The City is improving the playground in Chartland Park. These improvements are part of an ongoing city-wide program to ensure playgrounds provide safe and accessible fun for many years to come.

  • Summer 2023: Community engagement (online survey)
  • Late Fall 2023: Detailed design and hire a construction team
  • Spring 2024: Construction starts
  • Fall 2024: Construction complete, playground reopens

The timeline is subject to change.

Online Survey

Summer 2023

An online survey will be posted on this page in the summer. The survey will ask for your feedback and preferences on multiple playground options. The design team will use the community feedback collected in this survey to develop a single playground design.

The results of the survey will also be posted on this page.

Chartland Park Playground is located at 99 Chartland Blvd S. in the east area of the park.

The playground currently includes:

  • Two swing sets with four swings for ages two and five
  • A medium sized slide
  • A spring toy
  • A climbing structure
  • A curved slide structure
  • Sand under all play areas

The playground will be redesigned using feedback from the community. The redesigned playground is proposed to include:

  • Playground equipment for ages two to 12
  • Additional seating
  • Engineered wood fibre playground surfacing
  • Accessible play equipment and an accessible pathway connecting to the playground area. This means that people of all abilities will be able to play at this playground.

Improvements will only be made in the general playground area. This will not include any new water or lighting features or improvements to other areas of the park.