A map of the ward Toronto Centre within the City of Toronto

Toronto Centre Councillor Office

2021 Census Ward Profile

Toronto Centre Profile - 2021 Census

2016 Census Ward Profile

Toronto Centre Profile - 2016 Census

Need assistance reading content? Call 311 or email cityplanning@toronto.ca.

A road classification system designates streets into different groups or classes according to the type of service each group is intended to provide. This is a fundamental tool for urban development and road management. Grouping roads with similar functions can improve transportation planning, road infrastructure design, maintenance, traffic and road operations.

Every street owned by the City of Toronto has been given one of five classifications (with the exception of public laneways).

Toronto Centre Ward Map

City-Wide Map

Construction Notices by Street

All construction notices below are organized by street name.

    Berkley Street (from Front Street East to Richmond Street East) Watermain Replacement and Road Resurfacing

    Bowman Street (from Carlton Street to Sackville Place) Watermain Replacement and Road Resurfacing and Watermain Replacement and Road Reconstruction on Sackville Place (Sackville Street to Rawlings Avenue)

    Callaghan Lane (from Berkeley Street to Parliament Street) Road Resurfacing

      Church Street and Wellesley Street East Toronto Centre Infrastructure Improvements Preliminary Design Investigations

      Coatsworth Street (from Ontario to Milan Street) Road Resurfacing

      Colborne Street, Leader Lane Infrastructure Improvements (Dated: June 22, 2026)

      Court Street and Toronto Street Watermain Replacement

        Rehabilitation of Bridges and Elevated Roads Near Eastern Avenue and Adelaide Street East

        Gerrard Street East, Dundas Street East & Riverdale Pedestrian Bridges (over the Don River and the Don Valley Parkway) Rehabilitation

        Gerrard Street East and Nelson Mandela Walk, Sewer Chamber Works

        Glen Road Pedestrian Bridge and Tunnel Replacement

        Grosvenor Street (from Queen’s Park Crescent East to Yonge Street; and Queen’s Park Crescent
        East from College Street to Queen’s Park) Watermain Replacement and Road Resurfacing

        Hagerman Street from Bay Street to Elizabeth Street, Road Resurfacing

        Monteith Street Toronto Centre Infrastructure Improvements Preliminary Design Investigations

        Ontario Street (from Carlton Street to Wellesley Street East) Sanitary Sewer Replacement and Road Resurfacing

        Princess Street (from Front Street East to The Esplanade) Storm Sewer Replacement

            Scott Street (from The Esplanade to 100m south of Front Street East) Sanitary Sewer Upgrades

            Scott Street and Front Street East Sewer Chamber Works

            Seaton Street Road Reconstruction

            Sherbourne Street (over Rosedale Valley Road) Bridge Rehabilitation

            The Esplanade, George Street South, and other Local Roads Watermain Replacement, Sanitary and Storm Sewer Replacement and other Road Safety Improvements

            Yonge Street (from Melinda Street to
            Wellington Street East) Watermain Replacement and Road Resurfacing


            If you would like more information about this construction in your neighbourhood, please visit T.O. INview.

            Within the Feature Filter:

            1. Select the 2021 “Construction Year”
            2. Select programs of interest on the “Program” list
            3. Select “Apply”

            Then, in the top left search bar:

            1. Search by street name

            If you need more information, please call 311.

            The City of Toronto ensures that tenants live in safe, well-maintained buildings through RentSafeTO, a bylaw enforcement program. Building owners must comply with the bylaws within the program or face financial penalties.

            Date modified: November 6, 2026