The City of Toronto has installed cycle tracks along York Gate Boulevard between Jane Street and the existing Finch Hydro Corridor Multi-Use Trail. These changes are part of the City’s Cycling Network Plan to improve road safety and build connected cycling routes. City Council approved the project in March 2025 (IE19.1) and the project was installed.
The project area is between Jane Street and the existing Finch Hydro Corridor. The design includes two segments:

The City installed bikeways on York Gate Boulevard from Jane Street to Hullmar Drive. Changes included:

The City installed bikeways on York Gate Boulevard from Hullmar Drive to Finch Hydro Corridor Multi-Use Trail. Changes included:

Consultation Materials
Public consultation on this project took place in 2024. The report below provides a detailed summary of all consultation activities and feedback received.
The City Council-approved Cycling Network Plan is a comprehensive roadmap and work plan that outlines the City’s planned investment in our cycling network. It includes a Long-Term Cycling Network Vision, the planned Major City-Wide Cycling Network Routes, and a three-year rolling Near-Term Implementation Program.
The aim of the Cycling Network Plan is to connect gaps in Toronto’s current cycling network by growing existing and future cycling opportunities with safer and more comfortable cycling route options where quality can be improved.
This identified new bikeways on York Gate Boulevard for near-term implementation. Additionally, options are being explored as part of the York Gate Cycling Connections project to link the existing Finch Hydro Corridor Multi-Use Trail with Finch Avenue West via the Multi-Use Trail along Norfinch Drive.
The Plan components, objectives and indicators are aligned with a multitude of City policies, including the Official Plan, TransformTO Net Zero Strategy and the Vision Zero Road Safety Plan.
Installation of a bikeway along York Gate Boulevard gave an opportunity to:
Multiple design options were explored for the corridor. The project addresses safety for vulnerable road users, as an existing lack of cycling infrastructure within the corridor creates an unfavourable environment for cyclists.
Options were considered to extend the proposed cycle tracks on York Gate Boulevard to future cycling infrastructure on Finch Avenue, however, several constraints were noted. Transportation Services is exploring options to connect the existing Hydro Corridor path to the Multi-Use Trail along Norfinch Drive.
The proposed changes in this project meet City of Toronto and Province of Ontario laws, standards and guidelines. The proposed changes have been reviewed by City services that use the area roadways, So that Toronto’s Fire Services, Paramedics, Solid Waste collection, TTC, Wheel-Trans, road maintenance and snow clearing can continue to function well and serve the community.
City Council approved the project in March 2025 (IE19.1).