This project is nestled in the Bayview Village neighbourhood. It includes 500 luxury residential condominium suites and several indoor and outdoor amenity areas. The building successfully achieved the Toronto Green Standard Tier 2, v2 requirements and has also achieved LEED® 2009 Gold certification. The building’s sustainability elements promote biodiversity, occupant well-being and optimized energy and water performance.
This Toronto Green Standard Tier 2, Version 2.0 and LEED® 2009 Gold Certified project includes:
3,100,537 kWh (27.7 percent energy cost savings vs. ASHRAE 90.1-2010 + SB-10).
Low-flow plumbing fixtures were selected for installation to reduce potable water consumption by 37.69 percent.
Indoor and outdoor bicycle parking.
Multiple charging stations provided for hybrid and electric vehicles.
Multiple green roof and landscaped planter areas combined with high-albedo at grade pavers to reduce the urban heat island effect and manage stormwater onsite. Rainwater harvesting system to eliminate the need to use potable water for irrigation.
Tridel
4800 Dufferin St.
Toronto, ON M3H 5S9
Wallman Architects
117 Peter St., Suite 208
Toronto, ON M5V 0M3
Janet Rosenberg & Studio
148 Kenwood Avenue,
Toronto, ON M6C 2S3
EQ Building Performance Inc.
20 Floral Parkway
Concord, ON L4K 4R1
Novatrend
54 West Beaver Creek Rd, Suite 200
Richmond Hill, ON L4B 3M1