Application for Amendment to the Etobicoke Zoning Code
Queenscorp (33rd Avenue) Inc.
3531-3533 and 3535-3543 Lake Shore Boulevard West
File No. Z-2288 (Lakeshore-Queensway)
The Etobicoke Community Council after considering the deputations, written
submissions filed and the report (April 29,1999) from the Director of Community
Planning, West District, and for the reason that the proposal is an appropriate use of the
lands, recommends that the application by Queenscorp (33rd Avenue) Inc. to amend the
Etobicoke Zoning Code to permit the development of a 4-storey, 46-unit "mainstreet"
apartment building at 3531-3533 and 3535-3543 Lake Shore Boulevard West, be
approved.
The Etobicoke Community Council reports having held a statutory public meeting in
accordance with Section 34 of the Planning Act, and that appropriate notice of this meeting
was given in accordance with the Planning Act and the regulations thereunder.
The Etobicoke Community Council submits the following report (April 29,1999) from
the Director of Community Planning, West District:
Purpose:
To consider an application to amend the Zoning Code to permit the development of a 4-storey,
46-unit "mainstreet" apartment building at 3531-3533 and 3535-3543 Lake Shore Boulevard
West.
Funding Sources, Financial Implications and Impact Statement:
City funding is not required. There are no impacts on capital or operating budgets.
Recommendation:
It is recommended that the application by Queenscorp (33rd Avenue) Inc. be approved subject
to a Public Meeting to obtain the views of interested parties and, if approved, that an
amending by-law be presented to Council for adoption.
Background:
The subject site is located in the former Village of Long Branch on the south side of
LakeShoreBoulevard West, immediately west of Thirty Third Street. Two commercial
buildings on the site were recently demolished.
Proposal:
The applicant proposes to construct a 46-unit, 4-storey "mainstreet" apartment building on the
site. The building would contain 24 1-bedroom and 22 2-bedroom apartments of
approximately 71.6 mē (771 sq.ft.) and 78.5 mē (845 sq.ft.) in size, respectively.
The proposed apartment building would be located on the north portion of the site, along
LakeShoreBoulevard. The parking area would be located below and behind (south of) the
building, and would be accessed off Thirty Third Street. The landscaping would comprise of
raised planters at the front of the building along Lake Shore Boulevard, and low ground cover
(e.g. shrubs, grass) on the adjacent boulevard of Thirty Third Street. A 2.4 m (8 ft.) wide
mutual driveway straddling the west lot line of the site would be maintained.
A mix of 1 to 2-storey commercial, office and institutional buildings are situated along the
south side of Lake Shore Boulevard in the vicinity of the site. Lands on the north side of Lake
Shore Boulevard are mostly industrial, but include institutional and car-oriented retail uses.
South of the site across a 3.6 m (12 ft.) wide public lane is a low density residential
neighbourhood of 1 to 2 storey dwellings.
Exhibit No. 1 is a map showing the location of the subject property and surrounding zoning.
ExhibitNos. 2, 3 and 4 are reductions of the site plan and elevations, respectively. A summary
of the site data is listed below in Table 1.
The applicant has applied for site plan approval for the proposed apartment building, and
intends to apply later for plan of condominium.
Table 1
Proposed Details: |
|
|
|
Site Area |
2010.2 mē |
21,638 sq.ft. |
|
Gross Floor Area |
4 373.8 mē |
47,080 sq.ft. |
|
Building Height |
14.47 mē |
47.5 ft. |
4 storeys |
Floor Space Index |
2.18 |
|
|
Coverage |
1096.5 mē |
11,803 sq.ft. |
54.5 % |
Parking Required |
74 spaces (incl. 9
visitor) |
@ 1.6 spaces/unit* |
|
Parking Proposed |
52 spaces (incl. 6
visitor) |
|
|
* based on condominium standards appended to Etobicoke Official Plan
Comments:
Official Plan:
The site is designated Commercial-Residential Strip in the former Etobicoke Official Plan,
which permits a wide range of commercial uses, and certain residential uses such as apartment
buildings provided they do not interrupt the continuity of the commercial uses to a significant
degree.
The Central/Western Lakeshore Area Secondary Plan indicates that development along
LakeShoreBoulevard should be predominantly street level commercial uses with apartments
above. Urban design policies in the Secondary Plan support the location of buildings up to six
storeys high close to the street line of Lake Shore Boulevard.
Staff are satisfied that the proposed apartment building conforms to the Official Plan and does
not significantly interrupt the commercial continuity of Lake Shore Boulevard in Long
Branch. The Long Branch Mainstreet Pilot Project study (November, 1995) indicated that this
commercial strip has declined significantly since the 1970s, and the site is situated between
two remaining nodes of commercial activity in the vicinity of Thirtieth Street and Browns
Line. As discussed later, the building has been designed with a "mainstreet" form and its
proposed zoning would permit the ground floor apartments facing Lake Shore Boulevard to
adopt a more commercial character (e.g.live/work) as the Long Branch strip rejuvenates.
Zoning Code:
The subject site is zoned Commercial (C) (Long Branch) in the Etobicoke Zoning Code,
which permits a range of commercial uses, as well as apartment buildings and walk-up
apartments above stores. To permit the proposed apartment building, a site-specific by-law
amendment is proposed to exempt the building from development standards in the Zoning
Code related to parking, building setbacks, floor space index and landscaped open space. In
addition, the by-law would permit the use of the ground floor apartments facing Lake Shore
Boulevard as live/work space as well as other uses permitted in the Commercial zone.
Site Plan Issues:
The proposed apartment building would be located not more than 1.5 m (5 ft.) south of the
street line of Lake Shore Boulevard, with the second to fourth floors being set back slightly, to
approximately 2.8 m (9.2 ft.) from the street line. Raised planter boxes are proposed at grade
along the north wall of the building within the setback area. The low planters would help to
provide privacy from passers-by for the north-facing ground floor apartments. The setback of
the upper storeys is required to provide adequate separation from a high voltage hydro line
located within the right-of-way of Lake Shore Boulevard, directly in front of the apartment
building.
The main lobby of the apartment building and the six north-facing ground floor apartments
would have entrances along Lake Shore Boulevard. The ground floor of the apartment
building would be approximately 5 to 7 steps above grade along Lake Shore Boulevard. The
proposed height of the ground floor level is of concern as it reduces the accessibility of the
building from LakeShoreBoulevard. The applicant is also proposing a 4 ft. high planter
between the entrances to the ground floor units. Reducing the height of the planters and the
number of entrance steps would improve the relationship of the building to the adjacent street.
Planning staff will review whether the number of steps can be reduced and a reduction in the
height of the planters to a height of approximately 2 feet as a condition to site plan approval.
The existing 1.5 m (5 ft.) wide sidewalk and associated boulevard along Lake Shore
Boulevard in front of the site is unusually narrow for a pedestrian-oriented commercial strip.
Currently, streetscape upgrading is planned further west along the south side of Lake Shore
Boulevard (i.e.TwentyThirdStreet to Thirty First Street). As an interim measure, until the
streetscape in front of the site is upgraded as part of a comprehensive program, the applicant
will be requested to enhance the adjacent boulevard (e.g. upgraded street furniture, lighting,
etc) as a condition of site plan approval.
The sidewalk along Thirty Third Street will be widened from 1.2 (4 ft.) to 1.5 m (5 ft.) and the
boulevard will incorporate low landscaping. The existing parallel parking on the west side of
ThirtyThird Street beside the site will be maintained and new street trees added. The parking
located behind the building will screened with fencing and/or landscaping. A detailed
landscape plan will be required as a condition of site plan approval.
Agency Comments:
Toronto Fire, Realty, Police and Health Services have expressed no concern with the proposal.
The Economic Development Division of Economic Development, Culture & Tourism advises
that employment generating uses are viable on the site and recommends a commercial
component on the ground floor of the building, and a site plan which is consistent with the
commercial character along an arterial road. As addressed earlier, the proposed zoning would
provide for potential use of the ground floor units for live/work and commercial purposes.
Toronto Hydro has indicated that it will accept a minimum setback of approximately 2.8 m
(9.2 ft.) from the from the upper floors of the building to the street line on Lake Shore
Boulevard, provided that the applicant pays for the relocation of hydro facilities. Confirmation
of this setback in consultation with Toronto Hydro will be included as a condition of site plan
approval.
The Technical Services Division of Works & Emergency Services advises that water, storm
and sanitary services are available. The applicant's soil/groundwater report has been accepted
by City's peer reviewers. As a condition of site plan approval, the Technical Services Division
will require a stormwater management report and lot grading plan for review, confirmation
that the proposed waste/recycling facilities are acceptable, and that the applicant enter into an
agreement with the City, and post adequate bonding, to ensure completion of the grading and
other services.
The Transportation Services Division of Works & Emergency Services has advised that the
proposed parking supply is acceptable provided that apartments in the building are limited to 1
and 2-bedroom units. It also advises that the proposed loading and servicing are acceptable for
a "mainstreet" building.
The details of fencing, curbing and signage of the parking area, retention of the sidewalk on
ThirtyThird Street at the access driveway, and reconstruction of the public lane behind the site
are to be to the satisfaction of Transportation Services. Transportation Services also
recommends elimination of the mutual right-of-way along the west lot line of the site, and that
garage access, lighting and security be to the satisfaction of Toronto Police Services.
Transportation Services advises that the Toronto Parking Authority may require the
installation of parking meters adjacent to the site along Thirty Third Street at the applicant's
expense. All of these matters will be addressed as conditions of site plan approval.
Transportation Services has requested a road widening along Lake Shore Boulevard of up to
0.82m (2.7 ft.) towards achieving the 36 m (118 ft.) right-of-way shown in the Official Plan.
The road widening will require that the front planters for the proposed building be located
south of the existing front walls of adjacent buildings which are developed to the current street
line.
Community Meeting:
On April 22, 1999, a community meeting was attended by approximately 35 area residents
who indicated general support for the application. As requested by residents, the applicant
agreed to vary the types of materials and detailing on different sections of the building face to
reduce its massing. Residents also requested that a construction management plan be required
by the City. Concern was also expressed by some residents regarding the adequacy of parking
for the apartment building.
Conclusions:
The Long Branch commercial strip has declined for several years and needs new development
and other investment to begin its renewal. The proposed "mainstreet" apartment building
conforms with the relevant Official Plan policies as it would not significantly disrupt the
continuity of commercial use in the Long Branch strip. As well, the proposal is compatible
with surrounding land uses and could be accommodated from a design and transportation
perspective.
Conditions to Approval:
1.The amending by-law shall confirm the existing Commercial-1 (C) zoning of the site and
incorporate site-specific provisions addressing matters including parking, front, side and rear
setbacks, landscaped open space and floor space index. As well, the by-law would permit use
of the ground floor units facing Lake Shore Boulevard for live/work space as well as uses
currently permitted by the Commercial zoning.
2.Further consideration of the proposal under Site Plan Control to include:
(i)Signing of a Site Control Agreement and payment of the necessary fees associated with
the preparation, execution and registration of same.
(ii)Submission of a landscape plan detailing planting, lighting, curbing, fencing, grading and
street trees, and the posting of a financial guarantee to ensure compliance with the approved
plans, to the satisfaction of the City Planning Division of Urban Planning & Development
Services.
(iii)Submission of a stormwater management report, grading plan and construction
management plan to the satisfaction of the Technical Services Division of Works &
Emergency Services.
(iv)Provision of on-site services, including storage of waste and recyclable materials, the
treatment and provision of stormwater management facilities (including payment of
stormwater quality cash-in-lieu, if required), and the posting of adequate bonding to ensure
completion of the grading and services, and compliance with the construction management
plan, to the satisfaction of the Technical Services Division of Works & Emergency Services.
(v)Fencing along the south lot line and Thirty Third Street, curbing of the driveway and
parking area, maintenance of the sidewalk at the access driveway off ThirtyThirdStreet,
signage of visitor parking, and reconstruction of the public lane behind the site, to the
satisfaction of the Transportation Services Division of Works & Emergency Services.
(vi)Garage access, lighting and security to the satisfaction of Toronto Police Services and
the City Planning Division of Urban Planning & Development Services.
(vii)If required by the Toronto Parking Authority, installation of parking meters for the
existing on-street tandem parking spaces adjacent to the site along ThirtyThirdStreet, at the
applicant's expense.
(viii)Resolution of whether the existing mutual right-of-way along the west lot line can be
eliminated in consultation with the abutting landowner, to the satisfaction of the City Planning
Division of Urban Planning and Development Services and the Transportation Services
Division of Works & Emergency Services.
(ix)Payment of 5% cash-in-lieu of parkland to the satisfaction of the Policy & Development
division of Economic Development, Culture & Tourism.
(x)Payment of applicable development charges in effect at the time of the issuance of
building permits.
(xi)Confirmation of the building setbacks from Lake Shore Boulevard and hydro facilities in
consultation with Toronto Hydro.
(xii)Dedication of a road widening ranging from 0.57 m (1.9 ft.) to 0.82 m (2.7 ft.) along the
Lake Shore Boulevard frontage to the satisfaction of the Transportation Services Division of
Works & Emergency Services.
(xiii)Enhancement of the boulevard along Lake Shore Boulevard with upgraded street
furniture, lighting, etc to the satisfaction of the City Planning Division of Urban Planning &
Development Services.
(xiv)The grade of the ground floor of the apartment building and the height of associated
planters and steps on Lake Shore Boulevard to be lowered to the satisfaction of the City
Planning Division of Urban Planning & Development Services.
3.Consideration of an application for plan of condominium to include restricting the
apartment building to 1 and 2-bedroom units, to the satisfaction of the City Solicitor.
Contact Name:
Jamie McEwan, Senior Planner Tel: (416) 394-8878
Community Planning, West DistrictFax: (416) 394-6063
(A copy of Attachments Nos. 1-9, referred to in the foregoing report, was forwarded to all
Members of Council with the agenda for the Etobicoke Community Council meeting of May
26, 1999, and a copy of each is on file in the office of the City Clerk.)
_____
The following persons appeared before Etobicoke Community Council in connection with the
foregoing matter:
-Mr. Mark Bozzo, Queenscorp (33rd Avenue) Inc., in support of the application; and
-Mr. Richard Ciupa, expressing concern that the Long Branch Main Street Project is not
being adhered to and requesting that consideration be given to making the facade of the
project more "mainstreet".
|