Share your thoughts on the features and equipment for the new playground in an online survey from May 23 to June 5, 2022.

The City is improving the playground in Perth Square Park. These improvements are part of an ongoing city-wide program to ensure playgrounds provide safe and accessible fun for many years to come!

Project Timeline

  • Spring 2022: Community engagement (online survey)
  • Spring/Summer 2022: Detailed design and hire a construction team
  • Fall 2022: Construction starts
  • Winter 2022: Construction complete, playground reopens

The timeline is subject to change.

Online Survey

May 23 to June 5, 2022

Take the online survey to share your thoughts on the features and equipment for the new playground. The design team will use the community feedback collected in the survey to develop a final playground design.

The results of the survey will also be posted on this page.

Sign Up for Updates

Sign Up Now

Sign up for updates related to the Perth Square Park Playground Improvement project or unsubscribe from the mailing list.

Perth Square Park Playground is located at 350 Perth Ave., near Dupont Street and Dundas Street West.

The playground currently includes:

  • One swing sets with:
    • Three swings for ages two to five
    • Three swings for ages six to 12
  • Two see-saws
  • A junior play structure
  • A senior play structure
  • Two spring toys
  • A carousel
  • A sandbox
  • Sand under all play areas

The playground will be redesigned using feedback from the community. The redesigned playground is proposed to include:

  • Playground equipment for ages two to 12
  • Additional seating
  • Engineered wood fibre playground surfacing
  • Accessible play equipment and an accessible pathway connecting to the playground area. This means that people of all abilities will be able to play at this playground.

Improvements will only be made in the general playground area. This will not include any new water or lighting features, or improvements to other areas of the park.