Work on the Parkside Bridge has been completed with the exception of street light work, which will be scheduled within the next few months.
Location
Parkside Bridge at The Queensway; both underside and topside of the bridge.
Work Scope
Bridge rehabilitation.
Dates
April 5, 2021 to September 3, 2022 (Timelines are subject to change)
Locations
KQQR Intersection
The Queensway: KQQR intersection to Parkside Drive
Queen Street West: KQQR Intersection to Triller Avenue
Roncesvalles Avenue: KQQR intersection to south of Grafton Avenue
Work Scope
Watermain replacement and sewer relining.
TTC and road work (outer lanes): Work crews will undertake the following work: TTC pole replacement, overhead wire removals and installation, track work, (lighting, platforms, curbs etc.), retaining wall installation, road reconstruction (base, curb gutter, sidewalk).
Dates
November 13, 2021 to September 3, 2022 (Timelines are subject to change)
Locations
The Queensway: Parkside Drive to Sunnyside Avenue
Beaty Boulevard Park: southwest corner of KQQR intersection
King Street West: KQQR Intersection to approximately 100 m south thereof
Work Scope
Watermain replacement and sewer lining: Please refer to work details listed in Advance Work (completed).
TTC and road work (inner lanes): Work crews will undertake the following work: TTC pole replacement and overhead wire installation, track work, (lighting, platforms, curbs etc.), road reconstruction (base, curb gutter, sidewalk).
Streetscape work: Work crews will undertake streetscape improvements at Beaty Boulevard Park.
Bridge rehabilitation: Work crews will repair The Queensway bridge at Parkside Drive (inner lanes).
Dates
September 4, 2022 to December 31, 2022 (Timelines are subject to change)
Locations
Roncesvalles Avenue: Queen Street West to Dundas Street West
Work Scope
Watermain replacement and sewer relining.
TTC and road work Queen Street West to Harvard Avenue: Work crews will undertake the following work: TTC pole replacement, overhead wire removals and installation, track work, (lighting, platforms, curbs etc.), road reconstruction (base, curb gutter, sidewalk).
Harvard Avenue to Dundas Street West: Work crews will undertake the following work: Platform upgrades for accessibility.