A map of the ward University-Rosedale within the City of Toronto

University-Rosedale Councillor Office

2021 Census Ward Profile

University-Rosedale Profile - 2021 Census

2016 Census Ward Profile

University-Rosedale Profile - 2016 Census

Need assistance reading content? Call 311 or email cityplanning@toronto.ca.

A road classification system designates streets into different groups or classes according to the type of service each group is intended to provide. This is a fundamental tool for urban development and road management. Grouping roads with similar functions can improve transportation planning, road infrastructure design, maintenance, traffic and road operations.

Every street owned by the City of Toronto has been given one of five classifications (with the exception of public laneways).

University-Rosedale Ward Map

City-Wide Map

Local Road Resurfacing

The City of Toronto will resurface the streets listed below. Our inspection of these roads shows that they need resurfacing and sections of damaged curb and/or sidewalk need to be replaced to bring them to a state of good repair. This project is part of the Council-approved 2026 Capital Works Program to renew aging City roads and sidewalk for current and future needs.

Pre Construction Notice (Dated: January 21, 2026)

Construction Notices by Street

All construction notices below are organized by street name.

Bedford Road (from Bloor Street West to Lowther Avenue) Watermain Replacement

    Boswell Avenue, Road Reconstruction

      Brunswick Avenue (From Bloor Street West to Wells Street) Road Resurfacing

          Cecil Street (from Spadina Avenue to Beverly Street) Watermain Replacement

          Clinton Street (from Bloor Street West to College Street) Watermain Replacement

            Crawford Street and Montrose Avenue Watermain Replacement

            Crescent Road and Meredith Crescent Watermain Replacement and Local Road
            Resurfacing

                  Don Valley Parkway Ramp (over Bayview Avenue Extension) Rehabilitation and Road Resurfacing on Bloor Ramp between Bayview Avenue to Don Valley Parkway

                  Euclid Avenue, Road Reconstruction and Resurfacing

                      Governor’s Road (over Moore Park Ravine) Bridge Rehabilitation

                      Grenville Street from Surrey Place to Dr. Emily Stowe Way and Dr. Emily Stowe Way from College Street to Grenville Street, Infrastructure Improvements

                      Grosvenor Street (from Queen’s Park Crescent East to Yonge Street; and Queen’s Park Crescent
                      East from College Street to Queen’s Park) Watermain Replacement and Road Resurfacing

                      Hagerman Street from Bay Street to Elizabeth Street, Road Resurfacing

                      Harbord Street, Hoskin Avenue & Huron Street Watermain Replacement, Sanitary Sewer Replacement, Road Resurfacing and Bike Lane Installation

                      Harrison Street and Roxton Road Sewer Chamber Works

                      Howland Avenue from Bloor Street West to 283 Howland Avenue Watermain Replacement and Road Resurfacing

                          Montrose Avenue Combined Sewer Replacement and Laneway Improvements

                          Olive Avenue and Vermont Avenue Road Resurfacing

                          Palmerston Avenue from College Street to Dundas Street West Watermain Replacement

                          Pears Avenue (from Avenue Road to Bedford Road) Watermain Replacement and Local Road Improvements

                          Rosedale Valley Road Sewer Chamber Works

                          Rosehill Pumping Station Noise Attenuation Panel Installation

                          Rowanwood Avenue Transmission Watermain Replacement

                          Sam Tile Lane (from Roxborough Street West to 55 meters North of Roxborough Street West) Sanitary Sewer Replacement

                          St. George Transmission Watermain Abandonment (from College Street to Willcocks Street)

                          University Avenue, Watermain Replacement, Road Resurfacing and Bikeway Construction

                          Yonge Street and Roxborough Street East University Rosedale Infrastructure Improvements Preliminary Design Investigations


                          If you would like more information about this construction in your neighbourhood, please visit T.O. INview.

                          Within the Feature Filter:

                          1. Select the 2021 “Construction Year”
                          2. Select programs of interest on the “Program” list
                          3. Select “Apply”

                          Then, in the top left search bar:

                          1. Search by street name

                          If you need more information, please call 311.

                          The City of Toronto ensures that tenants live in safe, well-maintained buildings through RentSafeTO, a bylaw enforcement program. Building owners must comply with the bylaws within the program or face financial penalties.

                          Date modified: November 9, 2026