March 8, 1999

To:Works & Utilities Committee

From:Commissioner of Works & Emergency Services

Subject:Additional Expenditures for Extra Work

On Capital projects Currently in Progress

Purpose:

To obtain Council authority to negotiate and authorize additional expenditures for the performance of necessary additional work on various contracts within the Water and Wastewater Services Division as outlined in this report.

Funding Sources:

Funds are available in the approved 1999-2003 Water and Wastewater Services Division Capital Accounts for each contract outlined in this report.

Recommendations:

It is recommended that:

(1)additional expenditures in the amount of $307,141.80 including Goods and Services Tax be authorized for the performance of necessary additional work on Water and Wastewater contracts, as described herein and in accordance with the estimates listed in Appendix B attached; and

(2)the appropriate City officials be authorized to take the necessary action to give effect thereto.

Background:

At its meeting of January 6, 1998 City of Toronto Council enacted By-law No. 7-1998, Interim Financial Control By-law, which repealed former Metro By-law No. 146-90. As the new By-law contains no provision to exceed the awarded contract value, as confirmed by the City's Legal Division, the Department has effectively lost its ability to authorize the unforeseen and necessary additional work that may arise during construction of capital projects. This is particularly problematic given that the majority of capital construction performed by this Department is tendered on a firm, lump sum basis. For contracts recently tendered, since confirmation of the repeal of former Metro By-law No. 146-90, we have been providing, on an interim basis, a general contingency allowance for possible extra work into the Schedule of Prices for Alterations, Extras, and Deductions for incorporation into the total lump sum tender price. In the case of the contracts identified herein, however, no such general contingency was added, as we believed it was still available through former Metro By-law No. 146-90.

At the time of award and/or contract tendering, in accordance with former Metro By-law No. 146-90, as amended, a Department Head had authority to approve additional expenditures on a commitment in accordance with the By-law up to an amount equal to ten percent of the commitment. As such, under the former Metro By-law a further ten percent of the awarded contract amount for each of the contracts identified herein would have been available for required extra work on each contract.

Comments and Justification:

Shown in Appendix A is a listing of contracts requiring the performance and/or payment of approved extra work. In all of the contracts, additional information and unexpected circumstances have arisen during construction, which have necessitated changes to the original tendered scope of work. To ensure continuity with respect to liability and warranty issues under the contracts, these changes must be implemented by the issuance of extra work orders. In some of the contracts, staff of the Department and/or our consultants have identified changes to the design of the original contract which are now advisable to be performed to conform to changed regulatory code requirements or operating procedures, and which should be implemented to ensure construction of the best possible finished product.

Appendix B identifies as of March 1, 1999, the extra work necessary to be performed for each of the contracts described in Appendix A along with their corresponding costs.

The total value of the extra work required as a percentage of the overall value of the contracts is equivalent to 0.57%.

Conclusion:

The additional expenditures required for extra work in the amount of $307,141.80 including GST applicable to various contracts are summarized in Appendix B attached. This additional work is necessary to either meet regulatory code requirements and/or ensure construction of the best possible product.

Contact Names and Telephone Numbers:

Pagnanelli, P.Eng.A.F. Piccolo, P.Eng.

Manager, Plant & Facility ConstructionSenior Project Engineer

Engineering Services-Works Facilities & StructuresEngineering Services-Works Facilities & Structures

Technical Services DivisionTechnical Services Division

Telephone No. (416) 392-8245Telephone No. 392-8853

T.G. Denes, P.Eng.B.H. Gutteridge

Executive DirectorCommissioner of Works and Emergency Services

Technical Services

APPENDIX A

WATER AND WASTEWATER SERVICES DIVISION

CAPITAL CONTRACTS REQUIRING THE PERFORMANCE

AND/OR PAYMENT OF APPROVED EXTRA WORK

Capital

Acct. No.

Contract No. Description Authority re

Contract Award

Awarded

Contract Amount

Incl. GST

Date of Order to

Commence Contract Work

Water Supply Contracts:

WS 352

WS-3-96 Construction of 2100 mm water main from Finch Avenue East and Tiffield Road to McNicoll Avenue and Middlefield Road EPS Report No. 12b, Clause No. 14, adopted by Council on September 25, 1996 $4,663,663.00

to Clearway Construction Inc.

October 7, 1996

Water Pollution Control Contracts:

WP096

WP115

WP115

WP115

WP115

WPC-7-96

WPC-12-94

WPC-2-97

WPC-9-97

WPC-11-97

Ventilation upgrade of the sludge treatment building at the Highland Creek Treatment Plant

Upgrade of the screening and south grit facilities at the Humber Treatment Plant

Construction of sludge digestion tanks Nos. 9 and 10 at the Humber Treatment Plant

Upgrade of the south plant primary sedimentation tanks at the Humber Treatment Plant

Installation of previously purchased new gas engines and air blowers for the cogeneration project at the Humber Treatment Plant

EPS Report No. 19, Clause No. 9(f), adopted by Council on November 20, 1996

EPS Report No. 12, Clause No. 28, adopted by Council on January 9, 1995

EPS Report No. 7, Clause No. 12(c), adopted by Council on May 20, 1997

EPS Report No. 12, Clause No. 15, adopted by Council on September 8, 1997

WU Report No. 4, Clause No. 3, adopted by Council on May 13, 1998

$1,396,000.00 to

W.A. Stephenson Mechanical Contractors Limited

$12,850,000.00 to Bennett Mechanical Installations Ltd.

$13,640,000.00 to Granville Constructors Ltd.

$4,460,000.00

to Carosi Construction Limited

$16,798,000.00 to Comstock Canada Ltd.

October 17, 1997

February 7, 1995

July 10, 1997

November 17, 1997

July 14, 1998

EPS : Environment and Public Space Committee

WU : Works and Utilities Committee

APPENDIX B

Request for Authorization of Additional Expenditures

For Extra work on Water and Wastewater

Contracts Identified in Appendix A APPENDIX B (Cont'd.)

Request for Authorization of Additional Expenditures

For Extra work on Water and Wastewater

Contracts Identified in Appendix A

Contract No.

WPC-2-97

WPC-2-97

WPC-2-97

WPC-2-97

WPC-11-97

WPC-11-97

WPC-11-97

WPC-11-97

WPC-11-97

Extra Work Description/Justification

Upgrade computer and software control to current industry standards for monitoring hydro usage throughout the Plant

New potable water meter for monitoring water usage in digester galleries

Cleaning of existing digester to permit required maintenance/upgrade for overall efficient operation of digester

Improve efficiency of electrical power usage by utilizing photocells for control of lighting in digester galleries

Subtotal re extra work for WPC-2-97

Construct concrete encased electrical duct bank to provide Toronto Hydro the ability to remotely control their hydro feed to the Plant during operation of the cogen engines

Replace deteriorated/outdated electrical cables unexpectedly found in walls and ceiling of Engine Room in order to meet current electrical codes.

Acoustical modifications required to ensure noise rating in administration areas of the Plant meet code requirements

Relocation of existing miscellaneous Plant utilities to allow the installation of ventilation requirements for the cogen engines

Switchgear, control relay and software upgrades as requested by Toronto and Ontario Hydro to meet interface requirements between the cogen generators and hydro's distribution system

Subtotal re extra work for WPC-11-97

Total re extra work for all contracts noted

Terms

Lump Sum

Est.

Lump sum

Est.

Est.

Est.

Est.

Est.

Est.

Authorized

Additional Amount

$

6,100.00

16,050.00

61,000.00

2,000.00

85,150.00

50,000.00

10,000.00

10,000.00

40,000.00

30,000.00

140,000.00

$307,141.80

 

   
Please note that council and committee documents are provided electronically for information only and do not retain the exact structure of the original versions. For example, charts, images and tables may be difficult to read. As such, readers should verify information before acting on it. All council documents are available from the City Clerk's office. Please e-mail clerk@toronto.ca.

 