The Glen Road Pedestrian Bridge (also known as Morley Callaghan Footbridge) is located across the Rosedale Valley Ravine and was removed on the weekend of March 11 and 12, 2023. The City will be replacing the bridge as well as a pedestrian tunnel under Bloor Street East by the end of 2023. Learn more about this project.

B-Roll

To download a video, first open this video download link in a new tab. Then, right-click on the video and select “Save video as…” or click the three dots at the bottom-right of the video and select “Download”.

 

 

Download Video

B-Roll video of the Glen Road Pedestrian Bridge over Rosedale Valley Road being taken apart on March 11, 2023.

Download Video

B-Roll video of the Glen Road Pedestrian Bridge in October 2022 before it was demolished.

 

Images

Click to enlarge the image.

Machinery dismantling bridge.
The Glen Road Pedestrian Bridge over Rosedale Valley Road being taken apart on March 11, 2023. A new bridge will be built this year.
An overhead crane lifts pieces of the pedestrian bridge away.
Crews work on March 11, 2023 to remove the existing Glen Road Pedestrian Bridge.

The Glen Road Pedestrian Bridge overlooking Rosedale Valley Road before it was demolished in March 2023.
Photo taken October 2022 of the Glen Road Pedestrian Bridge before it was demolished in March 2023. It will be replaced with a new bridge in 2023.