December 18, 1998
To:Urban Environment and Development Committee
From:Commissioner of Urban Planning and Development Services
Subject:FINAL RECOMMENDATION REPORT - ZONING AMENDMENT
APPLICATION - Humber River Regional Hospital, 200 Church Street
File UDZ-98-05/R98-002 (Ward 6 - North York Humber; Ward 27 - York Humber)
Purpose:
This is a final recommendation report on the rezoning for the expansion of the Humber River
Regional Hospital at 200 Church Street to permit additions to the existing hospital on the
north and south sides. A two storey parking garage on the southeast corner of the site has also
been proposed. This site straddles the boundary of the former municipalities of York and
North York and therefore all planning reports have been directed to the Urban Environment
and Development Committee for consideration and in order to hold the statutory public
meeting.
Recommendations:
It is recommended that the rezoning application for 200 Church Street be approved subject to
the following conditions:
1.The zoning be amended to a hospital zone in accordance with an implementing zoning
by-law which generally complies with the draft by-law attached as Schedule "F" and the
by-law be perfected prior to enactment;
2.Prior to the enactment of the zoning by-law, the following conditions shall be met:
(i)the southern 15.27 metres of Longview Drive be closed and stopped up and conveyed to
those persons entitled by law to such conveyance;
(ii)The closed portions of Woodward Drive on the east and west sides of the hospital site be
conveyed to the hospital.
3.The design principles outlined in Schedule "A" apply to the consideration of any site plan
approval application.
4.Prior to site plan approval, a community meeting be held to discuss the parking and drop
off areas for the proposed daycare at 180 Church Street and the daycare be included as a
permanent use in the zoning by-law.
5.The conditions of the Works and Emergency Services Department as set out in Schedules
"G", "H1" and "I" be met.
6.The conditions of the Public Health as set out in Schedule "K1" and "K2" be met.
7.The conditions of the utilities as set out in Schedules "M1", "M2", and "M3" be met.
Background:
1.0Site and Surrounding Area
The site straddles the former municipalities of York and North York in the southeast quadrant
of Jane Street and 401 and is predominantly surrounded by detached homes. The hospital
owns 10 of the 14 houses around the site (see Schedules "A" and "B").
The hospital site (see Schedule "C" - Site Plan) is characterized by the existing two to seven
storey hospital building in the middle of the site with its main access on Uphill Avenue.
Parking is located on the east, west and north portions of the site with the service areas are
generally located on the west side of the hospital.
2.0Proposal
The Humber River Regional Hospital is proposing to expand the Church Street facility to
implement the Provincial Health Services Restructuring Commission (HSRC) directives. The
original proposal submitted was for the immediate expansion of both the mental health wing
on the south side of the building (Church Street) involving a two level structure plus a
basement level of approximately 2,415 m2 (26,000 sq.ft.) and the expansion of the emergency
wing on the north side of the building (Pelmo Crescent) involving a one level plus basement
level addition of approximately 2,415 m2 (26,000 sq.ft.). The north addition also requires the
closing and acquisition of Longview Drive. A new electrical transformer station is also
proposed on the west side of the existing building with an area of approximately 330 mē
(3,570 sq.ft.).
Since the time of the original proposal, the hospital has determined that the mental health
program can be moved to the Finch site of the Humber River Regional Hospital and therefore
the south expansion of the Church Street site is not immediately necessary which responses to
community consultation where a common suggestion arose to move any programs possible to
the Finch site of the hospital where there is more room for expansion.
In addition, the applicant is proposing to construct a two level parking structure, located
partially underground, on the southeast corner of the site at the junction of Church Street and
Uphill Avenue. The parking spaces will increase by 150 spaces from 526 spaces to a total of
676 spaces. The total increase in the gross floor area including the south expansion would be
5,160 m2 (55,550 ft.) increasing the existing floor space index of 0.71 to 0.82. With the south
expansion excluded, the increase in gross floor area is 2,745 mē (29,570 sq.ft.) which
increases the floor space index to 0.77.
Table 2.1- Site Statistics
|
North Addition + Electrical |
South
Addition |
Existing
Hospital |
Total |
Site Area |
|
|
|
45,190 mē |
Gross Floor
Area |
2,745mē |
2,415mē |
32,236
mē |
37,396 mē |
Floor Space
Index |
0.06 |
0.05 |
0.71 |
0.82 |
Parking
Provided |
150 spaces |
526
spaces |
676 spaces |
Parking
Required |
1 space/28 mē of bedroom area |
144 spaces |
3.0Planning Controls:
The site straddles two former municipalities, therefore two Official Plan and Zoning By-law
designations apply to the site.
3.1Official Plan Designations:
North York District:General Institutional which permits institutional uses including hospitals
and uses ancillary and complementary to hospitals
York District:Institutional which permits the hospital use
The proposal complies with the Official Plans for both former municipalities.
3.2.Zoning
North York District:R4 (One-Family Detached Dwellings Fourth Density Zone) subject to
site specific by-laws 11620, 21789, 25569, and 28638 which permit the existing hospital use
and built form.
York District:R1 (Residential Zone 1) subject to site specific by-law Section 16(249) which
permits the hospital use and built form.
The existing site specific by-laws in both municipalities do not contemplate any extension of
boundary lines to include the house lots now owned by the hospital, or the expansion of the
hospital uses onto those lots. Expansion of the hospital footprint and the parking areas is also
not contemplated in the existing site specific by-laws.
4.0Community Consultation
Prior to the rezoning application, submitted on February 24, 1998, the hospital held several
meetings with the community to inform the local residents of the future plans for the hospital
and get their feedback. The Urban Planning and Development Services Department held an
Information Meeting at Pelmo Park School on May 21, 1998. Two working groups were
formed to address the issues identified by planning staff and the community. The issues are
outlined below. As well, City Council, at its meeting of June 3, 4 and 5, 1998, recommended
that an Advisory Committee on restructuring matters be created with representation from local
councillors and the community.
4.1Working Groups
The Working Groups are comprised of local residents living, for the most part, in the
immediate vicinity of the hospital. Representatives from the Pelmo Park and Weston
Ratepayers Associations attended as representatives of the larger communities. Planning staff
also attended the various meetings.
The Working Groups identified and discussed the issues over a span of nine meetings. The
meetings were divided into two main topics: Design and Massing, and Parking and Traffic.
The following issues arose at the Design and Massing Group meetings:
-location and built form of the parking garage
-location of front entrance for the hospital
-substantial landscaping required over the entire site
-keep existing front yard (as much as possible) on Church Street
-reduction of berm by the west parking area
-built form and impact of the north addition on the adjoining residential homes
-facade improvements
The Parking and Traffic Group meetings focussed on the following issues:
-traffic speed and infiltration to neighbourhood
-circulation of traffic and pedestrians around and within the hospital grounds
-parking adequacy, location and potential reductions of staff parking
The issues from both groups are discussed in the Planning Issues and Urban Design sections
of the report.
4.2 Advisory Committee on Restructuring Matters
In accordance with the direction given at the May 19, 1998 Urban Environment and
Development Committee meeting, an advisory group was established composed of the six
area Councillors, community representative and hospital and city staff. This group was given
the direction to assess the impact of planning decisions on the respective communities, to
discuss hospital program planning and the Health Services Restructuring Commission
decisions. The group has had several meetings and has recommended that the hospital
continue to work to shift some the substance abuse services (part of mental health) from the
Church site back to the Finch site.
While the programming within the hospital is beyond the scope of the rezoning application,
the program requirements of the hospital have directed the location and extent of the proposed
hospital expansion. The north expansion responds to the need for the expansion of both the
Emergency Room and the diagnostic imaging department on the main floor. The southern
expansion reflected the need to upgrade the mental health department which subsequently will
be moved to the Finch site in response to the Advisory Group's recommendation.
4.3Information Meetings
Three Information Meetings have been held for this project. One was held on May 21, 1998.
Approximately 30 people attended this meeting. Two others were held November 3 and 4,
1998, one each in the former municipalities of York and North York. Similar issues were
raised as in the Working Groups such as traffic, facades, parking, landscaping, and impact on
surrounding residential area. The comments received at these meeting are attached as
Schedule "N".
5.0Other Department Comments
The comments received from the various departments and agencies circulated are summarized
in Schedule "G" and are also attached as Schedules "H" through "M".
Discussion:
6.0Planning Issues:
While the proposed additions to the hospital are relatively small, this hospital is located in the
midst of a single family residential neighbourhood and therefore careful consideration is
needed as to how the hospital can better fit within the residential community. In order to aid
this evaluation, principles of development were established by the planning staff and the
Working Committees. The principles are as follows:
(a)create/maintain residential character
(b)structure must not be visually intrusive to the surrounding neighbourhood
(c)the edge of the hospital property must be aesthetically appealing and well maintained
(d)traffic on surrounding roads must flow safely and efficiently
(e)reduce traffic and parking congestion throughout the neighbourhood
(f)internal vehicle circulation must be maximized to minimize external vehicle circulation
(g)emergency/visitor parking and entrance must be easily found and accessed
(h)efficient and effective emergency access must be maintained
As a result of recommendations from Working Group, the applicant has responded with
changes to the design and internal traffic circulation. The following sections discuss the issues
and how the principles were addressed.
6.1Built Form and Urban Design
There are three distinct key components of the proposal: the north addition, the parking
garage, and the future south addition. Each of these components is outlined below and reflect
the Urban Design Guidelines in Appendix "A".
6.1.1North Addition
The north addition (see Schedules "C" and "D2" - Site Plan and Elevations) is proposed to
house an expanded emergency room function. Due to the immediacy of the functions
occupying this portion of the hospital, the uses must be at grade and easily accessible. The
emergency visits to the hospital are projected to increase from approximately 40,000 per year
to 70,000 per year. The expansion is required to meet this increased load.
The addition requires the removal of an existing house at 15 Longview Drive which is now in
hospital ownership. The addition is proposed to be 14.25 metres in depth and have a 68 metre
width with a height of 2 storeys (6.5 metres above grade) . The first storey is below the
established grade which reduces the visual impact of the addition.
The residents' concerns were that the north addition was too close to the house at 63 Pelmo
Crescent which remains in private ownership. The addition is proposed to have a setback of
6.5 metres and a maximum height of 6.5 metres measured from the northeast corner of the
proposed addition which is the closest point to the existing house at 63 Pelmo Crescent.
Shadow diagrams were done which show there is not a significant shadow impact on the
house. The proposed addition maintains a similar setback from the residential property line as
specified in the existing zoning by-law (20 feet - 6.1 metres).
The location and size of the north addition is appropriate provided a high level of urban design
and landscaping are achieved as part of the expansion.
6.1.2Future South Addition
The south addition was proposed to contain an expansion of the existing mental health wing
that is currently located at the south edge of the hospital. However, since the time of the
original proposal, the hospital has determined that the these facilities can be incorporated at
the Finch site. The south addition proposal would still be appropriate if required in the future
using the design principles of maintaining the residential character of the area and not being
visually intrusive.
The south addition would extend to align with the adjacent houses on Church Street. The
height of 11 metres meets the bylaw requirement in the former City of York (See Schedule
"C" and "D1").
The original application had large institutional windows and strong horizontal lines. Revisions
have been made to the facade design which include a sloped roof and vertical partitions which
are similar to the residential lot widths. This would render the facade more in keeping with the
residential streetscape.
6.1.3Parking
The following table 6.1.3 summarizes the existing and proposed parking on site.
Table 6.1.3: Parking