Anaerobic Digesters and Boiler Building Extension

at the Highland Creek Treatment Plant -

Contract No. MW9804WP, Tender No. 152-98 (East Toronto)

The Works and Utilities Committee recommends the adoption of the following report (March11, 1999) from the Commissioner of Works and Emergency Services:

Purpose:

The purpose of this report is to advise the results of the tender issued for the construction of Anaerobic Digesters and Boiler Building Extension at the Highland Creek Treatment Plant, in accordance with specifications of the Works and Emergency Services Department, and to request the authority to issue a contract to the recommended bidder.

Source of Funds:

This project is included in the approved 1999-2003 Water and Wastewater Services Division Capital Works Program, and funds are available in the Highland Creek, Stage IV capital account.

Recommendation:

It is recommended that Contract No. MW9804WP for the construction of Anaerobic Digesters and Boiler Building Extension at the Highland Creek Treatment Plant be awarded to the lowest tenderer, Bondfield Construction Company Limited, for the Total Lump Sum Price of $25,884,000.00, including all taxes and charges.

Background:

On February 19, 1999, the Bid Committee opened the following tenders for Contract No.MW9804WP for the construction of Anaerobic Digesters and Boiler Building Extension at the Highland Creek Treatment Plant:

Tenderer

Total Lump

Sum Price

$

Bondfield Construction Company Limited 25,884,000.00
Granville Construction (1999) Ltd. 26,700,000.00
Kenaidan Contracting Ltd. 27,225,000.00
Walter Construction (Canada) Ltd. 27,770,000.00
Lisgar Construction Company,
a Division of United Shelters Limited 27,948,000.00

Comments:

Representatives of the Works and Emergency Services Department and the project consultants having met with the lowest tenderer, Bondfield Construction Company Limited (Bondfield), to review the contract, are satisfied that this company fully understands the contractual requirements and has the capability to carry out the work as specified. Currently, Bondfield is successfully performing similar work for this Department.

The lowest tenderer, Bondfield, made arithmetical errors in the Schedule of Prices contained in the contract specifications and, as per the terms of the tender documents, the total Lump Sum has been adjusted accordingly. Purchasing and Materials Management has verified that the mathematical errors are correct. This necessary correction does not affect the ranking of the tenders.

The Manager, Fair Wage and Labour Trades Office, has reported favourably on the firm recommended and its proposed subcontractors.

Conclusion:

This report requests authority to issue a contract for the construction of anaerobic digesters and boiler building extension at the Highland Creek Treatment Plant to the lowest tenderer, Bondfield Construction Company Limited, in the corrected Total Lump Sum Price of $25,884,000.00.

Contact Name:Contact Name:

Mr. A. F. Piccolo, P.Eng., Mr. L.A. Pagano

Senior Project Engineer,Director

Technical Services DivisionPurchasing and Materials Management

Telephone No.: (416) 392-8853Telephone No.: (416) 392-7312

 

   
Please note that council and committee documents are provided electronically for information only and do not retain the exact structure of the original versions. For example, charts, images and tables may be difficult to read. As such, readers should verify information before acting on it. All council documents are available from the City Clerk's office. Please e-mail clerk@toronto.ca.

 