Evaluation of an Alternative Solution or Material Evaluation under the objective-based Building Code.
Approved Alternative Solution or Material Evaluation
All drawings, reports, and forms, including the completed Alternative Solution Evaluation Form, must be provided in a PDF format.
Include any supporting documents with worksheet, as a single PDF document.
Please note: not all projects are eligible for email submission. Review the list of eligible applications.
To submit an application by email please use the ‘Email’ button on top of the Alternative Solution Evaluation Form
Alternative Solution Evaluation Form PDF
Alternative Solution Evaluation Form .docx
Required when applying for alternative solution evaluation under the objective based code. Please attach all reference documents to this form, and submit your application as a single PDF file. Only a qualified designer may apply for an Alternative Solution evaluation.
If you are using the Word (docx) version, please convert the form to a PDF format before submitting it to Toronto Building.
Commitment to General Reviews By Architect and Engineer
Required for all buildings where professional design and field review is required by the Ontario Building Code. This Commitment form must be signed by the owner or agent and the professional architect, engineer, or consultant.
Fee Effective Jan. 1, 2025 | |
---|---|
Alternative Solution Submission | $2,277.23 |