October 8, 1998

Ms. Novina Wong

Clerk

City of Toronto

Station 1071, 7th Floor

Metro Hall

55 John Street

Toronto, Ontario

M5V 3C6

Dear Ms. Wong:

At its meeting on Wednesday, October 7, 1998, the Commission considered the attached report entitled, "Replace McBrien Building Switchboards."

The Commission approved the Recommendation contained in the above report, as listed below:

"It is recommended that the Commission approve:

1)Proceeding with the replacement of McBrien Building Switchboards at a total cost of $290,000,

2)Forwarding this report to the City of Toronto Council advising them of a scope change, and

3)Staff to proceed with this expenditure and hold in TTC accounts, pending City Council Project Approval."

The foregoing is forwarded to City of Toronto Council for the necessary project approval, as detailed in the report.

Sincerely,

Vincent Rodo

General Secretary

1-64

Attachment

TORONTO TRANSIT COMMISSION

REPORT NO. 18

MEETING DATE:October 7, 1998

SUBJECT:REPLACE MCBRIEN BUILDING SWITCHBOARDS

RECOMMENDATION

It is recommended that the Commission approve:

1)proceeding with the replacement of McBrien Building Switchboards at a total cost of $290,000,

2)forwarding this report to the City of Toronto Council advising them of a scope change, and

3)staff to proceed with this expenditure and hold in TTC accounts, pending City Council Project Approval.

FUNDING

Due to lower costs than anticipated for surface vehicle hoist in Project 3.2, sufficient funds are available in 1998 for this unbudgeted expenditure within Project Program 3.2 - Equipment of the 1998-2002 Capital Program as approved by City Council on April 29,1998. This item has been included in the proposed 1999-2003 Capital Program under 3.2 - Equipment.

BACKGROUND

The existing primary electrical distribution system (switchboard), located in the basement of the McBrien building, receives, controls and directs power to the entire building. The switchboard is approximately 40 years old and does not meet present Ontario Hydro code requirements for short circuit capacity. On July 28, 1998, the CGM approved funds in the amount of $46,000 to commence design work.

DISCUSSION

Following maintenance work to the switchboard in March 1998, Ontario Hydro approved power re-connection with the understanding that upgrade of the major internal components will be carried out within approximately one year.

The main concern with the switchboard is the fact that the 50,000A short circuit capacity of the existing main breakers is significantly lower than the recently upgraded Toronto Hydro service, which has a short circuit capacity of 100,000A. As a result of this incompatibility, there exists the potential for damage to the building facilities in the event of a short circuit fault. The switchboard could be destroyed creating a power blackout in the entire building for an extended period of time.

JUSTIFICATION

The work identified is to be completed in late 1998 or early 1999, in order to address the high risk of damage to the McBrien Building electrical distribution systems, computer systems and heating and ventilation systems, and to return this facility to a state of good repair and safety. Project approval will provide the necessary funds to complete this project this year and thereby comply with the Electrical Code.

September 10, 1998

85-21-21

190384

STAFF SUMMARY SHEET

ENGINEERING & CONSTRUCTION BRANCH
PREPARED BY: P. AndersonDEPARTMENT HEAD - T.G. Middlebrook

EXTENSION: 4075GENERAL MANAGER - J.A. Sepulis

USER ID: Panderso

COMMISSION REPORT RE:REPLACE MCBRIEN BUILDING SWITCHBOARDS

DISCUSSION:

FUNDING:

(If Applicable)

RECOMMENDATIONS:

# ROUTING CONCUR NON-CONCUR DATE ATTACHMENT(S)
2 GM - ENG & CONST - Commission Report
6 GM - EXECUTIVE
4 GM - OPERATIONS
3 DEPUTY GM - SUBWAY
DEPUTY GM - SURFACE
DEPUTY GM - CORPORATE CORP ACTION REQUIRED BY CHIEF GENERAL MANAGER
GENERAL COUNSEL 9 SIGN AGREEMENT

9 RECEIVE FOR INFORMATION

9 APPROVE

: APPROVE FOR SUBMISSION TO COMMISSION

9 APPROVE FOR SUBMISSION TO CHAIR

__________________________________________

SIGNATUREDATE

5 CHIEF FINANCIAL OFFICER
MGR - HUMAN RES
MGR - M&P
1 CHIEF ENGINEER

190384

 

   
Please note that council and committee documents are provided electronically for information only and do not retain the exact structure of the original versions. For example, charts, images and tables may be difficult to read. As such, readers should verify information before acting on it. All council documents are available from the City Clerk's office. Please e-mail clerk@city.toronto.on.ca.

 