A new 2040m2 park is coming to 55 Isaac Devins Blvd. as a result of a residential development project near Weston Road and Sheppard Avenue West. The park design will be determined through community engagement and is proposed to include a playground, fitness equipment, shade features, water bottle filler, seating, pathways, new plants and a fence.

While we aim to provide fully accessible content, there is no text alternative available for some of the content on this site. If you require alternate formats or need assistance understanding our maps, drawings, or any other content, please contact Danielle Charlton at 437-775-7090.

  • June 2022: Hire a design team
  • November 2022: Community engagement
  • December 2022 to February 2023: Design development
  • Spring and Summer 2023: Detailed design
  • Summer 2023: Hire a construction team
  • Spring 2024: Construction starts
  • Summer 2024: Construction complete

The timeline is subject to change.

Sign Up for Updates

Sign Up Now

Sign up for updates related to the new parkette at 55 Isaac Devins Blvd. or unsubscribe from the mailing list.

April 2023

Public Meeting

On April 28, 2023, community members were invited to an in-person meeting at St. Basil-the-Great College School to learn more about the preferred design for the new park and share their feedback on various proposed park amenities. Meeting attendees were also able to speak with the project team and local Councillor to confirm opportunities for the new park and surrounding area.

Download the:

December 2022

Online Survey

From December 5 to December 19, 2022, a survey collected feedback on the proposed design options for the new park.

Download the survey summary.

An aerial site plan of the park showing the location of each feature and amenity within the park boundaries. From the bottom left corner to the top right corner, it includes a play structure near the south area of the park, a central sand with concrete curb and rock border adjacent to a concrete walkway connecting the east side and west side of the park, a fitness area at the top east side of the park. Trees line the perimeter of the south, east and west side of the park.

The design for the new park includes the following features:

  1. Open lawn with berms
  2. Perennial planting bed
  3. Tree planting
  4. Evergreen hedgerow
  5. Accessible picnic table with shade umbrella
  6. Picnic table with shade umbrella
  7. Water fountain/bottle filler
  8. Three metre wide concrete walkway
  9. Bench
  10. Playground equipment area
  11. Sand area with concrete curb and rock border
  12. Fitness area
  13. 1.2 metre high metal fence
  14. Waste/recycling bins

A rendering of the playground design with equipment shown in blue and purple. From the bottom left corner to top right corner it includes a senior climbing structure, a combined senior and junior play structure beside various stand-alone features, like a teeter totter and play panels. To the far right of the play area is a swing set.

The design for the new playground includes the following features:

  1. Senior climber with monkey bars
  2. Combined senior and junior play structure
  3. Play panels
  4. Accessible sand table
  5. Teeter totter
  6. Twist climber
  7. Spinner
  8. Rocking nest (calming seat)
  9. Swing set with two junior swings, two senior swings and one group swing

A site plan for the fitness area with fitness equipment. From the bottom left to top right it includes two information panels at the edge of the fitness area, Parallel bars next to a long bench and pull up and push up bars.

The design for the new fitness area includes the following features:

  1. Long bench
  2. Parallel bars
  3. Information panel
  4. Pull up and push up bars