A basketball court is coming to Dennis Flynn Park as part of the Parks and Recreation Facilities Master Plan. The design will include a new full-court basketball court, seating and pathways.

  • October 2021: Hire a design team
  • June 2022: Detailed design
  • July 2022: Hire a construction team
  • Fall 2022: Construction starts
  • Spring 2023: Construction complete

The timeline is subject to change.

Dennis Flynn Park is a 2.6-hectare park located at 370 The West Mall, in West Etobicoke. The park features a playground, three tennis courts and a large open field.

As part of the Parks and Recreation Facilities Master Plan (FMP), the City has reviewed Toronto’s existing basketball facilities to determine if improvements and/or new facilities are required in order to keep up with demand for the sport.

The new basketball court will be located south of the existing tennis courts, on the east side of the open field in the park.

Site Plan

An aerial site plan for the new basketball court coming to Dennis Flynn Park. From the bottom left to top right, it includes a player's bench along the south side of the court, a half court, picnic tables and benches along the south side of the court, a full court and picnic tables parallel to the existing tennis courts. A long concrete path is on either side of the basketball court and connects to The West Mall. Grass surrounds the basketball court area. The basketball court is shown in blue.