Review feedback from the online survey in the Project Updates section.
The City is improving the playground and adding a new fitness area in Joyce Park as part of an ongoing program to enhance playgrounds and play spaces across the city.
  • Summer 2025: Hire a design team
  • Fall 2025: Design development
  • Winter 2026: Community engagement (online survey)
  • Spring to Summer 2026: Detailed design and hire a construction team
  • Fall 2026: Construction starts, playground closes
  • Winter 2026: Construction complete, playground reopens

The timeline is subject to change.

Sign Up for Updates

Sign Up Now

Sign up for or unsubscribe from updates related to Joyce Park Playground Improvements.

Level of Engagement

This project has been classified as a Consult project based on the International Association for Public Participation Spectrum. This means we collect and consider public feedback on proposed design options to inform the development of a final playground design.

May 2026

Online Survey

From April 27 to May 22 feedback on multiple playground design options was collected in an online survey. The survey was promoted through paid social media ads, the local Councillor’s office, on-site signage and on this page. The survey received a total of 42 responses.

The design team will use this feedback to refine the final playground design. The final design will be available on this page in Fall 2026.

Key Feedback Highlights
  • When asked to rank their playground design preference, respondents ranked Playground Design B (39 percent) and Playground Design C (39 percent) followed by Playground Design A (21 percent).
  • Respondents shared that the three most important features to include in the new playground are:
    • senior play structure (ages five to 12)
    • junior play structure (ages two to five)
    • climbing structures
  • Respondents shared that the three least important features to include in the new playground are:
    • play panels
    • stand-up spinner equipment
    • group swing
  • If budget permits, the three features respondents would like more of in the improved playground are:
    • senior play structure (ages five to 12)
    • climbing structures
    • standalone play features
  • For seating around the playground:
    • 72 percent of respondents like metal tables with umbrellas
    • 50 percent of respondents like benches
    • 39 percent of respondents like armour stones
  • The preferred colour scheme for the new playground was a mix of bright warm colours and vibrant cool colours (33 per cent) over warm colours, like yellow, earthy colours, like green, brown, beige and grey, with a pop of bright colour (19 per cent), orange and red (17 per cent), and vibrant cool colours, like blue, turquoise and purple(14 per cent).
Playground Options

All three designs are AODA compliant, have the same amount of play features and cost the same amount.

Playground Design A

An aerial view of Playground Design A looking to the southwest from the northeast. From the lower left to the upper right, it includes swings, senior play equipment with climbers and slides, a spinning balancing seat, and junior play equipment with steps and a dual slide.

Design A includes:

  • one swing set with:
    • two belt swings
    • one toddler swing
    • one accessible swing
  • one junior play structure for ages two to five with:
    • one dual slide
    • two accessible play panels
    • one accent climber
    • one attic climber
    • decorative roof
    • accessible transfer station
  • A senior play structure for ages five to 12 with:
    • one curved slide
    • one wave slide
    • three accessible play panels
    • one canyon climber
    • one tree-themed climber
    • one overhead climber
    • one twister climber
    • one lookout tower with telescope
    • decorative roof
    • accessible transfer station
  • one spring toy
  • one solo spinning balancing seat
Playground Design B

An aerial view of Playground Design B main senior play structure. From the left to the right, it includes senior play equipment with slides and climbers, balancing steps, ladder, hooped overhead climbers, arch climber and a swing set in the back.

Design B includes:

  • one swing set with:
  • two belt swings
  • one toddler swing
  • one accessible swing
  • one junior play structure for ages two to five with:
    • two accessible play panels
    • one talk tube
    • one arch climber
    • one swerve slide
    • one little foot slide
    • accessible transfer station
  • one senior play structure for ages five to 12 with:
    • two accessible play panels
    • one set of pod steps
    • one sail climbing wall
    • one overhead climber
    • one wilderness slide
    • one vertical ladder
    • one arched climber
    • one spiral step climber
    • one curved slide
    • one telescope
    • one climbing Rail
    • accessible transfer station
  • one set of balancing toadstool steps
  • one seated duo spinner
Playground Design C

An aerial view of Playground Design C looking to the northeast from the southwest. From the lower left to the upper right, it includes junior play equipment, monkey bars, a swing set, senior play equipment, bridge, slide, and a ladder.

Design C includes:

  • one swing set with:
  • two belt swings
  • one toddler swing
  • one accessible swing
  • one junior play structure for ages two to five with:
    • one hammock
    • one curved slide
    • one double slide
    • one cable net
    • one shade roof
    • one labyrinth play panel
    • one role-play game counter
    • accessible transfer station
  • one senior play structure for ages five to 12 with:
    • one slide
    • one steering wheel feature
    • one telescope
    • one hammock
    • one monkey bar rings
    • two climbers
    • two climbing walls
    • one curved overhead loop ladder
    • two curved net bridges
    • decorative roof
  • one stand-up spinner
  • one spring rider
  • one play panel

      Joyce Park is located near the intersection of Caledonia Road and Lawrence Avenue West. The playground is located in the west area of the park.

      The playground currently includes:

      • two swing sets with:
        • two swings for ages two to five
        • two swings for ages five and up
      • one junior play structure with:
        • one wavy slide
        • one curved slide
        • Three climbing options
        • one playhouse
        • one tunnel bridge
        • one play panel
      • one seesaw
      • one sandbox
      • sand under all play areas

      The playground will be redesigned using community feedback and is proposed to include:

      • playground equipment for ages five to 12
      • additional seating
      • engineered wood fibre surfacing
      • an accessible pathway from the sidewalk to the playground area

      The play equipment and pathway connecting to the playground area will comply with the Accessibility for Ontarians with Disabilities Act (AODA). Learn more about how playgrounds are made accessible.

      Improvements will only be made in the general playground area and will not include any new water or lighting features or improvements to other areas of the park.

      Date modified: August 12, 2026