 |
 |
Previous Water Rates
2004 | 2005 | 2006 | 2007 | 2008
| 2009 | 2010 | 2011 | 2012
Effective January 1, 2013, Toronto City Council approved a 9% general water rate increase for all water consumers.
2013 Metric Water Rates
| General Water Rate |
|
Rate if paid on or before Due Date |
Rate if paid after Due Date |
Block 1 - All consumers, including Industrial consumption of first 6,000 m3 |
$2.7137/m3 |
$2.8567/m3 |
| Industrial Water Rate |
Block 2 - Industrial process - use water consumption over 6,000 m3, representing 30% reduction from the Block 1 rate |
$1.8996/m3 |
$1.9996/m3 |
|
|
|
2013 Gallon Water Rates
General Water Rate |
|
Rate if paid on or before Due Date |
Rate if paid after Due Date |
Applied to all water consumption, including
the first 1,319,820 gallons of industrial consumption
|
$0.01233668/gal |
$0.01298677/gal |
Industrial Water Rate |
Applied to water consumption over 1,319,820 gallons for those businesses classified under the Industrial Tax Class |
$0.00863572/gal
|
$0.00909033/gal |
Effective January 1, 2013, Toronto City Council approved the following changes in water service fees.
2013 Water Service Fees
Service |
2013 Fee |
Installing 19 mm New
Residential Water
Service and Meter |
$2,700 |
Install 25 mm new residential water service and meter |
$3,111 |
Disconnection Fee for
any residential water
service less than or equal
to 25 mm |
$440 |
Fire hydrant Permit |
$152.70 |
Water meter accuracy
test; Meter less than or
equal to 50mm - No
Chamber - applied if
meter does not over register |
$152.70 |
Water turn off fee for
demolition;
(disconnection of old
water service not
included) |
$76.35 |
Water Turn-off or Turn-on |
$76.35 |
Single Service call Turn-off
and Turn-on within 30
min |
$76.35 |
Conduct fire hydrant flow
test |
$254.50 |
Unregistered water each
day order not complied |
$50.90 |
Annual Seasonal Meter
Activation Fee: includes
replacement, removal of
water meter; 1 turn-on, 1
turn-off |
$30.54 |
Reuse of residential water
service 19 mm to 25 mm |
$254.50 |
2013 Wastewater Service Fees
Service |
2013 Fee |
To install new residential
sanitary sewer service
connection in road allowance |
$7,293 |
To install new residential storm
sewer service connection in
road allowance |
$7,293 |
To disconnect residential
sanitary sewer service
connection in road allowance |
$765 |
Inspection fee for the reuse of
residential City sewer
connection up to 150 mm in
diameter |
$510 |
Technical Review by Toronto
Water staff - Application to
Toronto Water for exemption
to permit the construction of a
driveway sloped downwards
towards a residential building. |
$1,527 |
Technical Review by Toronto
Water staff - Application to
Toronto Water for new
connection or relocation of
storm, sanitary or water supply
connection |
$305 minimum fee;
additional $75.50/hr for
each hour after 4 hrs
to a mximum of
$1,527 |
Technical Review by Toronto
Water staff - Application to
Toronto Water for request to
encroach within a City
permanent or temporary
easement (related to City
water and sewer infrastructure) |
$305 minimum fee;
additional $75.50/hr for
each hour after 4 hrs
to a mximum of
$1,527 |
Technical Review by Toronto
Water staff - Application to
Toronto Water for request to
release from title a City
easement (related to City
water and sewer infrastructure) |
$305 minimum fee;
additional $75.50/hr for
each hour after 4 hrs
to a mximum of
$1,527 |
For a list of all fees, please review BY-LAW No. 1636-2012 (see Schedule A, B & C starting on page 5).
Visit fees for more information about additional Utility Bill charges.
|
|