The City is proceeding with improvements to Scarborough Arena Gardens as part of a state-of-good-repair project to address the existing roof structure.

  • 2021: Hire a consultant and preliminary schematic design
  • 2022: Develop schematic and detailed design
  • Spring 2023: Hire a construction team
  • Summer 2023: Construction starts
  • Spring 2025: Construction complete, facility reopens

The timeline is subject to change.

While we aim to provide fully accessible content, there is no text alternative available for some of the content on this site. If you require alternate formats or need assistance understanding our maps, drawings, or any other content, please contact Sherry Huang at 416-395-7910.

March 2024

Excavation work continues alongside the installation of the footing and building foundation.

A photo of the construction site showing two excavators removing dirt from the site, which is mostly flat. The flat area of the site had low long concrete foundation walls spanning the length of the entire photo.

February 2024

Excavation work continues alongside the installation of the footing and building foundation.

A photo of the construction site showing a below-grade excavation with tall, enclosed wood framing on top of a concrete foundation in the foreground. In the background is a large mound of soil from the site excavation.

January 2024

Construction Progress Update

Demolition is complete and excavation work continues alongside the installation of the building foundation.

A photo of the construction site showing a below-grade excavation with some wood framing in the foreground. In the background is a crane excavating the site.

December 2023

Construction Progress Update

Demolition continues and is near completion with the removal of the existing building envelope and concrete slab.

A photo of the building exterior during construction, which shows two cranes demolishing the exterior of the building.

November 2023

Construction Progress Update

Construction continues with the demolition of the building envelope and interior of the building.

A photo of the building exterior during construction, which shows the intersecting steel beams along the demolished opening of the building from floor to ceiling.

October 2023

Construction Progress Update

Construction continues with the initial demolition of the building envelope (the building components that separate the indoors from the outdoors).

A photo of the building exterior during construction, which shows a red bulldozer and the exterior walls being demolished. Piles of concrete and materials are around the perimeter of the building.

September 2023

Construction Progress Update

Construction continues with initial demolition to remove existing materials at the interior and exterior of the building.

A photo of the building exterior during construction, which shows the adjacent parking lot in the foreground two lift machines working on the exterior walls.

August 2023

Construction Starts

In late August, construction started and the facility and parking lot surrounding the facility are closed to the public. The construction hoarding has been installed around the perimeter of the facility. Construction is anticipated to be completed in winter 2024.

A photo of the construction fencing around the parking lot and perimeter of Scarborough Gardens Arena taken in the evening.

Construction Update

As of early August, the detailed design and construction procurement for the arena improvements are complete. A contractor has been retained and will commence construction shortly. The parking lot surrounding the facility will be closed for the duration of the project.

Map showing areas temporarily closed due to construction, including the entire parking area south and west of the arena as well as the south entrance to the parking lot on Birchmount Road.

December 2022

The detailed design for the arena improvements is progressing in advance of construction procurement, which is anticipated to start in early 2023.

June 7, 2022

Virtual Public Meeting

The City hosted a meeting share information about the improvements coming to the facility. Approximately 18 community members were in attendance.

Download the:

December 23, 2021

The City has procured design services for the roof structure and additional potential improvements as part of the overall state-of-good-repair work.

The design phase is progressing and includes a roof structure replacement, state-of-good-repair improvements and accessibility and energy upgrades.

December 21, 2020

After the need for structural repairs or replacement of the arena roof was identified in early 2020, Scarborough Arena Gardens was closed to the public.

A temporary shoring scaffolding system was installed at this location so that an engineering consultant could assess the roof structure’s condition and recommend options for repair or replacement.  The shoring remains in place to ensure the roof structure does not collapse and cause significant damage to the facility.

After a thorough review of the engineering consultant’s report and detailed costing of the various options, we have determined that a repair of the existing roof structure does not provide good value for investment as it will not significantly extend the structure’s lifespan.

For this reason, the City will proceed with the procurement of design services and construction tendering for replacement of the entire roof structure and roof cover.

The arena will remain closed for the duration of this work.

Direct communication with Scarborough Arena Gardens user groups will occur in early 2021 and an ice relocation plan will be developed to provide alternative locations for permit and city-run programming.

April 2020

A temporary reinforcement of roof structure was installed to further assess the roof structure’s condition and recommend options for repair or replacement.

Scarborough Arena Gardens is located near Birchmount Road and Hollis Avenue in Scarborough. It houses an indoor ice rink, mechanical and electrical rooms, change rooms, and office spaces.

The roof and building structure has reached the end of its lifespan and requires a full replacement. The improvements to the arena include:

  • Upgrades to community spaces i.e. lobby, multi-purpose room
  • Upgrades to the refrigeration system
  • A new rink slab and associated dasher boards
  • Upgrades to the public washrooms and changing rooms
  • Upgrades to the buildings mechanical and electrical system in order to  meet the City’s mandate to reduce  greenhouse gas emissions
  • Accessibility improvements throughout the facility

The arena will remain closed during construction.