The City is improving the playground in Millwood Park as part of an ongoing program to enhance playgrounds and play spaces across the city, so that everyone can experience the joys and benefits of play for years to come.

  • Spring 2026: Community engagement (online survey)
  • Summer 2026: Detailed design and hire a construction team
  • Fall 2026: Construction starts, playground closes
  • Late Fall 2026: Construction complete, playground reopens

The timeline is subject to change.

Online Survey

June 2026

An online survey will be posted on this page in June. The survey will ask for your feedback and preferences on playground options. The design team will use this community feedback to develop the final playground design.

The results of the survey will also be shared on this page.

Sign Up for Updates

Sign Up Now

Sign up for or unsubscribe from updates related to the Millwood Park Playground Improvements.

Level of Engagement


This project has been classified as a Consult project based on the International Association for Public Participation‘s Spectrum. This means we collect and consider public feedback on proposed design options to inform the development of a final playground design.

The playground in Millwood Park is located east of the ball diamond.

The playground currently includes:

  • two swing sets with:
    • four swings for ages two to five
    • two swings for ages five and up
  • a senior climbing structure with:
    • two slides
    • monkey bars
  • a junior climbing structure with a small slide
  • sand under all play areas

The playground will be redesigned using community feedback and is proposed to include:

  • playground equipment for ages five to 12
  • additional seating
  • engineered wood fibre surfacing
  • an accessible pathway to the playground area

The play equipment and pathway connecting to the playground area will comply with the Accessibility for Ontarians with Disabilities Act (AODA). Learn more about how playgrounds are made accessible.

Improvements will only be made in the general playground area and will not include any new water or lighting features or improvements to other areas of the park.