A map of the ward York South-Weston within the City of Toronto

York South-Weston Councillor Office

2021 Census Ward Profile

York South-Weston Profile - 2021 Census

2016 Census Ward Profile

York South-Weston Profile - 2016 Census

Need assistance reading content? Call 311 or email cityplanning@toronto.ca.

A road classification system designates streets into different groups or classes according to the type of service each group is intended to provide. This is a fundamental tool for urban development and road management. Grouping roads with similar functions can improve transportation planning, road infrastructure design, maintenance, traffic and road operations.

Every street owned by the City of Toronto has been given one of five classifications (with the exception of public laneways).

York South-Weston Ward Map

City-Wide Map

Local Road Resurfacing

The City of Toronto will resurface the streets listed below. Our inspection of these roads shows that they need resurfacing and sections of damaged curb and/or sidewalk need to be replaced to bring them to a state of good repair. This project is part of the Council-approved 2023 Capital Works Program to renew aging City roads and sidewalk for current and future needs.

York South-Weston:


Construction Notices by Street

All construction notices below are organized by street name.

Basement Flooding Protection Program – Fairbank-Silverthorn Storm System Phase 2: Local Collector Storm Sewers

Basement Flooding Protection Program – Fairbank-Silverthorn Storm System Phase 2: Construction on Landour Avenue

Basement Flooding Protection Program – Fairbank-Silverthorn Storm System Phase 2: Construction on Woodborough Avenue and Castlefield Avenue

Basement Flooding Protection Program – Fairbank-Silverthorn Storm System Phase 2: Construction at Woodborough Park

Black Creek Drive (over Black Creek) Bridge Rehabilitation

    Cornelius Parkway (from Rustic Road to Floral Parkway) Watermain Replacement

    Culford Road (from Garside Crescent to Harrow Drive) Combined Sewer Replacement

    Cynthia Road (from Scarlett Road to the end of Cynthia Road), Frimette Crescent and Brendwin Drive (from East Drive to the end of Brendwin Drive) Watermain Cleaning and Relining

    Dalbeattie Avenue (and Farnsworth Drive, Lockerbie Avenue, Deerhurst Avenue between Gary Drive and Woodward Avenue) Watermain Cleaning and Relining

      Eglinton Avenue (from Jane Street to 3601 Eglinton Avenue West) Storm Sewer Replacement

      Eglinton Avenue West (over Humber River) Bridge Pier Rehabilitation

      Elm Street (from King Street to Church Street) Road Resurfacing

      Gary Drive (from Academy Road to Pelmo Crescent) and Pelmo Crescent (from Gary Drive to Kames Avenue) Watermain Cleaning and Relining

      Gordon Mackay Road and at 2050 Jane Street Watermain Cleaning and Relining

        King Street (from Weston Road to Jane Street) Watermain Replacement

        Lapp Street (between Northland Avenue and McCormack Street) Watermain Cleaning and Relining

        Lawrence Avenue West (from Little Avenue to Pine Street) and Little Avenue Watermain Replacement and Road Resurfacing

        MacDonald Avenue Watermain Replacement

        Maple Leaf Drive (from Jane Street to Black Creek Drive) Watermain Replacement and Road Resurfacing

        Noranda Drive, Monarchdale Avenue, Westchester Road and Parkchester Road – Intersection Improvements

        Pelmo Crescent (between Kames Avenue and Longview Drive) and Longview Drive, Watermain Cleaning and Relining

        Pelmo Crescent (from Woodward Avenue to 5 metres west of Longview Drive), Longview Drive (from Pelmo Crscent to Ettrick Crescent), Ettrick Crescent, Boylen Street, Uphill Avenue and Woodward Avenue (from Jane Street to 10 metres south of Uphill Avenue) Watermain Cleaning and Relining

        Queenslea Avenue (from Pelmo Crescent and Longview Drive to Langside Avenue), Watermain Cleaning and Relining

        Rosemount Avenue (from Queenslea Avenue to Purdy Crescent) Watermain Replacement

          Sheffield Street (from 86 Ingram Drive to Kincort Street) Storm Sewer Replacement and Sidewalk Construction

          Suntract Road and 2050 Jane Street, Watermain Cleaning and Relining

          Vimy Avenue (from Lawrence Avenue West to MacDonald Avenue) Watermain Replacement and Road Resurfacing

          Wright Avenue and other local roads – Basement Flooding Protection Program Sanitary and Storm Sewer Upgrades on


          If you would like more information about this construction in your neighbourhood, please visit T.O. INview.

          Within the Feature Filter:

          1. Select the 2021 “Construction Year”
          2. Select programs of interest on the “Program” list
          3. Select “Apply”

          Then, in the top left search bar:

          1. Search by street name

          If you need more information, please call 311.

          The City of Toronto ensures that tenants live in safe, well-maintained buildings through RentSafeTO, a bylaw enforcement program. Building owners must comply with the bylaws within the program or face financial penalties.