Rate if paid on or before due date |
Rate if paid after due date |
|
---|---|---|
Block 1 – For all water consumption up to 5,000 m3 | $4.1346/m3 | $4.3522/m3 |
Block 2 – For consumption over 5,000 m3 | $2.8941/m3 | $3.0464/m3 |
Block 2 rates apply to businesses participating in the Industrial Water Rate Program.
Rate if paid on or before the due date |
Rate if paid after due date |
|
---|---|---|
Block 1 – For all water consumption up to 1,099,850 gal. | $0.01879620/gal. | $0.01978497/gal. |
Block 2 – For consumption over 1,099,850 gal. | $0.01315679/gal. | $0.01384916/gal. |
Block 2 rates apply to businesses participating in the Industrial Water Rate Program.
Description | Fee $ |
---|---|
Dishonoured Cheque Processing – Processing a cheque returned by a bank or financial institution for reasons, such as insufficient funds | $40 per cheque, per payment |
Duplicate Utility Bill Fee – Applied to a utility account when a Utility Bill Designate agreement is in place. A copy of the bill will be mailed to the property owner. | $19.17 per additional bill |
New Account Setup Fee – For water/utility accounts | $71.75 per new account |
Outstanding Utility Fees/Charges for Condo/Management Boards – Applied to a condominium utility account for all mailed overdue notifications. A single charge for the first notification sent to the Condo/Management Board. If additional notification is required, fees will be charged on the condo utility account for each notice mailed to every individual condominium unit owner in the building/complex. | $31.83 per notification |
Ownership Change Fee – Request to change ownership on both tax and utility accounts for the same property when requested at the same time | $58.34 combined fee per property |
Payment Re-Distribution Fee – Any request to re-distribute payment when an electronic payment has been made to an incorrect account | $45.76 per request |
Reprint Utility Bill – For a request for the reproduction/reprint of a bill | $19.45 per bill |
Special/Final Read Fee – To finalize a utility account | $17.47 |
Utility Account Ownership Change Fee – Administrative fee to reflect a change in ownership on an existing utility account | $40.77 per ownership change |
Utility Clearance Certificate – Notice confirming balance owing on a utility account, generally used for property sale transactions | $54.95 per certificate |
Water Collection Field Visit | $29.13 per field visit |
Water Consumption Statement – Statement detailing activity on a utility account for one specified year | $46.61 for one year |
Water Consumption Statement – Statement detailing activity on a utility account for each subsequent year | $29.13 for each subsequent year |
Fees are reviewed annually as part of the budget process and are subject to change.
Description | Fee $ |
---|---|
Automated Meter Reading Transmitter – Fee for water consumers who lose or damage an automated meter reading transmitter | $104.82 |
Flat Rate Legacy Fee – Fee for property owners who have not permitted the installation of a new automated meter | $1,269.17 per year |
Manual Water Meter Reading Fee – Fee for a manual water meter reading for property owners who have not permitted the installation of a new automated meter | $95.15 per visit |
Fees are reviewed annually as part of the budget process and are subject to change.
Service | Fee $ |
---|---|
Annual Seasonal Meter Activation Fee: includes replacement, removal of the water meter; one turn-on, one turn-off | $238.76 |
Conduct fire hydrant flow test | $310.39 |
Disconnection Fee for any residential water service less than or equal to 25 mm | $1,469.70 |
Fire hydrant permit | $186.20 |
Installing 19 mm new residential water service and meter | $4,971.05 |
Installing 25 mm new residential water service and meter | $5,759.93 |
Processing annual water supply backflow prevention device testing reports | $57.86 |
Reuse of residential water service 19 mm to 25 mm | $310.15 |
Single Service call Turn-off/Turn-on within 30 minutes | $93.04 |
Unregistered water each day order not complied | $62.02 |
Water meter accuracy test; meter less than or equal to 50 mm – No Chamber – applied if the meter does not over-register | $186.20 |
Water Turn-off Fee for demolition; (disconnection of old water service not included) | $93.04 |
Water Turn-off/Turn-on Fee | $93.04 |
Fees are reviewed annually as part of the budget process and are subject to change.
Service | Fee $ |
---|---|
Disconnect residential sanitary sewer service connection in the road allowance | $1,534.54 |
Inspection fee for the reuse of residential City sewer connection up to 150 mm in diameter | $621.60 |
Install a new residential sanitary sewer service connection in the road allowance | $12,434.11 |
Install a new residential storm sewer service connection in the road allowance | $12,434.11 |
Technical Review by Toronto Water staff – Application to Toronto Water for an exemption to permit the construction of a driveway sloped downwards towards a residential building | $1,863.05 |
Technical Review by Toronto Water staff – Application to Toronto Water for new connection or change or alteration to the existing storm connection, sanitary or water supply connection | $372.37 minimum fee; additional $91.85/hr for each hour after 4 hrs to a maximum of $1,863.05 |
Technical Review by Toronto Water staff – Application to Toronto Water for the request to encroach within a City permanent or temporary easement (related to City water and sewer infrastructure) | $372.37 minimum fee; additional $91.85/hr for each hour after 4 hrs to a maximum of $1,863.05 |
Technical Review by Toronto Water staff – Application to Toronto Water for the request to release from title a City easement (related to City water and sewer infrastructure) | $372.37 minimum fee; additional $91.85/hr for each hour after 4 hrs to a maximum of $1,863.05 |
Fees are reviewed annually as part of the budget process and are subject to change.