This project is the final of four mixed-use buildings within the Bayside Toronto Community. It includes 241 luxury residential condominium suites with a community centre and retail at grade. The building has achieved Toronto Green Standard Version 2 Tier 2 requirements and LEED® Platinum certification. The building’s sustainability elements promote occupant well-being while maximizing energy and water efficiency.
A total of 272 long-term and 32 short-term bicycle parking spaces are provided outdoors and inside the underground garage.
20 parking spaces are equipped with electric vehicle charging stations. 130 additional parking spaces are equipped with EV-rough ins for future installation of charging stations.
The green roofs feature drought tolerant and native plant species, which reduce the need for irrigation at its source and promote biodiversity.
Rainwater is captured from rooftops and terraces and is stored in the underground cistern before it is fed through a high-efficiency irrigation system. This is a 50 per cent reduction in water used for irrigation. Reusing rainwater for irrigation eliminates the need for potable water.
Low-flow plumbing fixtures were selected for installation to reduce potable water consumption by 37 per cent compared to a building with conventional plumbing fixtures. This amounts to almost 20 million litres of water saved annually!
A waste management plan was implemented throughout construction, which successfully diverted 85.25 per cent of all construction waste from landfill. Most of the waste generated on site during construction was recycled.
Each suite is equipped with an energy recovery ventilator (ERV). The ERV allows the delivery of fresh outdoor air directly into the suite, while recovering 79 per cent of the energy of outgoing air. Waste energy from stale air is used to warm up incoming air in winter and cool down incoming air in summer while recovering energy from the departing airstream and ensuring better indoor air quality for residents.
Low-VOC adhesives, sealants, paints, coatings, and flooring products were applied inside the building to reduce off-gassing and maintain occupant well-being.
Each floor is equipped with a sealed garbage room with a dedicated chute for recycling and a bi-sorter, allowing residents to easily dispose of waste and organics.
Each suite is equipped with a programmable digital thermostat, which residents can use to control temperature and airflow in the suite. The thermostat allows homeowners to set the temperature to their comfort level when at home and adjust for increased energy savings when they are away.
Each suite is equipped with sub-meters measuring electricity, hot and cold-water consumption.
Tridel / Hines
4800 Dufferin Street
Toronto, ON M3H 5S9
3XN
Kanonbådsvej 8
DK-1437 Copenhagen K
T +45 7026 2648
Kirkor Architects & Planners
20 Martin Ross Avenue
Toronto, ON M3J 2K8
EQ Building Performance Inc.
20 Floral Parkway
Concord, ON L4K 4R1
MCW Consultants Ltd.
207 Queens Quay West, Suite 615
Toronto, ON M5J 1A7