May 12, 1999
To:Scarborough Community Council
From:Ted Tyndorf, MCIP, RPP
Director of Community Planning, East District
Subject:PRELIMINARY EVALUATION REPORT
Official Plan Amendment Application SP1999005
Zoning By-law Amendment Application SZ1999008
The T. Eaton Company Limited
Part of Lot 25, Concession 2
City Centre
Scarborough City Centre
Purpose:
This report provides preliminary information regarding applications to redesignate and rezone the subject lands to provide
for a mixed use development containing residential, commercial/retail and office uses. Staff also seek authorization to
schedule a Community Meeting, and work with the applicant to achieve a high quality site plan which is appropriate for the
City Centre.
Financial Implications:
None.
Recommendations:
That the Scarborough Community Council direct staff to:
1.Hold a Community Information Meeting. Notice for this meeting to be provided to the nearby Community
Associations, and property owners within 120 metres (400 feet) of the site, in consultation with the local Ward Councillors.
2.Require the applicant to submit the following in support of these applications: Site Plan Control Application, Traffic
Impact Study, Wind and Micro-Climate Study and Hydrogeological Study.
3.Process the applications in the normal manner and work with the applicant to a achieve a high quality site plan
appropriate for the City Centre, having regard for building location, massing, design and roof design to achieve the City
Centre Design objectives including a strong identifiable image to provide an attractive addition to the Scarborough City
Centre skyline.
4.Target the Public Meeting of Council in the fourth quarter of 1999, subject to the conditions listed above.
Background:
The subject site, comprising 1.79 hectares (4.4 acres) of vacant land, are designated City Centre Uses in the Official Plan
which provides for "all land uses appropriate to form a ... regional centre to serve primarily Scarborough..." The site is
currently zoned Industrial (M) permitting a variety of industrial and non-industrial uses.
The details of the current permissions and the proposed development are as follows:
|
Permitted |
Proposed |
Residential |
150 uph (60 upa)
269 units |
297 uph (119 upa)
532 units |
Office (plus Retail) |
3 X Lot Area
53 800 square metres
(579,200 square feet) |
0.42 X Lot Area
7 600 square metres
(81,800 square feet) |
Note:
Uuph- represents units per hectareupa- represents units per acre
This proposal consists of 2 high-rise buildings and 2 mid-rise buildings situated on a 2 level podium, as well as some
townhouse units which may be built as live/work units. The residential component will be located in the high-rise and
mid-rise buildings, while the office and commercial/retail component wiill be contained in the 2 level podium.
Comments:
Benefits
The subject site is located in close proximity to the Scarborough City Centre, near the Scarborough Centre RT station and
bus terminal, and is situated adjacent to Scarborough's most prominent shopping centre. A high quality development on
this block will continue the development of the City Centre skyline and contribute to the growth of a vibrant active City
Centre for the Scarborough Community. It also provides for a sense of "entry" or "gateway" on a major approach to the
City Centre as envisioned by your Plan.
The proposal represents a major step in urbanizing the westerly portion of the City Centre and would provide additional
dwelling units to the City's overall housing stock.
Concerns
Site Design
The concept presents the building massing close to the Brimley Road and Progress Avenue streetline to assist in creating a
pedestrian friendly street edge. The building massing also achieves a good relationship between the high-rise building form
and the lower interior components of the site.
While a positive street edge treatment has been developed, the elevations facing west and south indicate exposed parking
garage walls. This aspect of the project design needs to be reviewed more thoroughly to ensure a positive relationship with
adjoining properties.
Technical Studies and Services
A traffic impact study is required to assess the effect of this development. The study should address site access and
capacity of the nearby street network, in particular, having regard for the Brimley/Progress and Brimley/Triton Gate
intersections. The study should also take into account other planned developments in the vicinity, such as the Omni
development to the south.
The Design Policies of the City Centre Secondary Plan state "buildings shall be designed to be climatically comfortable." A
wind and micro-climate assessment study should be submitted in order to ensure that the proposal creates a positive
environment for the future occupants of a high-rise development such as the one proposed.
School capacity and hard services for the proposal also need to be addressed. These issues will be dealt with in the usual
manner with the School Board and the Works and Emergency Services Department.
Hydrogeology
The new proposal includes two levels of underground parking. Ground water problems have previously been identified in
other City Centre locations. Therefore, the applicant should submit a hydrogeological study/soils study to verify that the
proposed underground parking can be safely provided and to propose appropriate de-watering systems if required. Given
the importance of this location and the size of the parcel, it is important to ensure that a sufficient amount of parking can be
accommodated on this site without the necessity of constructing a large above grade parking structure.
Official Plan Policies
Section 4.1.2.3 of the Official Plan states "in considering development proposals in the City Centre, the City will ensure
that the total amount of residential floor space, but not including hotel space, does not exceed the total amount of office
floor space throughout the entire City Centre". Current zoning permissions in the City Centre for office use exceed current
zoning permissions for residential use by approximately 166 870 square metres (1,796,230 square feet). This proposal
therefore is in conformity with the City Centre Secondary Plan.
Contact Name:
Bill Kiru, MCIP, RPP
Planner, Community Planning Division
Scarborough Civic Centre
Telephone:(416) 396-7014
Fax: (416) 396-4265
E-mail:kiru@city.scarborough.on.ca
Respectfully submitted,
Ted Tyndorf, MCIP, RPP.
Director of Community Planning, East District
VBK/TT/vbk