March 8, 1999
To:Works & Utilities Committee
From:Commissioner of Works & Emergency Services
Subject:Additional Expenditures for Extra Work
On Capital projects Currently in Progress
Purpose:
To obtain Council authority to negotiate and authorize additional expenditures for the
performance of necessary additional work on various contracts within the Water and
Wastewater Services Division as outlined in this report.
Funding Sources:
Funds are available in the approved 1999-2003 Water and Wastewater Services Division
Capital Accounts for each contract outlined in this report.
Recommendations:
It is recommended that:
(1)additional expenditures in the amount of $307,141.80 including Goods and Services Tax
be authorized for the performance of necessary additional work on Water and Wastewater
contracts, as described herein and in accordance with the estimates listed in Appendix B
attached; and
(2)the appropriate City officials be authorized to take the necessary action to give effect
thereto.
Background:
At its meeting of January 6, 1998 City of Toronto Council enacted By-law No. 7-1998,
Interim Financial Control By-law, which repealed former Metro By-law No. 146-90. As the
new By-law contains no provision to exceed the awarded contract value, as confirmed by the
City's Legal Division, the Department has effectively lost its ability to authorize the
unforeseen and necessary additional work that may arise during construction of capital
projects. This is particularly problematic given that the majority of capital construction
performed by this Department is tendered on a firm, lump sum basis. For contracts recently
tendered, since confirmation of the repeal of former Metro By-law No. 146-90, we have been
providing, on an interim basis, a general contingency allowance for possible extra work into
the Schedule of Prices for Alterations, Extras, and Deductions for incorporation into the total
lump sum tender price. In the case of the contracts identified herein, however, no such general
contingency was added, as we believed it was still available through former Metro By-law No.
146-90.
At the time of award and/or contract tendering, in accordance with former Metro By-law No.
146-90, as amended, a Department Head had authority to approve additional expenditures on
a commitment in accordance with the By-law up to an amount equal to ten percent of the
commitment. As such, under the former Metro By-law a further ten percent of the awarded
contract amount for each of the contracts identified herein would have been available for
required extra work on each contract.
Comments and Justification:
Shown in Appendix A is a listing of contracts requiring the performance and/or payment of
approved extra work. In all of the contracts, additional information and unexpected
circumstances have arisen during construction, which have necessitated changes to the
original tendered scope of work. To ensure continuity with respect to liability and warranty
issues under the contracts, these changes must be implemented by the issuance of extra work
orders. In some of the contracts, staff of the Department and/or our consultants have identified
changes to the design of the original contract which are now advisable to be performed to
conform to changed regulatory code requirements or operating procedures, and which should
be implemented to ensure construction of the best possible finished product.
Appendix B identifies as of March 1, 1999, the extra work necessary to be performed for each
of the contracts described in Appendix A along with their corresponding costs.
The total value of the extra work required as a percentage of the overall value of the contracts
is equivalent to 0.57%.
Conclusion:
The additional expenditures required for extra work in the amount of $307,141.80 including
GST applicable to various contracts are summarized in Appendix B attached. This additional
work is necessary to either meet regulatory code requirements and/or ensure construction of
the best possible product.
Contact Names and Telephone Numbers:
Pagnanelli, P.Eng.A.F. Piccolo, P.Eng.
Manager, Plant & Facility ConstructionSenior Project Engineer
Engineering Services-Works Facilities & StructuresEngineering Services-Works Facilities
& Structures
Technical Services DivisionTechnical Services Division
Telephone No. (416) 392-8245Telephone No. 392-8853
T.G. Denes, P.Eng.B.H. Gutteridge
Executive DirectorCommissioner of Works and Emergency Services
Technical Services
APPENDIX A
WATER AND WASTEWATER SERVICES DIVISION
CAPITAL CONTRACTS REQUIRING THE PERFORMANCE
AND/OR PAYMENT OF APPROVED EXTRA WORK
Capital
Acct. No. |
|
Contract No. |
|
Description |
|
Authority re
Contract Award |
|
Awarded
Contract Amount
Incl. GST |
|
Date of Order to
Commence Contract Work
|
Water Supply Contracts:
WS 352 |
|
WS-3-96 |
|
Construction of 2100 mm water
main from Finch Avenue East
and Tiffield Road to McNicoll
Avenue and Middlefield Road |
|
EPS Report No. 12b, Clause
No. 14, adopted by Council on
September 25, 1996 |
|
$4,663,663.00
to Clearway Construction Inc. |
|
October 7, 1996
|
Water Pollution Control Contracts:
WP096
WP115
WP115
WP115
WP115
|
|
WPC-7-96
WPC-12-94
WPC-2-97
WPC-9-97
WPC-11-97 |
|
Ventilation upgrade of the
sludge treatment building at the
Highland Creek Treatment Plant
Upgrade of the screening and
south grit facilities at the
Humber Treatment Plant
Construction of sludge digestion
tanks Nos. 9 and 10 at the
Humber Treatment Plant
Upgrade of the south plant
primary sedimentation tanks at
the Humber Treatment Plant
Installation of previously
purchased new gas engines and
air blowers for the cogeneration
project at the Humber
Treatment Plant |
|
EPS Report No. 19, Clause No.
9(f), adopted by Council on
November 20, 1996
EPS Report No. 12, Clause No.
28, adopted by Council on
January 9, 1995
EPS Report No. 7, Clause No.
12(c), adopted by Council on
May 20, 1997
EPS Report No. 12, Clause No.
15, adopted by Council on
September 8, 1997
WU Report No. 4, Clause No. 3,
adopted by Council on May 13,
1998 |
|
$1,396,000.00 to
W.A. Stephenson Mechanical
Contractors Limited
$12,850,000.00 to Bennett
Mechanical Installations Ltd.
$13,640,000.00 to Granville
Constructors Ltd.
$4,460,000.00
to Carosi Construction Limited
$16,798,000.00 to Comstock
Canada Ltd. |
|
October 17, 1997
February 7, 1995
July 10, 1997
November 17, 1997
July 14, 1998
|
EPS : Environment and Public Space Committee
WU : Works and Utilities Committee
APPENDIX B
Request for Authorization of Additional Expenditures
For Extra work on Water and Wastewater
Contracts Identified in Appendix A APPENDIX B (Cont'd.)
Request for Authorization of Additional Expenditures
For Extra work on Water and Wastewater
Contracts Identified in Appendix A