Construction of the new playground at 420 Huron St. will continue until mid-November. The temporary playground across the street will be removed once the new playground opens. Visit the Project Updates section for more information.
The City is improving the playground in Huron-Washington Parkette. These improvements are part of an ongoing city-wide program to ensure our playgrounds provide safe and accessible fun for years to come!
While we aim to provide fully accessible content, there is no text alternative available for some of the content on this site. If you require alternate formats or need assistance understanding our maps, drawings, or any other content, please contact Rachel Weston at 416-937-3481.
The timeline is subject to change.
Sign up for updates related to the Huron-Washington Parkette Playground Improvements or unsubscribe from the mailing list.
Construction of the new playground is progressing well and is expected to be completed in mid-November 2026. Once the new playground opens, the temporary playground across the street will be removed. The temporary playground is located on University of Toronto property and was installed under a temporary license agreement that requires the site to be restored to its previous condition once the new playground is complete.
Remediation work has been completed and construction of the new playground is underway.
Soil remediation (the process of removing contaminants from soil) is required before construction for the new playground can begin. A soil management plan is underway and will be completed in fall 2025. Playground construction is anticipated to start in spring 2026.

From October 16 to October 30, feedback on multiple playground design options was collected in an online survey. The survey was promoted through paid social media ads, outreach to nearby schools, the local Councillor’s office, on-site signage and on this page. The survey received a total of 247 responses.
The design team will use this feedback to refine a final design. The final design will be available on this page in winter 2024.
All four designs are accessible, have the same amount of play features and cost the same amount.
Playground Design A includes:
Playground Design B includes:
Playground Design C includes:
Playground Design D includes:
On October 26, from 3 p.m. to 5 p.m., over 60 community members participated in a pop-up event at Huron Washington Parkette at 420 Huron St. The pop-up allowed community members to provide feedback to the project team in person, either verbally or using pop-up boards. Four members of the project team were available to collect feedback and answer questions.
The design team will use this feedback to refine a final design. The final design will be available on this page in winter 2024.
Key feedback, with the total number of “agree” responses in parentheses, includes:
An online survey was opened on October 20, 2021, to gather feedback from the community on preferences for the new playground features and design. During the online survey period, multiple community members requested that the proposed playground area be enlarged to include more play features, and that the temporary playground located south of Washington Avenue remain in place (refer to the image in the About the Project section for an overview of these locations). There were 15 responses to the online survey, which will be summarized and posted to this page.
The survey was closed early and based on the feedback received from the community, the size and location of the proposed playground is currently under review. Huron-Washington Parkette is owned by the University of Toronto School, who lease the land to the City for the purpose of a public parkette. During the design process, the City will explore opportunities to improve the playground area based on feedback received from the community. Once the playground options are developed, a public meeting will take place and a new survey will be posted in early 2022 to share and collect feedback on these playground options.
The temporary playground is property of the University of Toronto School and will not remain in place once the new playground is installed.
Huron-Washington Parkette is located at 420 Huron St. and previously had a playground that was removed in 2019 to accommodate the construction of the University of Toronto Schools (UTS) building addition. The parkette is located on land that is leased to the City by the University of Toronto. During construction of the new UTS building, a temporary playground was installed across the street, at the southwest corner of Huron Street and Washington Avenue. The temporary playground will be removed once the new playground is installed in the parkette.
The new playground will be redesigned using feedback from the community and is proposed to include:
Improvements will only be made in the playground area and will not include improvements to other areas of the parkette.