Toronto Island Park has long been a place of cultural and ecological significance. For thousands of years, it has been a site of healing, ceremony and gathering for the Mississaugas of the Credit First Nation and other Indigenous communities. Today, it remains a cherished public space and one of Toronto’s most beloved parks.

Following City Council’s adoption of the Toronto Island Park Plan in July 2024, the City is moving forward with projects to enhance and protect the park over time, guided by the plan’s long-term vision.

While we aim to provide fully accessible content, there is no text alternative available for some of the content on this site. If you require alternate formats or need assistance understanding our maps, drawings, or any other content, please contact Netami Stuart at 416-338-5901.

Online Survey

August 28 to September 13, 2026

Take the online survey to tell us how we can improve the Ward’s Island, Centre Island and Hanlan’s Point ferry landings.

Sign Up for Updates

Sign Up Now

Sign up for or unsubscribe from updates related to Toronto Island Park Projects.

After the Toronto Island Park Plan was adopted in 2024, City Council directed City staff to continue engaging key audiences on the implementation by forming working groups that meet regularly.

These groups formed through a civic lottery bring together people with local knowledge and experience to work with City staff, explore issues and provide advice on projects identified in the Toronto Island Park Plan and on the overall management of Toronto Island Park.

In addition to the establishment of the three working groups, the City will continue to seek input from the broader public as new projects on Toronto Island are launched.

Meeting notes and presentation materials will be posted in this section after each working group meets.

Engagement

July 2026

Online Survey

From June 22 to July 20, an online survey collected feedback to help shape future recommendations for safety and wellbeing at Hanlan’s Point Beach.

A summary of the feedback will be posted on this page.

January 2026

All-Working Groups Meeting

On January 31, members of all three working groups Indigenous Advisory Circle, Island Working Group and Hanlan’s Point Beach Working Group came together review their roles in supporting the implementation of the Toronto Island Park Plan and to get an overview of the projects they will help advise on in 2026.

A summary of the meeting will be posted on this page.

December 2025

Bike Share Virtual Public Meeting

On December 3, a virtual public meeting was held to share insight into the Bike Share operations on Toronto Island in 2025, share the Bike Share Pilot’s Survey findings and learn from people’s experiences. A summary of the meeting will be posted on this page.

October 2025

Online Survey

From August 8 to October 15, an online survey collected feedback to help inform future improvements to Bike Share on Toronto Island Park.

A summary of the feedback will be posted on this page.

Hanlan’s Point Beach Working Group

The Hanlan’s Point Beach Working Group was formed to provide advice on projects and priorities relevant to 2SLGBTQ+ communities, both at Hanlan’s Point and across the Toronto Islands. The group includes about 20 members, made up of individuals with diverse backgrounds and connections to Hanlan’s Point Beach, as well as representatives from organizations that reflect broader communities.

March 2026

On March 7, the Hanlan’s Point Beach Working Group met to review several Toronto Island Park Plan projects, with a focus on Hanlan’s Point. Discussion covered the Ferry Landings Revitalization project, Hanlan’s Beach Renourishment, the Hanlan’s Point Beach Community Safety and Wellbeing Plan, and the Hanlan’s Landscape Design and Servicing work. Participants also discussed 2026 planting considerations and explored how these projects can be coordinated to support ecological resilience, 2SLGBTQ+ safety and cultural significance, and an improved visitor experience at Hanlan’s Point.

A summary of the meeting will be posted on this page.

November/December 2025

On November 5 and December 6, the Hanlan’s Point Beach Working Group met to reconnect and discuss and workshop a Draft Terms of Reference for the Working Group. A Terms of Reference is a brief guide that explains a working group’s purpose, responsibilities, and decision-making process. It is a tool that will help the working group stay focused, accountable, and effective. Meeting summaries will be posted shortly.

Download the November 2025 Hanlan’s Point Beach Working Group meeting summary.

Download the December 2025 Hanlan's Point Beach Working Group meeting summary.

June 2025

On June 23, the Hanlan’s Point Beach Working Group met to reconnect, review recent actions and establish priorities for moving forward. Participants, representing diverse communities and long-time stewards of the beach, emphasized Hanlan’s cultural, historical and personal significance, especially for 2SLGBTQ+ communities. Key themes that emerged from this meeting included:

  • the need for a community safety plan
  • stewardship of history and culture
  • environmental management
  • accessibility improvements
  • accountability in the engagement process

While differences of opinion emerged – particularly around safety approaches and the role of facilities – the group expressed a strong commitment to collaboration, transparency and amplifying marginalized voices.

Download the June 2025 Hanlan’s Point Beach Working Group meeting summary.

Indigenous Advisory Circle

The Indigenous Advisory Circle will reflect a diversity of Indigenous voices, perspectives, and interests in Toronto Island Park. Its structure, membership and guiding protocols will be shaped by the advice and interests of First Nations. The work of this group is a step toward shared decision-making and co-management of Toronto Island Park spaces.

March 2026

On March 9, the Indigenous Advisory Circle met to review several Toronto Island Park Plan projects, with a focus on Indigenous placekeeping, cultural protocols and early project direction. Discussion included an update on the draft Knowledge Sharing Protocols, the Ferry Landings Revitalization project and the proposed Snake Island Ceremonial Space. Members also received updates on several Hanlan’s Point projects, including Beach Renourishment, the Community Safety and Wellbeing Plan, Landscape Design and Servicing work, and 2026 planting. The meeting provided an opportunity for members to share early guidance on how these projects can better reflect Indigenous values, support respectful collaboration and advance implementation of the Toronto Island Park Plan.

A summary of the meeting will be posted on this page.

November 2025

On November 25, the Indigenous Advisory Circle met for the first time. Advisory members had a chance to introduce themselves, meet the project learn, learn about the Toronto Island Projects and discuss how the membership wants to work together.

Download the November 2025 Indigenous Advisory Circle meeting summary.

Island Working Group

The Island Working Group brings together a wide range of voices, including island residents, waterfront users, city-wide organizations, local businesses and advocacy groups. It also includes members selected through a civic lottery to ensure participation from underserved and underrepresented communities. The group provides input across all the goals of the Toronto Island Park Plan.

March 2026

On March 12, the Island Working Group met to review and discuss several Toronto Island Park Plan projects related to access, movement and public experience across the Island. The meeting included discussion on the Ferry Landings Revitalization project and the Island Movement Strategy, followed by updates on several Hanlan’s Point initiatives, including the Hanlan’s Landscape Design and Servicing work and Beach Renourishment. Members had the opportunity to share feedback on early project analysis, emerging priorities, and how these projects can improve access, wayfinding, mobility, and overall visitor experience while aligning with the broader goals of the Toronto Island Park Plan.

A summary of the meeting will be posted on this page.

November 2025

On November 20, the Island Working Group met to as a full group (original CAC and new Island Working Group civic lottery members) to meet one another, learn about the Toronto Island Projects and discuss and workshop a Draft Terms of Reference for the Working Group.

Download the November 2025 Island Working Group meeting summary.

October 2025

Island Working Group Application

From October 3 to November 2, community members could apply to join the Island Working Group and help guide the implementation of the Toronto Island Park Plan. The Island Working Group will support the City’s project team by sharing feedback and ideas to ensure the Islands remain inclusive, welcoming and vibrant for all Torontonians.

June 2025

On June 25, the Community Advisory Committee involved with the development of the Toronto Island Park Plan met to review progress, confirm ongoing participation and prepare for the Committee’s transition into the broader Island Working Group. Members emphasized protecting the Island’s unique character, culture, and ecology while balancing diverse needs such as public access, resident well-being, and visitor experiences. Key priorities discussed during the meeting included:

  • managing capacity to preserve the Island’s “magic”
  • safeguarding natural habitats
  • addressing mobility and pedestrian safety
  • strengthening community safety and by-law enforcement
  • enhancing visitor experiences.

Participants also stressed the importance of clear mandates, inclusive representation, transparent data-sharing and well-structured meetings.

Download the June 2025 Toronto Island Park Plan Community Advisory Committee meeting summary.

About the Civic Lottery

A civic lottery is a way to fairly select a group of everyday people to help guide public decision-making. People are chosen at random so the group reflects the full diversity of the city. This ensures that the people most affected by public spaces have a real voice in shaping them.

For the Toronto Island Park Working Groups, the civic lottery creates groups that reflect a range of voices, experiences and perspectives. The selection process uses citywide census data to ensure a mix of ages, backgrounds, incomes and neighbourhoods, with a special focus on including people whose voices have often been left out, especially those with a strong personal, cultural or historical connection to the Island.

This project is focused on improving the three Island-side ferry landings at Hanlan’s Point, Centre Island and Ward’s Island. The work includes background research, site inventory and analysis, development of early design and recommendations for phasing and implementation. The project is intended to improve accessibility, wayfinding, visitor experience, passenger movement and overall arrival to Toronto Island Park, while also strengthening each landing’s unique identity and aligning with broader Island initiatives. This phase of work is focused on planning and concept development and does not include detailed design or construction.

Project Timeline

  • Fall 2025: Project work planning
  • Winter 2026: Existing conditions review and site analysis
  • Spring 2026: Design direction, scope and program development; next round of working group engagement tentatively planned for mid-May 2026
  • Summer – Fall 2026: Development of landing design and enhancement options, including stakeholder and public engagement
  • Winter 2026 – 2027: Costing, phasing and implementation recommendations

A coordinated series of projects is underway across Hanlan’s Point Beach, focused on supporting the long-term ecological health, cultural significance, safety and visitor experience of the area. This work includes beach renourishment and shoreline resilience planning, ecological restoration and re-naturalization, landscape and servicing improvements, upgraded wayfinding and signage, and the development of a Community Safety and Wellbeing Plan. Together, these projects are intended to ensure that future improvements to Hanlan’s Point Beach are connected, responsive and grounded in the unique identity of the beach and surrounding parkland.

The projects are being advanced together because decisions about the physical landscape – including lighting, pathways, beach access, gathering spaces, amenities, signage, ecological restoration and servicing infrastructure – all contribute to how people experience safety, belonging, accessibility, comfort and care within the space. The work also recognizes the importance of protecting and strengthening the environmental resilience, cultural identity and community-defined character of Hanlan’s Point Beach for current and future generations.

More information about each project is provided below.

Beach Renourishment

Work is underway on a strategy to address shoreline erosion and improve coastal resilience at Hanlan’s Point Beach. The work aims to better protect and restore beach areas impacted by erosion, while balancing ecological protection, shoreline function, public access and the cultural significance of Hanlan’s as an important 2SLGBTQ+ gathering place. The project will improve understanding of coastal processes, identify appropriate renourishment approaches and plan proactively for the long-term stewardship of the beach.

Project Timeline

  • Spring 2026: Initial project discussions and working group input
  • Spring to Fall 2026: Ongoing technical work and community/working group engagement
  • Future phases: Additional timing, engagement opportunities and specific proposed actions will continue to be shared as the project advances

Landscape and Servicing Plan

This project will develop a landscape implementation plan for Hanlan’s Point Beach and surrounding areas that brings together existing conditions, 2024-2025 Improvements, re-naturalization work and proposed future improvements. It is intended to coordinate multiple overlapping projects and identify how future improvements – such as servicing, amenities, furnishings and public realm upgrades – can be delivered in a more integrated way. Potential actions within the scope of the plan may include Rainbow Road improvements, revised picnic area mapping, relocated amenities, electrical and water servicing, beach showers and drinking fountains, and recreation opportunities.

Project Timeline

  • Spring 2026: Hire landscape architecture design team and confirm project scope
  • Summer 2026: First round of design development and working group review of vision, guiding principles and initial program ideas
  • Fall 2026: Review design options with community and working groups
  • Late Fall to Early Winter 2026: Review preferred design direction
  • 2027: Implementation of preferred landscape improvements

    Community Safety and Wellbeing Plan

    The Community Safety and Wellbeing Plan is focused on supporting a safe, welcoming, inclusive and culturally respectful environment at Hanlan’s Point Beach. The plan recognizes that safety and wellbeing are shaped by many interconnected factors, including the physical environment, lighting and visibility, beach access and movement, ecological conditions, amenities, social dynamics and people’s experiences of belonging and care within the space. The work also acknowledges the unique cultural significance of Hanlan’s Point Beach as a longstanding 2SLGBTQ+ and clothing-optional gathering space.

    The plan is being developed alongside other ongoing Hanlan’s Point Beach projects, including beach renourishment, ecological restoration and re-naturalization, landscape and servicing improvements, and signage and wayfinding enhancements. Through research, technical analysis, environmental review and community engagement, the project will help guide future improvements that support the long-term environmental health, cultural significance, accessibility, safety and visitor experience of Hanlan’s Point Beach.

    Project Timeline

    • Spring 2026: Project initiation, governance, safety framework, research, data review and risk mapping
    • Early and Late Summer 2026: Community engagement, lived experience input, on-site engagement and frontline interviews
    • Summer 2026: Implementation planning, including seasonal operations guidance, staffing, training and partnership needs
    • Fall to Winter 2026: Strategy development and working group review
    • 2027: Final review and publication
    • Ongoing: Monitoring, seasonal review and continuous learning

    Hanlan’s Point Beach Improvements (Completed 2024-2025)

    Over the winter and spring of 2024-2025, in response to direction from City Council, the City made significant changes to the landscape and access points to the Clothing-Optional Beach at Hanlan’s Point. These improvements aim to restore the area’s ecology and preserve the history and culture of Hanlan’s Point Beach and its surroundings.

    Aerial map of Hanlan’s Point showing completed improvements as of July 1, 2025. From left to right, labelled improvement areas include Beach Road realignment, an additional Pride Progress flag, tennis court removal, newly planted trees, bike facilities, water bottle filling stations and planned fencing.

    Map of 2024-25 Hanlan’s Point Beach improvements as of July 1, 2025.
    • Yellow lines: updated Beach Road alignments and access routes
    • White lines: new or improved paths
    • Green shaded areas: re-naturalization planting zones and vegetation

    Improvements completed from 2024-2025 include:

    • Beach restoration, shoreline resilience and access improvements, including restoring and expanding the clothing-optional beach area, realigning Beach Road to improve access from the ferry landing, a new paved trail to access the northernmost beach entry point while protecting the adjacent Environmentally Significant Area, relocating the lifeguard station and building a new lifeguard shed at Beach Access #3, and installing approximately 60 new bike racks with parking for up to 240 bicycles.
    • Ecological protection, dune management and re-naturalization, such as fencing to protect dunes and ecologically sensitive areas by redirecting and reducing crowds, a pilot re-naturalization (“rewilding”) initiative to increase natural buffer zones adjacent to the Environmentally Significant Area and completion of approximately 24,000m2 of re-naturalization planting and restoration.
    • Beach renourishment and coastal resilience planning, including beginning work on a study of options to address shoreline erosion, restore approximately 400 metres of eroded and unusable beach, and enhance and protect the sandy shoreline.
    • New cultural recognition and commemorative features to acknowledge Hanlan’s Point Beach as a historic gathering place for queer communities and the site of Canada’s first 2SLGBTQ+ Pride gathering. Features include Canada’s first Pride heritage plaque, Rainbow Road recognition signage provided by Friends of Hanlan’s and Pride Toronto and a new Pride flagpole at the north end of the beach.
    • Improved signage and wayfinding, including beach access and trail closure signage as well as wayfinding improvements to support visitor navigation, ecological protection and safer movement throughout the beach area.
    • Community safety and waterfront coordination: A Motorized Watercraft Exclusion Zone (MWEZ) was installed 200 metres offshore from Hanlan’s Point Beach by Toronto Port Authority. City staff, the Port Authority and the Toronto Police Service Marine Unit are collaborating on operations and implementation.

    This project will examine how people move through Toronto Island Park and where roads, paths, or travel conditions may feel unsafe or uncomfortable for different users. The study is intended to identify opportunities for low-cost, high-impact “quick win” improvements in the near term, while also laying the groundwork for a broader Park Movement Study. The work will help inform improvements to safety, accessibility, and connectivity across the Island for different travel modes.

    Project Timeline

    • Spring 2026: Identify areas for quick-win attention and gather early public/stakeholder input
    • Summer 2026: Advance quick-win design and release the Park Movement Study procurement
    • Fall 2026: Review quick-win feedback and continue study development
    • Late Fall – Early Winter 2026: Award Park Movement Study consultant team
    • Summer 2027 (anticipated): Potential implementation of quick wins, depending on scope and complexity

    This project is exploring the creation of a ceremonial space on Snake Island as part of the Toronto Island Park Plan’s commitment to Indigenous placekeeping, reconciliation, and revealing an Indigenous place. Early discussions are focused on identifying the City’s first steps in advancing the project and gathering guidance from First Nations and the Indigenous Advisory Circle on how the work should proceed respectfully and in alignment with Indigenous values and protocols.

    Project Timeline

    • Spring 2026: Initial discussions and guidance from First Nations and the Indigenous Advisory Circle and working groups
    • Spring to Fall 2026: Ongoing discussion and project development through Toronto Island Park engagement touchpoints
    • Future phases: Additional project timing will be confirmed as the work advances

    In 2026, the City will begin the hiring process for an interpretive planning consultant with Indigenous design leadership. The consultant will lead a collaborative process to help articulate stories, identify cultural and natural heritage features, and set priorities for interpretation and site-specific approaches to interpretive media.

    This process will result in the design of the first phase of interpretive assets on the Island.

    In late 2024, the Toronto and Region Conservation Authority (TRCA), in partnership with the City, completed the Environmental Study Report for the Toronto Island Park Flood and Erosion Mitigation Class Environmental Assessment.

    The next step is to begin detailed design, coordinated with and in support of the Toronto Island Park Plan. High-level updates will be posted on this page, with full project details available on TRCA’s Toronto Island Park Flood and Erosion Mitigation.

    As part of ongoing efforts to improve access and support sustainability, a Bike Share pilot launched on Toronto Island Park in May 2025 and ran through September 2025. Bike Share offers a convenient, eco-friendly way for visitors to get around and enjoy the park.

    Bike Share will continue to offer service on Toronto Island in the late spring to fall, with adjustments to docking stations.

    The City and Bike Share Toronto welcome feedback on the pilot. Questions, concerns, and general input can be sent to customerservice@bikesharetoronto.com. All feedback will help inform future planning for active transportation on Toronto Island.

    A summary report, including key findings and community input, will be posted after the pilot is completed.

    The Toronto Island Plan includes recommendations to guide improvements over the next 25 years. These recommendations are organized under six goals that work together to address the complexity and opportunities for Toronto Island Park. Each goal is supported by strategies and actions that provide a clear roadmap for investment, partnership, engagement, and other steps needed to achieve the Plan’s long-term vision.

    Download the:

    Community Engagement

    The Toronto Island Park Plan was co-created with Indigenous rights holders, local communities and the public through a series of engagement activities held between 2021 and 2024. In total, more than 4,500 people participated in activities such as Indigenous engagement and placekeeping meetings, virtual and in-person events, stakeholder discussions and a youth ambassador program.

    The following provides a high-level overview of the engagement process.

    Pre-Engagement

    To help shape the early stages of the Plan, the City held pre-engagement focus groups and interviews with Indigenous communities, local organizations, City divisions and partner agencies. These conversations helped build a preliminary understanding of key issues, existing conditions and opportunities on the Toronto Island

    The pre-engagement phase also included a Public Life Study, which looked at how the Island is used, and a storytelling project that invited residents and visitors to share their personal connections to the Island.

    These early activities introduced the project and helped shape how communities wanted to be involved throughout the planning process.

    Download the:

    Community Engagement Phase 1: Towards a Vision

    This phase focused on developing a shared vision, values and guiding principles to inform the Plan. The What We Heard Summary Report brings together key insights and outcomes from all engagement activities and tools used during this phase.

    Download the Phase 1 What We Heard Summary, Toronto Island Park Plan.

    Community Engagement Phase 2: Exploring Options

    This phase built on the collective vision, values and guiding principles developed in Phase 1 to identify Big Ideas and develop a Draft Demonstration Plan. The What We Heard Summary Report summarizes the insights and outcomes from all engagement activities and tools used during this phase.

    Download the:

    Community Engagement Phase 3: Setting the Direction

    This phase focused on confirming the direction of the Plan by refining the Demonstration Plan, shaping site-specific approaches, and identifying priorities for implementation.

    Download the:

    Date modified: August 28, 2026