church Street
- reduction of berm by the west parking area
- built form and impact of the north addition on the adjoining residential homes
- facade improvements
The Parking and Traffic Group meetings focused on the following issues:
- traffic speed and infiltration to neighbourhood
- circulation of traffic and pedestrians around and within the hospital grounds
- parking adequacy, location and potential reductions of staff parking
The issues from both groups are discussed in the Planning Issues and Urban Design sections of the report.
4.2 Advisory Committee on Restructuring Matters
In accordance with the direction given at the May 19, 1998 Urban Environment and Development Committee meeting, an
advisory group was established composed of the six area Councillors, community representative and hospital and city staff.
This group was given the direction to assess the impact of planning decisions on the respective communities, to discuss
hospital program planning and the Health Services Restructuring Commission decisions. The group has had several
meetings and has recommended that the hospital continue to work to shift some the substance abuse services (part of
mental health) from the Church site back to the Finch site.
While the programming within the hospital is beyond the scope of the rezoning application, the program requirements of
the hospital have directed the location and extent of the proposed hospital expansion. The north expansion responds to the
need for the expansion of both the Emergency Room and the diagnostic imaging department on the main floor. The
southern expansion reflected the need to upgrade the mental health department which subsequently will be moved to the
Finch site in response to the Advisory Group's recommendation.
4.3 Information Meetings
Three Information Meetings have been held for this project. One was held on May 21, 1998. Approximately 30 people
attended this meeting. Two others were held November 3 and 4, 1998, one each in the former municipalities of York and
North York. Similar issues were raised as in the Working Groups such as traffic, facades, parking, landscaping, and impact
on surrounding residential area. The comments received at these meeting are attached as Schedule "N".
5.0 Other Department Comments
The comments received from the various departments and agencies circulated are summarized in Schedule "G" and are also
attached as Schedules "H" through "M".
Discussion:
6.0 Planning Issues:
While the proposed additions to the hospital are relatively small, this hospital is located in the midst of a single family
residential neighbourhood and therefore careful consideration is needed as to how the hospital can better fit within the
residential community. In order to aid this evaluation, principles of development were established by the planning staff and
the Working Committees. The principles are as follows:
(a) create/maintain residential character;
(b) structure must not be visually intrusive to the surrounding neighbourhood;
(c) the edge of the hospital property must be aesthetically appealing and well maintained;
(d) traffic on surrounding roads must flow safely and efficiently;
(e) reduce traffic and parking congestion throughout the neighbourhood;
(f) internal vehicle circulation must be maximized to minimize external vehicle circulation;
(g) emergency/visitor parking and entrance must be easily found and accessed; and
(h) efficient and effective emergency access must be maintained .
As a result of recommendations from Working Group, the applicant has responded with changes to the design and internal
traffic circulation. The following sections discuss the issues and how the principles were addressed.
6.1 Built Form and Urban Design
There are three distinct key components of the proposal: the north addition, the parking garage, and the future south
addition. Each of these components is outlined below and reflect the Urban Design Guidelines in Appendix "A".
6.1.1 North Addition
The north addition (See Schedules "C" and "D2" - Site Plan and Elevations) is proposed to house an expanded emergency
room function. Due to the immediacy of the functions occupying this portion of the hospital, the uses must be at grade and
easily accessible. The emergency visits to the hospital are projected to increase from approximately 40,000 per year to
70,000 per year. The expansion is required to meet this increased load.
The addition requires the removal of an existing house at 15 Longview Drive which is now in hospital ownership. The
addition is proposed to be 14.25 metres in depth and have a 68 metre width with a height of 2 storeys (6.5 metres above
grade) . The first storey is below the established grade which reduces the visual impact of the addition.
The residents' concerns were that the north addition was too close to the house at 63 Pelmo Crescent which remains in
private ownership. The addition is proposed to have a setback of 6.5 metres and a maximum height of 6.5 metres measured
from the northeast corner of the proposed addition which is the closest point to the existing house at 63 Pelmo Crescent.
Shadow diagrams were done which show there is not a significant shadow impact on the house. The proposed addition
maintains a similar setback from the residential property line as specified in the existing zoning by-law (20 feet - 6.1
metres).
The location and size of the north addition is appropriate provided a high level of urban design and landscaping are
achieved as part of the expansion.
6.1.2 Future South Addition
The south addition was proposed to contain an expansion of the existing mental health wing that is currently located at the
south edge of the hospital. However, since the time of the original proposal, the hospital has determined that the these
facilities can be incorporated at the Finch site. The south addition proposal would still be appropriate if required in the
future using the design principles of maintaining the residential character of the area and not being visually intrusive.
The south addition would extend to align with the adjacent houses on Church Street. The height of 11 metres meets the
bylaw requirement in the former City of York (See Schedule "C" and "D1").
The original application had large institutional windows and strong horizontal lines. Revisions have been made to the
facade design which include a sloped roof and vertical partitions which are similar to the residential lot widths. This would
render the facade more in keeping with the residential streetscape.
6.1.3 Parking
The following table 6.1.3 summarizes the existing and proposed parking on site.
Table 6.1.3: Parking
|
Existing |
Proposed |
North Visitor Lot |
30 Spaces (Gravel Lot)
6 Spaces (Metered & Paved) |
32 Spaces (Metered) |
South Visitor Lot |
102 Spaces (Surface) |
214 Spaces (Parking Structure) |
ER (Doctor) |
6 Spaces |
8 Spaces
3 Ambulance Spaces |
North Staff Lot |
163 Spaces |
148 Spaces |
West Staff Lot |
219 Spaces |
271 Spaces |
Total |
526 Spaces |
676 Spaces |
The hospital retained the BA Group to undertake a traffic impact and parking study. The City's transportation department
has reviewed the BA Group's traffic and parking study and has concurred with its conclusions that there will not be parking
congestion throughout the neighbourhood as a result of the restructuring as parking demand is met on-site.
Due to the increased volumes of visitors to the Humber River Regional Hospital (Church Street location) more parking is
required on-site. No reliance upon on-street parking is made to accommodate future staff and visitor parking demand
increases. The majority of hospital traffic comes along Church Street from Jane Street. The location of the visitor parking
structure at Uphill and Church presents an opportunity to get visitor traffic off the local streets at first available point. The
existing visitor lot is behind four existing houses owned by the hospital with its access from Uphill Avenue.
As there is limited possibility of providing more surface parking on site, the hospital is proposing to construct a parking
garage on the existing visitor parking lot (See Schedule "C"). This will involve the demolition of the four houses fronting
Church Street. The two level parking structure will have 214 parking spaces which will be constructed primarily at and
below grade.
The parking garage will extend north along Uphill Avenue and gradually the P1 parking level will become buried as the
grade changes. This will allow the main vehicular entrance to be maintained at grade as it extends over P1. At the north
edge of the parking garage, adjacent to 52 Uphill Avenue, the parking garage will look like a surface parking area with a
wall at its perimeter. (See Schedule "D3" - Parking Cross Section)
The existing access on Uphill Avenue to the visitor parking area will be relocated to Church Street. This will be a one-way
in-only with the exit from the garage located at the upper P2 level on the internal road. An alternate access to the parking
garage is also provided from the main access driveway opposite Woodward Avenue.
A number of issues emerged from the Working Groups with respect to the location and impact of the parking garage. The
following principles were taken into account in locating and designing this structure:
(a) create/maintain residential character
(b) must not be visually intrusive to the surrounding neighbourhood
(c) the edge of the hospital property must be aesthetically appealing and well maintained
(d) reduce traffic and parking congestion throughout the neighbourhood
(e) visitor parking entrance must be easily found and accessed
Planning staff is of the opinion that an improved design which incorporates the urban design principles set out in Appendix
"A" at the east location is a better solution than moving the parking garage and compromising the principles of access and
external circulation. The improved design also addresses the issue about the facade treatment of the garage.
6.2 Traffic
The traffic volumes on the streets surrounding the hospital will increase as a result of the hospital expansion. However, in
accordance with the transportation consultants findings as reviewed and accepted by city transportation staff, the level of
operation will still be within acceptable limits. Some modifications to signal timing and pavement markings have been
proposed to improve the traffic situation. Provision for these modification will be secured at the site plan stage. Church
Street, Uphill Avenue and Pelmo Avenue are designated as collector roads in the Official Plan which generally accept
higher volumes of traffic than local streets.
The hospital traffic is one component of the overall traffic makeup of the area. The largest volume of hospital traffic is
along Church Street between Jane Street and Uphill Avenue where hospital traffic represents about 30% of the traffic.
Other traffic is generated by the residents of the area and transient traffic cutting through the neighbourhood.
6.2.1 Traffic Calming
Concern has been raised about traffic volume and speed of traffic as it affects quality of life in the neighbourhood. Issues
such as pedestrian safety, noise, difficulty in backing out of driveways, congestion and short cutting traffic have been
discussed in the Working Group meetings. These issues are longstanding concerns that should be addressed regardless of
whether or not the hospital expands. Several presentations to the Working Groups and the Advisory Group have been made
to illustrate the possibilities of traffic calming measures that can help to slow down traffic and improve pedestrian safety. If
viable traffic calming measures are determined, then the appropriate reports will be submitted to Council for consideration.
Traffic calming can be take many forms such as raised pedestrian crossings, speed humps and bumps, medians, narrowing
the pavement, traffic circles, and raised intersections for example. Traffic calming is intended to modify the geometry of a
street to passively regulate speed, give priority to pedestrians and improve the look and feel of the street.
6.2.2 Transportation Management Demand
There are limited opportunities to try and reduce the demand for parking and the number of vehicle trips to the hospital
site. This can be achieved by promoting the increase in transit usage, increase the average auto occupancy, increase other
modes such as walking and bicycling, and spreading out peak hour demands to off peak hours. It has been indicated by the
traffic consultant that there is greater potential for an effective strategy to be implemented for hospital staff rather than
visitors. In this regard three measures have been recommended by the traffic consultant:
- adjust staff parking pricing;
- promote ridesharing and car pooling; and
- promote non-auto travel, i.e. transit and bicycle.
While the overall impact of such measures may have modest impacts on the overall demand, the hospital is encouraged to
pursue the implementation of an appropriate Transportation Demand Strategy.
6.3 Environment
The hospital was requested by staff to submit a Phase I Environmental Site Assessment to determine if there was any soil
contamination on site and if the site was suitable for the intended use. When the hospital submitted their rezoning
application in February of this year, the hospital was using its incineration facilities to dispose of some of the hospital
waste. As a result of concern from the residents surrounding the site, the hospital discontinued the use of the incinerator
and now disposes of its garbage using compactors and shipping it to the appropriate disposal facilities.
The Phase I Environmental Site Assessment determined that an underground oil storage tank that was removed in 1992
was a potential source for soil contamination. As a result, a Phase II Environmental Site Assessment was carried out to
determine whether or not soil or ground water on the property had been contaminated. The conclusion of the environmental
consultants further testing and measures was that all of the soil and ground water samples comply with the current Ministry
of the Environment criteria for residential/parkland and that the subject property is suitable from an environmental
perspective for the proposed use. Prior to site plan approval, a peer review and a record of site condition will be required.
6.4 Daycare Use
City Council adopted a Temporary Zoning By-law in July 1998 to allow the hospital owned house at 180 Church Street
(See Schedule "C" - Site Plan) to be used for a daycare centre for a one year period. The by-law was appealed to the
Ontario Municipal Board by local residents in October 1998. Council adopted a resolution in October 1998 to request the
Board to extend the period for which the by-law is to be in effect to three years. Following the hearing on December 10 and
11, 1998, the Ontario Municipal Board verbally approved the temporary use by-law for the daycare use provided a further
community meeting is held to discuss the parking and drop-off areas for the daycare. Prior to site plan approval, a
community meeting will be held to discuss these issues.
The existing house is to be used for a daycare with approximately 50 children. Five parking spaces would be provided on
the lot with 6 staff spaces provided in the hospital staff parking lot, adjacent to the subject house.
The staff report (July 2, 1998) indicated that a daycare use at this location would be further evaluated in conjunction with
the hospital expansion and rezoning. The City's transportation staff concur with the conclusions and recommendation of
the traffic consultant who indicated the change in traffic volumes would be small. The change in traffic volumes beyond
the immediate site environs are considered to be small since this local community facility was previously established in a
nearby location along Pelmo Crescent.
The primary objective of relocating the daycare to this site was to keep a valuable community service within its existing
neighbourhood. The second objective was to provide an opportunity for workplace day-care as an added service to the
hospital and its staff. This type of use is normally incidental and accessory to the main hospital use and would provide a
benefit to both the hospital and the community. Therefore "day nursery" is included in the range of permitted uses set out in
the draft By-law amendment (Schedule "F") attached.
6.5 Hospital Zone
The existing site specific by-laws of both former municipalities allowed for the current built form and density on the site
but made no allowance for expansion. Even minor increases to the built form of the hospital required a rezoning. The
attached draft by-law allows for some flexibility for future minor building on the site, without the need to make another
rezoning application. All previous site specific by-laws will be rescinded and the attached by-law is proposed to replace
them.
A hospital zone has been drafted which could also be used in the new consolidated Toronto Zoning By-law when it is
created. The existing houses are recognized for residential or accessory hospital uses. Other uses include day nursery,
clinic, health science research laboratory, personal service shop, medical office, retail store and sanatorium. There are
qualifications for some of these other uses.
Four properties on the block have not been included in the hospital zone, as they are not in hospital ownership. As a result,
the adjacent hospital lands have a limited building envelope in order to protect these existing private residential uses.
Should the hospital acquire these properties in future, and wish to expand further than the proposed building envelope and
heights, a new application for rezoning would be required to allow an evaluation of the impact of such a proposal with a
full community consultation process.
The numbers shown on Schedule HOS(3) of the draft by-law indicate the same heights as the subject proposal. Any new
development on the site is required to stay within these height limits. The height of the existing hospital owned houses will
remain at 2 storeys. The draft by-law allows for flexibility within the prescribed enveloped as identified by Schedule "F".
The former City of York by-laws calculate the parking requirement according to the number of hospital beds. Beds are not
the crucial indicators any longer because of the major changes to health care delivery that have been made in the last few
years. The more pertinent indicator is the relationship of parking spaces to gross floor area. As a result, the standard has
been changed to one parking space for each 7.7 m2 of gross floor area which reflects the real parking demand.
The Temporary Use By-law will not be required once the amending zoning by-law is passed for the entire hospital site, but
does not need to be repealed as it will automatically cease to apply to the lands once the time period has expired.
Conclusions:
The hospital is requesting an additional 12.5 percent increase to the existing gross floor area in two phases. Consultation
with the community through information meetings and working groups has been extensive and the proposed additions have
adhered to the principles adopted by the Working Groups.
The traffic and parking study has indicated that, with minor adjustments, the existing streets can accommodate the
increased traffic due to the restructuring and expansion of the hospital. It is important to note that the increase in traffic is
due primarily to the hospital program restructuring rather than the 12.5 percent increase in gross floor area. Even without
the expansion, the traffic volumes in the area would have risen.
The new HOS(3) zoning permits the proposed development and allows for a margin of flexibility by providing an
additional 1.2 percent density over the proposed gross floor area. It also protects the surrounding residential area by
defining a building envelope, maximum building heights and a landscape buffer around the entire perimeter of the site.
Accessory uses are also confirmed as appropriate in the main hospital building and existing house form buildings.
The proposal constitutes good planning for the site and, as such it is recommended that the application and draft zoning
by-law be approved.
Contacts:
Wendy Johncox
Senior Planner
York Civic Centre
Phone: 394-2868
Fax: 394-2782
Karen Whitney
Planner
North York Civic Centre
Phone: 395-7109
Fax 395-7155
_________
Appendix "A" - Urban Design:
It is important that the following principles also be addressed in the site plan approval:
(a) create/maintain residential character
(b) structure must not be visually intrusive to the surrounding neighbourhood
(c) the edge of the hospital property must be aesthetically appealing and well maintained
(d) traffic on internal driveways must flow safely and efficiently
(e) internal vehicle circulation must be maximized and external vehicle circulation minimized
(f) emergency/visitor parking and entrance must be easily found and accessed
(g) efficient and effective emergency access must be maintained
North Addition:
The northern expansion's proximity to the single family homes fronting Pelmo Crescent requires particular attention to the
urban design and landscaping.
Landscaping and fencing between the hospital property and the house at 63 Pelmo Crescent would lessen the impact of the
proposed addition. The proposed height, setback and landscaping address the principle of the structure not being visually
intrusive to the surrounding neighbourhood.
The proposed north facade was also redesigned to incorporate smaller windows and more vertical details to mimic the
scale of the surrounding residential area. The second storey windows have been proposed to be high windows which
preserves the privacy of the abutting residential property. These changes address the principle of creating a more residential
character that recognizes the surrounding area.
Parking Garage:
The parking garage is proposed to be constructed on the current surface lot and to replace four houses on Church Street.
The Massing and Design Committee preferred the structure to have a residential scale and design elements to relate to the
houses. The design was revised to keep the height of the parking garage similar to the houses across the street and use brick
to mimic the material of houses.
An enhanced landscape buffer is proposed along the east and south perimeters of the parking garage on Uphill and Church
Avenues. The proposed landscaping reduces the visual impact of the parking structure.
The provision of 150 additional parking spaces on site attempts to reduce the visitor and staff parking congestion
throughout the neighbourhood. The largest increase in parking will be for visitors where currently there are 138 visitor
parking spaces, the proposal increases this to 246 spaces. The majority of these spaces will be in the proposed parking
structure. The west surface staff lot will have an additional 42 spaces. The transportation consultants have indicated that
the new total of 676 parking spaces on site exceeds the Zoning By-law parking requirements and meets the projected
on-site parking demand at the hospital. There is no reliance upon on-street parking to accommodate future staff and visitor
parking demand increases.
The possible relocation of the parking structure was discussed by the Working Committees. The hospital was asked to look
at the feasibility of relocating the garage to the west side of the hospital, with access from Pine Street. The conclusion from
the hospital's consultants was that while the cost to build the structure would be the same at either location, the west side
location would require extensive internal renovations to the hospital to relocate the main entrance. The alternative proposal
would also require traffic to move one block further into the community.
The traffic consultants comment that the west site would be less visible and accessible than the existing east location. This
west location contradicts the principles of minimizing external vehicle circulation, and ease of finding visitor parking.
Future South Addition:
The architect introduced vertical elements to the south addition, smaller scale windows and mansard roof details, all of
which reflect the residential character of the street. A substantial front lawn with similar setbacks as the existing front
lawns of adjacent houses needs to be maintained as green open space between Church Street and the new addition. The
addition meets the principle of being less visually obtrusive as a result of the changes to the facades and the retention of a
large open landscaped space.
_________
Appendix "B" - Department Comments
The following section summarizes significant comments received from the departments and agencies circulated.
(1) Works and Emergency Services Department
(a) Transportation Division
The applicant was required to submit a parking and traffic study in order to address the parking supply, traffic operations
on site and on the surrounding streets, neighbourhood traffic issues and the location of visitor parking facilities. The study
concluded that while the road network is experiencing high traffic volumes today, the additional traffic which will be
generated by the hospital expansion can be accommodated and that the proposed parking supply was adequate. Some
pavement marking and signal modifications were recommended. The Transportation Division concurs with the conclusions
and recommendations of this report.
A traffic calming process that had been initiated through the Working Groups will be continued in coordination with the
local community and area Councillors. If viable traffic calming measures are determined to be appropriate, they will be
reported on to Council.
A portion of Longview Drive is required for the north hospital expansion. The closure of Longview Drive south of Pelmo
Crescent is recommended in two phases which can be initiated simultaneously. The portion of Longview Drive needed for
the expansion needs to be closed prior or concurrently with enactment of the zoning by-law. This closure only involves the
hospital as the sole land owner of abutting property. The closure of the remainder of Longview Drive which involves both
the hospital and an abutting residential property can occur subsequent to the by-law enactment in order to provide more
time to resolve any issues. If the second phase of the road closure does not occur, a cul-de-sac will be required at the end of
the street to be paid for by the hospital. These comments are attached as Schedule "G".
(b) Fire
The Fire Division requires some additional information prior to the site plan approval, but does not have any objections to
the rezoning application. These comments are attached as Schedules "H1" and "H2".
(c) Technical Services
The York office (District 1) has indicated that storm water drainage must comply with the Sewer Use By-law which
requires an underground facility to control storm water run-off for the additional and existing paved areas. Curb and
sidewalk reconstruction must be paid for by the applicant as they relate to main entry and the parking structure. These
comments are attached as Schedule "I".
The North York office (District 3) has not submitted their written comments yet, but has verbally indicated they have no
objections to the proposal provided that: if a cul-de-sac is required, it will be at the expense of the hospital; a sidewalk is
required on the east side of Uphill Avenue at an estimated cost of $20,000; stormwater runoff be limited to
pre-envelopment conditions and some stormwater quality measures are required; an inspection manhole is required on the
portion of Longview Drive at the expense of the hospital. These written comments will be made available at the public
meeting.
The central Technical Services Division has indicated that adequate water and sewer facilities are available. These
comments are attached as Schedule "I2".
(d) Ambulance Services
The Ambulance Services submitted detailed comments on ER access as attached in Schedule "J". The proposed driveway
configuration did not provide any buffering of the private home at 52 Uphill Avenue and therefore planning staff asked the
traffic consultant and the Ambulance Service staff to look at some options for the ER drop off area. The site plan as shown
in Schedule "C" is an option which is acceptable to the Ambulance Division and buffering of 52 Uphill Avenue is
provided. The comments on the site plan are attached as Schedule "J2".
(2) Public Health
This department reviewed the Phase 1 Environmental Site Assessment in order to assess existing site conditions and
identify environmental concerns which may impact upon the future expansion of the building. The department requires
data on the quality of the ground water for the north east and west sides of the excavation from which underground storage
tanks were removed, and further documentation on the PCB's from the light ballasts. Provided that the preceding
conditions are met, the department has no objection to the application. These comments are attached as Schedules "K1"
and "K2". Subsequent to these comments, a Phase II Environmental Site Assessment has been submitted. A peer review
and record of site condition will be required prior to site plan approval.
(3) Parks and Recreation
There are no park land dedication requirements. These comments are attached as Schedule "L".
(4) Utilities
Hydro (York) has indicated that services for the site will need to comply with Hydro's Terms and Regulations of Supply.
The site is also serviced with a Customer-Owned Transformer Facility. Costs for its modifications shall be funded by the
proponent. Specifications of drawings to be submitted at Site Plan Approval stage are outlined. These comments are
attached as Schedule "M1".
Enbridge Consumers Gas has indicated that some gas services will need to be relocated prior to construction. These
comments are attached as Schedule "M2".
Bell Canada has no objections to the plan, however if conflicts with facilities arise the owner shall be responsible for
rearrangements or relocation. These comments are attached as Schedule "M3".
Schedule "A" - Official Plan Map
Schedule "B" - Zoning Map
Schedule "C" - Site Plan
Schedule "D1" - Elevations East & South
Schedule "D2" - Elevations West & North
Schedule "D3" - Parking Cross Section
Schedule "D4" - North & South Addition Cross Section
Schedule "E" - Landscape Plan
Schedule "F"
Authority: Planning and Transportation Committee Report No.__ Clause No.__ , as adopted by Council on ____________.
Enacted by Council:
CITY OF TORONTO
Bill No.
BY-LAW No.
To amend City of North York Zoning By-law 7625 and City of York Zoning By-law 1-83 for 200 Church Street
WHEREAS authority is given to Council by Section 34 of the Planning Act, R.S.O. 1990, c.P. 13, as amended, to pass this
By-law; and whereas Council of the City of Toronto has provided adequate information to the public and has held at least
one public meeting in accordance with the Planning Act;
The Council of the City of Toronto HEREBY ENACTS as follows:
1. Schedules "B" and "C" of By-law 7625 are amended in accordance with Schedule 1 of this by-law.
2. District Map 3 of By-law 1-83 is amended in accordance with Schedule 1 of this by-law.
3. Section 64.44 of By-law 7625 is amended by adding the following subsection:
64.44(3) HOS(3)
DEFINITIONS
(a) For the purpose of this exception, "Gross Floor Area" shall mean the total area of all floors, measured between the
outside of the exterior walls of the building at the level of each floor, but excluding:
(i) any part of the building used exclusively for the accommodation of mechanical equipment necessary to physically
operate the building such as heating, ventilation, air conditioning, electrical, plumbing, fire protection and elevator
equipment;
(ii) car parking areas within the building including that contained in an above-grade parking structure.
PERMITTED USES
(b) In addition to the uses permitted in the HOS zone, the following use is also permitted:
Single family dwelling
USE QUALIFICATIONS
(c) Accessory Buildings accessory to the single family dwellings shall be subject to the requirements for accessory
buildings in R zones.
(d) A day nursery is not required to be associated with the hospital.
EXCEPTION REGULATIONS
(e) Gross Floor Area
The maximum gross floor area shall be 85% of the lot area.
(f) Yard Setbacks
(i) The yard setbacks shall be as shown on Schedule HOS(3)
(ii) Single family dwellings may only be permitted within the Building Envelopes B as shown on Schedule HOS(3).
(iii) A parking structure may only be located within Building Envelope C as shown on Schedule HOS(3).
(iv) All other uses permitted may only be located in Building Envelopes A and B.
(v) Parking kiosks may be located anywhere on the site except in any landscaped area required in clause (h).
(g) Building Height
(i) The height of any portion of the buildings shall not exceed the heights shown on Schedule HOS(3).
(ii) Notwithstanding (i), the height of any portion of the building or structure shall not exceed the horizontal distance
between the building and structure, or portion thereof and an abutting R4 zone.
(iii) The parking structure height shall not exceed the height shown on Schedule HOS(3).
(h) Landscaping
(i) A minimum distance of 3.0 metres from all lots lines that abut a street shall be landscaped except for drop off areas and
driveways entering and exiting from the lot directly onto the street.
(ii) A minimum distance of 13.0 metres from the most westerly lot line defined as N17o54'10''W shall be landscaped.
(iii) Despite (i) above, buildings located within Building Envelopes B may encroach into the required landscaped areas.
(i) Parking
A minimum of 1 space per 7.7 mē of gross floor area of the hospital shall be provided on site.
4. Section 16(249) of By-law 1-83 is amended by deleting the subsection and replacing it with the following:
16(249) LANDS - EAST OF PINE STREET AND NORTH OF CHURCH STREET
DEFINITIONS
(a) For the purpose of this exception, "Gross Floor Area" shall mean the total area of all floors, measured between the
outside of the exterior walls of the building at the level of each floor, but excluding:
(i) any part of the building used exclusively for the accommodation of mechanical equipment necessary to physically
operate the building such as heating, ventilation, air conditioning, electrical, plumbing, fire protection and elevator
equipment;
(ii) car parking areas within the building including that contained in an above-grade parking structure.
(b) Permitted Uses
The following are the only uses permitted:
accessory use;
clinic;
day nursery;
detached dwelling house;
hospital;
health science research laboratory;
medical office;
nursing home;
parking lot;
retail store.
(c) Use Qualifications
(i) A clinic, health science research laboratory, nursing home, medical office, and retail store are permitted, if
(A) they are located on the same lot as the hospital.
(B) they are in association with a hospital on the same lot.
(ii) A retail store is permitted if
(A) it is located in a building used primarily as a hospital
(B) the aggregate area of a retail store located in all buildings is limited to 10% of the area of the storey directly accessible
from the ground level at the base of a building at its main public entrance.
(iii) Accessory Buildings accessory to the detached dwelling house shall be subject to the requirements for accessory
buildings in set out in Section 7.
EXCEPTION REGULATIONS
(d) Gross Floor Area
The maximum gross floor area shall be 85% of the lot area.
(e) Yard Setbacks
(i) The yard setbacks shall be as shown on Schedule HOS(3).
(ii) Single family dwellings may only be permitted within the Building Envelopes B as shown on Schedule HOS(3).
(iii) A parking structure may only be located within Building Envelope C as shown on Schedule HOS(3).
(iv) All other uses permitted may only be located in Building Envelopes A and B.
(v) Parking kiosks may be located anywhere on the site except in any landscaped area required in clause (g).
(f) Building Height
(i) The height of any portion of the buildings shall not exceed the heights shown on Schedule HOS(3).
(ii) The parking structure height shall not exceed the height shown on Schedule HOS(3).
(g) Landscaping
(i) A minimum distance of 3.0 metres from all lots lines that abut a street shall be landscaped except for driveways and
drop off areas entering and exiting from the lot directly onto the street.
(ii) A minimum distance of 13.0 metres from the most westerly lot line defined as N17o54'10''W shall be landscaped.
(iii) Despite (i) above, buildings located within Building Envelopes B may encroach into the required landscaped areas.
(i) Parking
A minimum of 1 space per 7.7 mē of gross floor area of the hospital shall be provided on site.
5. Section 64.13 of By-law 7625 is amended by adding the following subsection:
64.13(54) R4(54)
(a) Permitted Uses
In addition to the uses permitted in the R4 zone, a school of nursing and a nurses' residence shall be permitted.
(b) Exception Regulations
(i) The school of nursing and nurses' residence buildings shall be set back a minimum distance of 18.5 metres from the
westerly lot line.
(ii) The school of nursing and nurses' residence shall be set back a minimum distance of 12.1 metres from the northerly lot
line.
(iii) The maximum height of the nurses residence shall be 10 storeys.
(iv) The maximum height of the school of nursing shall be 2 storeys.
6. Section 64.44 of By-law 7625 is amended by adding Schedule HOS(3) attached to this by-law.
7. Section 16(249) of By-law 1-83 is amended by adding Schedule HOS(3) attached to this by-law.
8. By-laws 28538, 25569, 21789, 11620 which amended North York By-law 7625 are hereby repealed.
9. By-laws 1766-73, 1792-73, 1736-74, 1936-74, 3213-79, 4234-82 which amended York By-laws 1-83 and 1000 are
hereby repealed.
ENACTED AND PASSED this day of , A.D. 1998
________________ __________________
Mayor City Clerk
Schedule "HOS(3)" to By-Law
Schedule "1" to By-Law
_________
Schedule "G"
(Memorandum dated November 16, 1999 from
the Director, Transportation Services - District 3,
addressed to the Director, Community Planning - North District)
Introduction
The site is located on Church Street, west of Jane Street. As a result of the Health Restructuring Commission, Humber
River Regional Hospital (HRRH) is required to expand the existing Church Street site. The expansion includes: two
building additions (5,150m2 GFA) to the existing hospital (37,400m2 GFA); an expansion of the staff parking on the west
side of the building by 50 parking spaces; a new 214 parking space two-level parking surface for visitors at the south east
corner of the lot; and a new access from Church Street to serve the parking structure and main entrance to the building. As
well, the hospital is undertaking internal renovations, and some external site modifications to the parking areas and parking
aisles.
The application includes lands which are not currently in the ownership of the hospital, namely, a portion of Longview
Drive road allowance which is a dedicated public highway in the ownership of the City (former City of North York).
The hospital is situated such that the southern half of the site is located within the former City of York and the northern
half is within the former City of North York.
Traffic Impact Study
A report entitled "Humber River Regional Hospital, Church Campus, Traffic and Parking Study", prepared by BA
Consulting Group Ltd., dated September 1998, was submitted in support of the application. The traffic report indicates that
with the expansion to the hospital, the net traffic increase in the a.m. peak period will be 155 two-way trips bringing the
morning peak hour to a total of 535 two-way trips, and in the p.m. peak, there will be 165 two-way trips bringing the
afternoon peak hour to a total of 560 two-way trips.
In general terms, the report concludes that while the road network is experiencing high traffic volumes today, the additional
traffic which will be generated by the hospital expansion can be accommodated. Through the course of the consultant's
study, several improvements on the local roads were identified which could assist with current traffic operations. These
improvements are not directly associated with the hospital expansion.
"- modify the pavement markings on Church Street at Jane Street to provide for a 60m rather than 30m of designated
separation between motorists making left turns and motorists making through/right turns from Church Street to Jane Street;
- consider providing more green time for the eastbound approach on Church Street in order to minimize queuing along
Church Street; and
- upgrade the pavement marking and signage at the intersections of Uphill Drive with Pelmo Crescent, with Woodward
Avenue and with Church Street and, in particular, the pedestrian crossing treatment."
The report also indicates that Transportation Demand Management (TDM) measures and Traffic Calming initiatives could
improve the local roadway operations.
This Division has reviewed the report and technical appendices, and concurs with the conclusions and recommendations.
Parking
The proposed on-site parking supply is 676 parking spaces of which 246 parking spaces are proposed for visitor use. The
parking supply exceeds the By-law requirement, however, as noted in the consultant's report, the parking supply is
estimated to be the relative parking demand for the hospital site.
To augment the proposed on-site parking supply, on-street metered parking could be located along Church Street,
Woodward Avenue and Pine Street. The current parking meter supply is about 40 meters but this total will be reduced with
the implementation of a new hospital access from Church Street.
Access
Currently, the hospital site has several accesses from the surrounding streets. The following is a list of current access
locations:
(a) Uphill Avenue has two access points. The northerly access is the primary access to the hospital and serves the main
entrance, ambulance entrance and visitor parking areas. The southern access serves the south visitor parking lot.
(b) Church Street has one access primarily to the south receiving area.
(c) Pine Street has one access which serves the staff parking lot.
(d) Longview Drive has two accesses which serve the staff lots and the north receiving area.
As well, the hospital has a temporary access at 5 Queenslea Drive where staff park at the vacant building.
It is proposed in the application to remove the southern access on Uphill Avenue and introduce a one-way inbound access
from Church Street on the east side of the building. The one-way inbound driveway would serve as a secondary access to
the main access on Uphill Avenue. The new access would result in the removal of a number of on-street parking meters.
Loading
The hospital site has two distinct loading areas on the north and south sides of the building. The loading operations and
truck routes are not anticipated to change significantly with the expansion.
Day Care
An independently operated day care facility is proposed by the hospital at 180 Church Street. The day care is anticipated to
accommodate 50 children and day care staff parking can be accommodated within the hospital staff parking lot. The
driveway to the property, which takes access from Pine Street, is to be re-designed as a circular driveway to better
accommodate the pick-up/drop-off activity, and would likewise require the removal of a number of on-street parking
meters on Pine Street. Details with respect to site layout have not been provided at this time.
Traffic Calming
As noted in the consultant's report, the traffic volumes in the area around the hospital, especially on Church Street, are
relatively higher than the traffic volumes associated with roads within a community setting. During the public consultation
process, various traffic calming measures were illustrated. The purpose of traffic calming is to attempt to change the driver
behaviour on a particular road system which should result in the overall reduction of speed. The speed of traffic appears to
be the principal concern of the area community.
Traffic calming is typically carried out with the installation of physical modifications to the roadway and while its
implementation is not directed to reduce traffic volumes, a successful traffic calming program will alter the street in a
manner that drivers will drive more slowly and consequently this may have the indirect impact of reducing transient traffic.
A traffic calming process has been initiated by the City in co-ordination with the local community and HRRH. If viable
traffic calming measures are determined, then the appropriate reports will be submitted to Council for consideration.
Transportation Demand Management (TDM)
The consultant's report indicates that TDM measures could reduce traffic impacts and parking demands associated with the
hospital's staff. The benefits of any TDM measures designed to reduce work-home based trips and Church Campus-Finch
Campus trips are encouraged. It is recommended that a TDM plan be formulated by the hospital.
Woodward Avenue Extension
The extension of Woodward Avenue to Jane Street has been raised at several public meetings. This suggestion is not a
viable option since Woodward Avenue was originally closed at Jane Street for safety reasons at the time when the ramps
from Highway 400 extension ramps were being constructed. This section of Jane Street to the intersection of Church Street
is under the control of the Ministry of Transportation (MTO). This is to ensure the safe operations of the ramps which
usually extend up to 365 metres from a highway interchange. Woodward Avenue is approximately 60 metres south of the
ramps terminals which is too close to introduce a new intersection.
Road Closures
The expansion of the north side of the hospital building requires a portion of Longview Drive to be closed and sold to the
Hospital. However, the Hospital has expressed its desire to only acquire that portion (approximately 16 metres or 50 feet in
depth) necessary for the expansion.
Longview Drive south of Pelmo Crescent functions as a principal access to the hospital and a secondary access to the
residential property known as 67 Pelmo Crescent.
Given that all municipal services and public utilities within the road allowance serve only hospital related properties, the
remainder of the road between Pelmo Crescent and the hospital needs, is no longer required for municipal purposes.
Therefore, it would appear that it would be in the City's best interest to close the entire section of Longview Drive.
Recognizing that the northern section of Longview Drive is not required for the immediate needs of the hospital, the full
closure of the roadway could be achieved in two sections, for which both processes would be initiated simultaneously. The
first being the southern portion of the road allowance required for the hospital expansion which could proceed concurrent
with the enactment of the site specific zoning By-law, as no other land owners are involved. The second section would be
the northern portion of the road allowance.
Should the closure of the latter section of the road not proceed, then it should be terminated in an appropriate turning circle
to allow road maintenance services to occur.
In addition, the survey supplied with the application indicates a portion of Woodward Avenue east of Pine Street and a
portion of Woodward Avenue west of Uphill Avenue which should have been closed as road allowances in the past, and
are being used solely by the hospital for a parking area and access. The closure of these sections of road allowance must be
initiated to enable the sale of these lands to the hospital.
On-Street Parking Meters
With the implementation of the new Church Street access and the circular driveway for the daycare centre building, several
parking meters need to be removed. The applicant is required to contact the Toronto Parking Authority to determine the
number of parking meters to be removed and the remuneration required.
Site Plan Issues
After reviewing the revised site plans, this Division has the following comments:
(a) All parking spaces reserved for the disabled must be signed and marked in accordance with By-law #31770.
(b) The loading/servicing, ambulance and emergency doctor's parking areas must be signed and marked as such to prevent
parking in these areas.
(c) A detailed signage plan is required for the entire site.
(d) A sidewalk is required on the west side of Uphill Avenue between the hospital entrance and Pelmo Crescent.
(e) All work on the municipal road allowance (curb-cuts, boulevard restorations, utility re-locations, sidewalks, etc.) must
be undertaken to the satisfaction of the Commissioner of Works and Emergency Services, and at no cost to the City of
Toronto.
Recommendation
Therefore, it is recommended that approval of this application be subject to the following:
(a) that the appropriate road closure procedures be initiated in accordance with Council policy, namely:
(i) the closure of Longview Drive south of Pelmo Drive;
(ii) that portion of Woodward Avenue east of Pine Street; and
(iii) that portion of Woodward Avenue west of Uphill Avenue.
(b) that the site plan requirements as noted above have been addressed.
Further, the City will undertake a review of the roadway improvements as suggested by the applicant's transportation
consultant and described in the Traffic Impact Study, and also, we will continue to work with the Ward Councillors to
finalize the development of a Traffic Calming program for the area, in consultation with the Community.
_________
Schedule "H1"
(Memorandum dated October 28, 1998, from
Inspector/Plan Examiner, City of Toronto Fire Services
-North Command, addressed to Planning Department)
The following information is required to conduct a complete review of the proposed development. A revised site plan
showing the following:
(1) clearly mark existing and proposed fire hydrants, (both public and private) to comply with O.B.C. 3.2.5.7.;
(2) existing and proposed Fire Department connections to comply with O.B.C. 3.2.5.5. and 3.2.5.16.;
(3) identify the proposed Fire Access Routes; and
(4) Locate the Fire Alarm Annunciator and Control Panels.
The above-noted information can be dealt with at the Site Plan Control Process.
_________
Schedule "I"
(Memorandum dated March 25, 1998, from the
Director of Professional Services, York Civic Services Centre,
addressed to the Commissioner of Development Services)
We are in receipt of your memo of March 6, 1998 with regards to the above-noted application.
The proponent has not submitted any drawings showing how the site will be served. If storm water is drained to the York
district, the proponent needs to comply with the Sewer Use By-law which requires underground facility to control storm
water run-off for the additional paved area plus the existing paved area.
The proponent is required to apply to the operations Services Department and pay for the cost of reconstructing the existing
curb and sidewalk affected by the application, namely the main entry to the proposed above and below grade open parking
structure.
_________
Schedule "K1"
(Memorandum dated March 11, 1998, from the
Public Health Department, North York Civic Centre,
addressed to the Acting Commissioner of Planning
and the Commissioner of Development Services)
Environmental Health staff have reviewed the above-mentioned application to amend the zoning by-law to permit the
expansion of hospital facilities by a total of 5,160 m2. The proposal is to expand and re-configure the existing emergency
and diagnostic services, ambulatory care and outpatient facilities and the construction of an above and below grade open
parking structure.
The site is bounded by Church Street to the south, Pine Street and Dalbeattie Avenue to the west, Queenslea Avenue and
Pelmo Court to the north and Uphill Avenue to the east.
We have no objections to this proposed application provided that:
- An environmental site assessment is completed in accordance with the MOE's Guideline for Use at Contaminated Sites in
Ontario, revised February 1997. The environmental size assessment should identify any significant potential environmental
liabilities at the site that may have resulted due to the historical usage of the site (garbage incineration) and to identify any
present conditions or practices that may represent a materially significant environment risk.
If you require further information, please contact George Matsumura, Senior Public Health Inspector, Healthy
Environments, at 395-0306.
_________
Schedule "K2"
(Memorandum dated May 29, 1998, from the
Public Health Department, North York Civic Centre,
addressed to the Director of Community Planning)
Environmental Health staff have reviewed the above-mentioned application to amend the zoning by-law to permit the
expansion of hospital facilities at 200 Church Street.
The site is bounded by Church Street to the south, Pine Street and Dalbeattie Avenue to the west, Queenslea Avenue and
Pelmo Court to the north and Uphill Avenue to the east.
On behalf of Humber River Regional Hospital, Angus Environmental Limited (AEL) was hired to carry out a Phase I
Environmental Site Assessment (ESA) in accordance with the substance and intent of the current CSA Standard Z768-94.
The purpose of the investigation was to assess the existing site conditions from an environmental perspective and to
identify the presence or possible presence of potential environmental concerns which might impact upon the future
expansion of the building.
Based on that review and the supporting documentation, we offer the following comments.
AEL provided an assessment of the environmental liability based on information that was available from public records on
the historical land use of the property, aerial photographs and site and building audits. Based on the AEL report and the
Waste Disposal Inventory published by the MOE, no active or closed waste disposal sites are located within two kilometres
of the subject site. Inventories of coal gasification plants and industrial sites where coal tar was produced to used list no
sites of this type located within two kilometres of the subject site.
Recommendations
With respect to the MOE Guidelines for Use at Contaminated Sites in Ontario, revised February 1997, we offer the
following comments based on the review of the AEL report:
- USTs were removed and approximately 209 tonnes of contaminated soil and 600 gallons of oil and water was removed
off site. After backfilling, a single borehold was advanced at one location outside the perimeter of the excavation. One
confirmatory soil sample for BTEX and TPH was taken from the borehole and did not reveal any soil contamination. As
only the south side of the excavated area was analysed, this Department recommends that similar data be made available
for the north, east and west sides of the excavation. In addition, data should be made available to review the quality of the
ground water in this area.
- Documentation should be provided by the applicant stating that the light ballasts that contain PCBs being stored in an
unregistered PCB storage site have been properly disposed. In addition, documentation should be provided stating whether
the hospital intends to discontinue the use of the incinerator and the method presently used by the hospital for the safe
storage of incinerator ash.
- This Department believes that it is not unreasonable for the City to receive an opinion in writing as to whether the
property is suitable for the proposed redevelopment.
Conclusion
Provided that the conditions as set out in the Recommendations are met, this Department has no objections to this proposed
application.
_________
Schedule "M1"
(Communication dated March 27, 1998, from the
Consumer Service Manager, addressed to the
Commissioner of Development Services,
North York Civic Centre)
In response to our letter dated March 9, 1998, and attached plans, we offer comments as follows:
- the service for this site will comply with the terms of our "Conditions and Regulations of Supply"; and
- this site is serviced with a Customer-Owned Transformer Facility. All costs to modify this facility for increased loads or
new needs shall be funded by the proponent.
Drawings submitted at Site Plan require conceptual details and space provisioning in order to ensure that York Hydro's
needs are not compromised. These drawings have the following deficiencies:
- proximity of structures to existing primary lines, (5 meter clear envelope required);
- duct bank routings;
- electrical rooms;
- easement requirements; and
- meter locations.
We urge the Consultants/Architects of this project to resolve these outstanding issues early in the plan processing. Our
Jerry Mirka, Manager of Engineering would be pleased to assist.
_________
Schedule "M2"
(Communication dated December 9, 1998 from the
Supervisor - Drafting, Distribution Operations Expansion,
Enbridge Consumers Gas, addressed to the
Planning Department, North York Civic Centre)
We have indicated on the attached print our existing and/or proposed underground plant.
Please arrange with Dave Forgie at 249-5082 to arrange a site meeting for relocation of gas service prior to construction.
Our standard clearances of 0.3m minimum vertically and 0.6m minimum horizontally must be maintained.
We trust this information is satisfactory for your records.
_________
Schedule "M3"
(Communication dated March 31, 1998, from
Manager - Right of Way, Bell, addressed to the
Planning Department, North York Civic Centre)
Thank you for your letter of March 9, 1998 concerning the above zoning amendment.
Please be advised:
1 We have no objections to this proposed plan as submitted.
If there are any conflicts with existing Bell Canada facilities or easements, the Owner/Developer shall be responsible for
re-arrangements or relocation.
If you have any questions, please contact: Janusz Starszyk 234-4613.
_________
The following persons appeared before the Planning and Transportation Committee in connection with the foregoing
matter:
_________
The Planning and Transportation Committee also had before it the following material, which was forwarded to all
Members of Council with the agenda of the Planning and Transportation Committee for its meeting of November 29, 1999,
and copies thereof are on file in the office of the City Clerk:
- Appendices "A", "B", and "C" appended to the report (November 4, 1999) from the Acting Commissioner of Urban
Planning and Development Services;
- Notices of Community Meetings being held at Pelmo Park Community Centre, York Civic Centre Council Chambers and
York Civic Centre Council Chambers, appended to Appendix "D" of the report (November 4, 1999) from the
Commissioner of Urban Planning and Development Services; and
- Schedules "H2", "I2", "J", "J2", "L", "N" and "O" appended to the report (December 18, 1998) from the Commissioner of
Urban Planning and Development Services.