August 20, 1998
Ms. Novina Wong
Clerk
City of Toronto
7th Floor, Metro Hall
55 John Street
Toronto, Ontario
M5V 3C6
Dear Ms. Wong:
At its meeting on Wednesday, August 19, 1998, the Commission considered the attached
report entitled, "Procurement Authorization - Excavation And Paving 1998 Surface Track
Program."
The Commission approved the Recommendation contained in the above report, as listed
below:
"It is recommended that the Commission:
1)approve the issuance of a Purchase Order in the total upset limit amount of $3,802,000 to
the City of Toronto - Works & Emergency Services Department for the Commission's cost
of excavation and paving within the track allowance. This work will be completed by the
City of Toronto in 1998; and
2)forward this report to the City of Toronto requesting an increase in the TTC's approved
1998 capital program in the amount of $2,223,000 and a corresponding increase in Project
Approval to reflect the downloading of costs from the City to the TTC for the road
reconstruction portion of the surface track work, (this work has traditionally been funded
through the City's Transportation departments budget); and
3)note that this work is proceeding at this time since deferral of the work would impact the
ability to complete the work in a timely and cost efficient manner."
The foregoing if forwarded to City of Toronto Council for the necessary approval, as
detailed in the report.
Sincerely,
Vincent Rodo
General Secretary
1-64 - Attachment
TORONTO TRANSIT COMMISSION
REPORT NO.
MEETING DATE:August 19, 1998
SUBJECT:PROCUREMENT AUTHORIZATION -
EXCAVATION AND PAVING
1998 SURFACE TRACK PROGRAM
RECOMMENDATION
It is recommended that the Commission:
1)approve the issuance of a Purchase Order in the total upset limit amount of $3,802,000 to
the City of Toronto - Works & Emergency Services Department for the Commission's cost
of excavation and paving within the track allowance. This work will be completed by the
City of Toronto in 1998; and
2)forward this report to the City of Toronto requesting an increase in the TTC's approved
1998 capital program in the amount of $2,223,000 and a corresponding increase in Project
Approval to reflect the downloading of costs from the City to the TTC for the road
reconstruction portion of the surface track work, (this work has traditionally been funded
through the City's Transportation departments budget); and
3)note that this work is proceeding at this time since deferral of the work would impact the
ability to complete the work in a timely and cost efficient manner.
FUNDING
There are insufficient funds to accommodate the downloading impact of City costs in the
1998-2002 Capital Program under 1.2 Surface Track Replacement Program & Surface -
Special Trackwork Replacement Program, as set out on pages 31-51 in the "State of Good
Repair" category. A total amount of $1,579,000 was budgeted for excavation and paving in
1998, leaving a shortfall of $2,223,000 as a result of City downloading.
The TTC's 1999-2003 Capital program will included sufficient expenditure estimates to
accommodate the cost of the work downloaded from the City's budget to the TTC's budget.
The downloading of the costs amount to an increase of $28.8 million in the TTC's
1998-2002 budget envelope.
BACKGROUND
Each year sections of the Streetcar network are rehabilitated by the Commission in
conjunction with the City of Toronto (formerly Metro Transportation and City of Toronto).
Under this arrangement the Municipalities provided technical assistance with the project
while funding a portion of the roadway costs under a cost-sharing formula. In 1998, the City
of Toronto withdrew previously committed funds from this program.
In order to maintain the Streetcar tracks in a state of good repair, it is necessary to proceed
with these projects as originally planned, absorbing the City of Toronto excavation and
paving costs associated with this work (see attached letter dated April 7, 1998).
DISCUSSION
There are 6 surface track locations and 5 special trackwork locations scheduled in 1998
within the City of Toronto jurisdiction. No change in the scope or schedule of the program
was made from budget. The Commission's portion of the cost for excavation and paving
work within the track allowance at these locations is estimated by the City of Toronto -
Works & Emergency Services Department at an upset limit amount of $3,802,000.
JUSTIFICATION
In order to maintain the Commission's surface track system in a state of good repair, it is
necessary to proceed with this work in 1998.
Approval is also necessary to enable payment for the Commission's portion of the
excavation and paving costs, including the impact of City downloading.
- - - - - - - - - - - -
August 24, 1998
6-123-124
Attachment:April 7, 1998 letter to Metro
STAFF SUMMARY SHEET
OPERATIONS BRANCH |
PREPARED BY:J. TEEPLEMANAGER - D. DIXON
EXTENSION:2067GENERAL MANAGER - G.M. WEBSTER
USER ID:JTEEPLEDATE REQUIRED BY THE ORIGINATOR: |
PURPOSE:PROCUREMENT AUTHORIZATION - EXCAVATION & PAVING 1998 SURFACE TRACK PROGRAM
DISCUSSION:
ALTERNATIVES:
(If applicable)
FUNDING:
(If applicable)
RECOMMENDATIONS:
|
# |
ROUTING |
CONCUR |
NON-CONCUR |
DATE |
ATTACHMENT(S) |
|
GM - ENG & CONST |
|
|
|
- Commission Report |
7 |
GM - EXECUTIVE |
|
|
|
4 |
GM - OPERATIONS |
|
|
|
|
DEPUTY GM - SUBWAY |
|
|
|
2 |
DEPUTY GM - SURFACE |
|
|
|
ACTION REQUIRED BY CHIEF GENERAL MANAGER |
8 |
DEPUTY GM - CORPORATE |
|
|
|
9SIGN AGREEMENT
9RECEIVE FOR INFORMATION
9APPROVE
:APPROVE FOR SUBMISSION TO COMMISSION
9APPROVE FOR SUBMISSION TO CHAIR
___________________________________________
SIGNATURE DATE |
|
GENERAL COUNSEL |
|
|
|
6 |
CFO - FINANCE |
|
|
|
|
MGR - HUMAN RES |
|
|
|
5 |
MGR - M&P |
|
|
|
3 |
MGR - SUPPORT SERVICES |
|
|
|
1 |
GS - STREETCARS |
|
|
|
|