A new park is being designed as part of the new Crosstown-Eglinton mixed-use community development. The City will be engaging local residents to determine a new site-appropriate park that meets the needs of the community.

Project Timeline

  • Winter 2020 to Spring 2021: Conceptual design development and community engagement
  • Summer 2021 to Final design development
  • 2020 to 2022 to Tender for construction
  • Summer 2023 to Construction

The timeline is subject to change.

A new 3120 m2 park is being designed at the northwest corner of Eglinton Avenue and Don Mills Road. The project is part of the new 24-hectare Crosstown Eglinton mixed-use community development.

The proposed park is in the conceptual design phase which will be developed through consultation with the community. The proposed plan for the new park includes the following:

  • A new playground
  • New accessible pathways
  • An open amphitheatre
  • New plantings/planting beds
  • A shade structure

Virtual Public Engagement

A virtual public meeting will be taking place in February 2021 to present the concept plan for the new park and gather feedback from the community on the park design and playground equipment options. Feedback from this meeting will be considered for the final park design in advance of the construction drawing preparation and project construction.

Online Survey

January 2020

An online survey will be launched in January 2020 prior to the virtual public meeting to gather feedback from the community, and results will be partially presented at the virtual meeting. The survey link and timelines will be shared when details are confirmed.

Sign Up Now

Sign up for regular project updates related to Crosstown Park South, or to unsubscribe from our mailing list.