Narrowing of Pavement - Merton Street

near Yonge Street (North Toronto)

The Toronto Community Council recommends that a by-law in the form of the draft by-law be enacted, and that the necessary Bills be introduced in Council to give effect thereto.

The Toronto Community Council reports, for the information of Council, that pursuant to Clause 38 of Report No. 9 of the Toronto Community Council, headed "Installation of Road Narrowing at Pedestrian Crossover - Merton Street in the vicinity of Premises No. 71, which was adopted without amendment by City Council on July 6, 7 and 8, 1999, notice with respect to the proposed enactment of the draft by-law was advertised in a daily newspaper on August 23, August 30, September 7 and September 13, 1999, and no one addressed the Toronto Community Council.

The Toronto Community Council submits the following Draft By-law from the City Solicitor:

Authority:Toronto Community Council Report No. 9, Clause No. 38

as adopted by Council on July 6, 7 and 8, 1999

Enacted by Council:

CITY OF TORONTO

Bill No.

BY-LAW No.

To further amend former City of Toronto By-law No. 602-89, being "A By-law To authorize the construction, widening, narrowing, alteration and repair of sidewalks, pavements and curbs at various locations", respecting the alteration of Merton Street near Yonge Street by narrowing the pavement.

WHEREAS notice of a proposed By-law regarding the proposed alteration was published in a daily newspaper on , 1999 and interested persons were given an opportunity to be heard at a public meeting held on ,1999 and it is appropriate to amend the by-law to permit the alteration;

The Council of the City of Toronto HEREBY ENACTS as follows:

1.Former City of Toronto By-law No. 602-89, being "A By-law To authorize the construction, widening, narrowing, alteration and repair of sidewalks, pavements and curbs at various locations", is amended:

(1)by inserting in Columns 1, 2, 3, 4, 5 and 6, respectively, of Schedule "B-3" (Pavement Narrowing) the following:

(Column 1

Side or Street)

(Column 2

Location)

(Column 3

Width)

(Column 4

From)

(Column 5

To)

(Column 6 Drawing No./Date)
Merton

Street

(near premises

No. 71 Merton Street)

 

from: 11.3m to: 9.5m - 11.3m

140m East of Yonge Street 20m further East 421F-5375 dated

May, 1999,

revised

June, 1999

 

ENACTED AND PASSED this day of , A.D. 1999.

MayorCity Clerk

 The Toronto Community Council also submits the following Clause 38 of Toronto Community Council Report No. 9, titled "Installation of Road Narrowing at Pedestrian Crossover - Merton Street in the vicinity of Premises No. 71 (North Toronto", which was adopted by City Council at its meeting held on July 6, 7 and 8, 1999:

(City Council on July 6, 7 and 8, 1999, adopted this Clause, without amendment.)

The Toronto Community Council recommends the adoption of the following report (June 9, 1999) from the Director, Transportation Services District 1, Works and Emergency Services:

Purpose:

To channelize through traffic movements and provide a measure of protection for elderly pedestrians crossing at the pedestrian crossover opposite Premises No. 71 Merton Street.

Funding Sources, Financial Implications and Impact Statement:

The estimated cost of this work is in the order of $6,000.00, which can be accommodated in the Transportation Services Division 1999 Budget.

Recommendations:

(1)That approval be given to narrow the pavement width on Merton Street, from approximately 140 m east of Yonge Street to a point 20 m further east thereof, in the vicinity of Premises No. 71 Merton Street on either side of the existing pedestrian crossover, for the purpose of channelizing through traffic movements and providing a measure of pedestrian protection, described as follows:

"The narrowing of the pavement from a width of 11.3 metres to a width varying from 9.5 metres to 11.3 metres on both sides of the pedestrian crossover in the vicinity of Premises No. 71 MERTON STREET, from a point approximately 140 m east of Yonge Street to a point 20 m further east thereof, as shown on the attached print of Drawing No. 421F-5375 dated May 1999, Revised June 1999";

(2)That parking be prohibited at anytime on the north side of Merton Street from a point 160 metres east of Yonge Street to a point 40 metres further east and that the three parking meter spaces within this area be removed; and

(3)That the appropriate City Officials be authorized to take whatever action is necessary to implement the foregoing, including the introduction in Council of any Bills required.

Comments:

At the request of Councillor Michael Walker, Transportation Services' staff investigated the feasibility of narrowing the pavement in front of Premises No. 71 Merton Street (the Janet Magee Manor senior citizens' facility) at the existing pedestrian crossover in order to enhance pedestrian safety, especially for seniors residing at this address. Following a public meeting held on Friday, May 28, 1999, at Premises No. 71 Merton Street, the residents in attendance indicated their support with the proposed roadway narrowing.

Merton Street is a collector/residential roadway with two-way traffic operation, a pavement width of 11.3 metres and a maximum speed limit of 40 kilometres per hour. Metered parking is available on the north side of the street for a maximum period of one hour from 8:00 a.m. to 6:00 p.m., Monday to Saturday and parking is otherwise permitted for a maximum period of three hours. Parking on the south side of the street is prohibited at anytime.

A review of available speed and volume data has revealed that the average daily speed on the section of Merton Street between Mount Pleasant Road and Yonge Street was approximately 43 kilometres per hour and the operating speed or 85th percentile speed (the speed at which 85 percent of the traffic volume operates at or below) was 52 kilometres per hour. Incidents of excessive speeding (vehicles traveling in excess of 55 kilometres per hour) represented roughly 11 percent of the combined average daily traffic volume (6,388 vehicles).

A check of Departmental collision data from January 1996 to December 1998, revealed that there were 2 collisions in the vicinity of the pedestrian crossover (PXO) near Premises No. 71 Merton Street. Both collisions were rear-end collisions involving vehicles that were stopped or in the process of stopping at the crossover. Neither of these collisions involved pedestrians.

A site inspection recently conducted by Transportation Services staff confirmed that the overhead illuminated sign is clearly visible by motorists approaching the crosswalk from either Yonge Street or Mt. Pleasant Road. If motorists do not stop, it is not due to lack of visibility, but because they choose not to stop, or alternatively, the pedestrians may not have actuated the overhead flashing beacon. It was also noted that the pavement markings at the crosswalk are visible, however, they are somewhat faded. Staff will arrange to have these pavement markings repainted as soon as practicable. Also, to further enhance the visibility of the PXO, staff will consider installing an additional overhead electrical fixture to augment the existing fixture currently in place. This will result in increased lighting levels at the PXO and increased visibility of the PXO to approaching motorists.

Prior to assessing the feasibility of narrowing the pavement at the subject PXO on Merton Street, Transportation Services staff observed the operating conditions at the PXO on Davisville Avenue between Yonge Street and Mt. Pleasant Road, where the pavement was narrowed by the placement of precast concrete islands in 1997. During the course of this assessment, it was noted that a number of motorists failed to stop for pedestrians waiting to cross the street, however, with less distance to cross the roadway, pedestrians, and in particular seniors, are exposed to traffic for a shorter period of time.

While narrowing the roadway at the subject PXO on Merton Street is technically feasible, it would require the removal of three parking meter stalls to accommodate the requisite pavement marking taper on the north side of Merton Street, immediately east of the crossover. The proximity of the crossover to existing driveway ramps precludes the possibility of narrowing the roadway at the west side of the crossover on the north side of Merton Street and at the east side of the crossover on the south side of Merton Street.

The narrowing of Merton Street as described above would constitute an alteration to the public highway pursuant to the provisions of the Municipal Act. Accordingly, the alteration of the pavement configuration must be advertised in a local newspaper and subsequently be subject to a public hearing. The project would be pre-approved in accordance with Schedule "A" of the Class Environmental Assessment for Municipal Roads Projects.

Contact Name and Telephone Number:

Teresa Carmichael

Senior Traffic Investigator

392-7771

Insert Table/Map No. 1

Merton Street

 

   
Please note that council and committee documents are provided electronically for information only and do not retain the exact structure of the original versions. For example, charts, images and tables may be difficult to read. As such, readers should verify information before acting on it. All council documents are available from the City Clerk's office. Please e-mail clerk@toronto.ca.

 