Views, Vistas, and Gateways Map corrected to show heritage potential buildings consistent with the Structure Plan Map
Previous duplication of page numbers 73 and 74 were corrected and table of contents adjusted accordingly
List identifiers for View 5.1 and 5.2 in section 5.3.4 and in section 5.6.5 were corrected to read in proper sequence
Staff Reports
A final staff report and associated Urban Design Guidelines were adopted by Toronto City Council on December 16, 2025. The City Status Report (EY31.5) with the final consultant study and recommendations was adopted by Etobicoke York Community Council at the June 6, 2018 meeting.
Publications & Consultant Reports
Bloor West Village Avenue Study Final Consultant Report (May 2018)
At the July 8, 2014 meeting, City Council adopted member motion 54.16, which directed a planning study be undertaken as follows.
City Council request the Chief Planner and Executive Director, City Planning to:
Undertake a review of the current built-form, density, height and heritage value of the properties on Bloor Street West between Keele Street and the Humber River
Consult with the community, including landowners and other stakeholder groups, together with the Ward Councillor, to understand the community’s concerns and develop a vision for future development in the study area
Report back on the findings of the review and to provide recommendations for changes, if necessary, to the planning framework for the study area.