Transmittal of Evaluation of the
Leaside Neighbourhood Branch Library -
Capital Budget Project
The Strategic Policies and Priorities Committee recommends the adoption of the
Recommendation of the Budget Committee embodied in the following communication
(May26,1999) from the City Clerk:
Recommendation:
The Budget Committee on May 25, 1999, recommended to the Strategic Policies and
Priorities Committee, and Council, the adoption of the report (May 10, 1999) from the City
Librarian.
The Budget Committee reports, for the information of the Strategic Policies and Priorities
Committee and Council, having requested the City Librarian to report back to the Budget
Advisory Committee during the year 2000 Capital Budget process outlining cost savings due
to efficiencies in staffing and maintenance.
Background:
The Budget Committee had before it a report (May 10, 1999) from the City Librarian advising
that the Toronto Public Library Board on May 3, 1999, adopted the Leaside Neighbourhood
Branch Library report from the City Librarian, wherein it is recommended that:
(1)the Board adopt Option (2) as outlined in the Parkin Group report as the preferred option
and convey this to the Budget Committee in May 1999, as requested; and
(2)the Board proceed to working drawings for the new building in 1999, funded by
expending the balance of the 1999 capital allotment for the Leaside project estimated at
$240,000.00.
--------
(Report dated May 10, 1999, addressed to the
Budget Committee from the City Librarian)
Attached for consideration of the Budget Committee at its meeting on May 25, 1999, is the
Leaside Neighbourhood Branch Library report (May 3, 1999) from the City Librarian, which
was adopted by the Toronto Public Library Board at its meeting on May3, 1999, wherein it is
recommended that:
(1)the Board adopt Option (2) as outlined in the Parkin Group report (April 26, 1999) as the
preferred option and convey this to the Budget Committee in May 1999, as requested; and
(2)the Board proceed to working drawings for the new building in 1999, funded by
expending the balance of the 1999 capital allotment for the Leaside project estimated at
$240,000.00.
The report is provided in response to the Budget Committee's request for an overall
evaluation of the Leaside Public Library facility.
Project Cost Estimates (GST is excluded from all amounts)
Option 1 - Upgrade Existing Building
-Renovations to existing building including$1,362,409.00
construction of new elevator, barrier free
washroom and enlarged main entrance
-Professional fees and associated costs (10 percent)136,000.00
-Furniture, fixtures and equipment175,000.00
-Building permit fees at $12.00 per square metre11,160.00
Total Project Cost Estimate (renovation)$1,684,569.00
Option 2 - New Building
-Construction of new 9,000 square feet library$1,477,211.00
including demolition of existing building
-Professional fees and associated costs (10 percent)147,720.00
-Furniture, fixtures and equipment175,000.00
-Building permit fees at $12.00 per square metre10,800.00
Total Project Cost Estimate$1,810,731.00
(new construction)
--------
(Report dated May 3, 1999, addressed to the
Toronto Public Library Board from the City Librarian)
Purpose:
To present the results of the Feasibility Study to determine whether to retrofit or reconstruct
Leaside Neighbourhood Library.
Funding Sources, Financial Implications and Impact Statement:
Funding for the project was provided in the 1998 Capital Budget and further funds were
approved pending the City Librarian's report to the Budget Committee on an overall
evaluation of the Leaside Public Library facility.
Recommendations:
It is recommended that the Toronto Public Library Board:
(1)adopt Option (2) as outlined in the Parkin Group report as the preferred option and
convey this to the Budget Committee in May 1999, as requested; and
(2)proceed to working drawings for the new building in 1999, funded by expending the
balance of the 1999 capital allotment for the Leaside project estimated at $240,000.00.
Comments and/or Discussion and/or Justification:
In 1998, a capital budget of $235,000.00 was approved for the Leaside Neighbourhood
Library to provide barrier-free access to the building (elevators, washroom, automatic doors).
Upon undertaking the work for this project, difficulties associated with high water table
escalated the cost to $600,000.00.
As a result of the 1999 capital budget discussions, Council directed that the increase in
expenditures of $65,000.00 in 1999 and $300,000.00 in 2000 required for the Leaside
Accessibility project be approved pending the City Librarian's report to the Budget Committee
on an overall evaluation of the Leaside Public Library facility.
Overall concern was expressed about the $600,000.00 cost of providing barrier-free access
when the whole facility could be completely replaced at two-to-three times the cost. The
expenditure was considered not good value for money, particularly in view of the fact that
other building deficiencies would remain.
The Parkin Group was employed by Toronto Public Library to undertake an overall evaluation
of the Leaside Public Library.
The results of the Parkin Group study are two options, with costing provided for each. Option
(1) is for renovating the existing facility at just under $1.7 million. Option (2), the
recommended option, is for demolition of the existing facility and construction of a new
facility at $1.8 million.
In assessing both options it is important to note that the renovation program to upgrade the
existing facility in Option (1) does not address a number of significant deficiencies, and there
is no guarantee as to the longevity of the building or equipment:
(a)An elevator is required in the retrofit option. In addition, the elevator doors will open
directly into the auditorium; there is no space for a vestibule or lobby area on the lower level.
(b)While the circulation desk service area will be enhanced with a renovation, site lines into
the adult and children's areas will remain problematic. It is anticipated that current staffing
levels at Leaside will remain unchanged. For those times when it is not possible to staff the
adult or children's desks, the circulation desk staff will continue to be responsible for service
in those areas and will have difficulty monitoring these activities.
(c)The stairway to the lower level is very steep. An investigation was undertaken to rebuild
the existing stairway that would see a decrease in the slope as well as eliminate the 90 degree
turn at the landing. However, such a significant redesign of the existing facility would impact
on space allocation (a minimum of eight feet would be lost in the auditorium), and increase
costs significantly. In the retrofit option, there is no change to the existing stair.
(d)There will continue to be inefficient use of space. There is no opportunity to rationalize
space allocation for collection and services; e.g., the proportion of adult and children's areas
and the opportunity to respond to local needs such as the addition of a local history collections
area.
(e)Energy efficiency of the building could be improved with the installation of insulation
and a vapour barrier on perimeter walls, but this upgrade may cause deterioration of the
exterior wall brickwork.
A significant investment of almost $1.7 million results in some important improvements to the
Leaside Library. However, the Library Board is left with a facility built in 1950 where a
number of deficiencies continue, and the life expectancy of the building and equipment remain
uncertain.
Contact Names:
Ms. Ann Eddie, Director, Administration, 393-7091, Mr. Bruce Barnett, Senior Manager,
Facilities, 395-5880.
(A copy of the Leaside Branch Feasibility Study referred to in the foregoing report was
forwarded to each Member of Council with the agenda of the Budget Committee meeting of
May 25, 1999, and a copy thereof is also on file in the office of the City Clerk.)