Review feedback from the online survey in the Project Updates section.

 

The City is improving the playground in Driftwood Park as part of an ongoing program to enhance playgrounds and play spaces across the city so that everyone can experience the joys and benefits of play for years to come.

  • Summer 2025: Hire a design team
  • Winter to Spring 2026: Community engagement and design development
  • Spring 2026: Detailed design
  • Summer 2026: Hire a construction team
  • Fall 2026: Construction

The timeline is subject to change.

Sign Up for Updates

Sign Up Now

Sign up for or unsubscribe from updates related to Driftwood Park Playground Improvements.

Level of Engagement

This project has been classified as a Consult project based on the International Association for Public Participation Spectrum. This means we obtain public feedback on design options for the playground improvements.

May 2026

Online Survey

From April 20 to May 18, 2026, feedback on multiple playground design options was collected in an online survey. The survey was promoted through paid social media ads, outreach to nearby schools, the local Councillor’s office, on-site signage and on this page. The survey received a total of 129 responses.

The design team will use this feedback to refine the final playground design. The final design will be available on this page in Summer 2026.

Key Feedback Highlights

  • When asked to rank their playground design preference, respondents ranked Playground Design C highest (42 per cent) followed by Playground Design B (40 per cent) and Playground Design A (18 per cent).
  • Respondents shared that the three most important features to include in the new playground are:
    • senior play structure for ages five to 12
    • climbing structures
    • junior play structure for ages two to five
  • Respondents shared that the three least important features to include in the new playground are:
    • stand-up spinner toys
    • stand-alone toys
    • play panels
  • If budget permits, the three features respondents would like more of in the improved playground are:
    • climbing structures
    • senior play structures for ages five to 12
    • group/accessible swings
  • For seating around the playground:
    • 88 per cent of respondents like metal tables with umbrella shade
    • 48 per cent of respondents like benches
    • 32 per cent of respondents like armour stones

The preferred colour scheme for the new playground was earthy colours, like green, brown and grey (37 per cent) over vibrant cool colours, like blue, turquoise and purple (34 per cent), and bright colours, like yellow, orange and purple(22 percent).

Playground Options

All three designs are AODA compliant, have the same amount of play features and cost the same amount.

Playground Design A

A rendering of Playground Design A looking towards the southeast. From left to right the design includes a junior play structure, a senior play structure, a spring rider, a swing set, and a stand-up spinning toy. The structures are shown in light green, rust and beige.

Design A includes
  • a swing set with:
    • two belt swings
    • one toddler swing
    • one accessible swing
  • a junior play structure for ages two to five with:
    • one curved slide
    • one double slide
    • two climbing options
    • one ladder climbing option
    • one rope climbing option
    • one activity play panel
    • one wheel play panel
    • one counter play panel
    • one turning bar
    • one boogie board
    • two seats
    • two roofs for shade
    • one transfer station
  • a senior play structure for ages five to 12 with:
    • one curved slide
    • one wave slide
    • five climbing options
    • one climbing wall option
    • one rope climbing option
    • one horizontal climbing option
    • two overhead climbing options
    • one counter play panel
    • steps
    • step pods
    • two roofs for shade
    • transfer station
  • one stand-up spinning toy
  • one spring rider

Playground Design B

: A rendering of Playground Design B looking towards the northwest. From left to right the design includes a junior play structure, a stand-up spinning toy, a climbing structure, a senior play structure, a spinning toy, a freestanding overhead climber, and a swing set. The structures are shown in light green, dark green, beige, and grey.

Design B includes
  • a swing set with:
    • two belt swings
    • one toddler swing
    • one accessible chair swing
  • a junior play structure for ages two to five with:
    • one curved slide
    • one double slide
    • one climbing option
    • one activity play panel
    • once counter play panel
    • one hammock
    • one roof for shade
    • one transfer station
  • a senior play structure for ages five to 12 with:
    • one wave slide
    • one double slide
    • two climbing options
    • one climbing wall option
    • two ladder climbing options
    • one overhead climbing option
    • one bridge climbing option
    • one wheel play panel
    • one step
    • two roofs for shade
    • one transfer station
  • standalone play features:
    • one climbing structure
    • one overhead climbing option
    • one stand up spinning toy
    • one spinning toy
    • one spring rider
    • one communication board

Playground Design C

A rendering of Playground Design C looking towards the east. From left to right the design includes a swing set, a spinning toy, a junior play structure, a senior play structure, and an overhead spinning toy. The structures are shown in dark green, beige, and brown.

Design C includes
  • a swing set with:
    • two belt swings
    • one toddler swing
    • one accessible chair swing
  • a junior play structure for ages two to five with:
    • one curved slide
    • one straight slide
    • two climbing options
    • one chain net climbing option
    • one activity play panel
    • one balance toy
    • steps
    • step pods
    • one roof for shade
    • one transfer station
  • a senior play structure for ages five to 12 with:
    • one spiral slide
    • one straight slide
    • four climbing options
    • one sloped climbing options
    • two overhead climbing options
    • one activity play panel
    • steps
    • step pods
    • table and seats
    • two roofs for shade
    • one transfer station
  • standalone play features:
    • one spinning toy
    • one overhead spinning toy

In-Person Pop-Up Event

On May 7, feedback on multiple playground design options was collected at a pop-up event in Driftwood Park. Approximately 40 community members attended the event.

A summary of the pop-up feedback will be posted on this page.

Driftwood Park Playground is located southwest of the ball diamond and is connected to Finch Hydro Corrido Recreational Trail.

The playground currently includes:

  • two swing sets with:
    • two swings for ages two to five
    • two swings for ages five and up
  • a senior play structure with a curved slide
  • a junior play structure with a double slide and a curved slide
  • a stand-alone climbing net and structure
  • a junior climbing structure
  • sand under all play areas
  • armourstone seatwall
  • three benches

The playground will be redesigned using community feedback and is proposed to include:

  • playground equipment for ages five to 12
  • engineered wood fibre surfacing
  • an accessible pathway to the playground area
  • new benches on a concrete pad

The play equipment and pathway connecting to the playground area will comply with the Accessibility for Ontarians with Disabilities Act (AODA). Learn more about how playgrounds are made accessible.

Improvements will only be made in the general playground area and will not include any new water or lighting features or improvements to other areas of the park.