Spec. No. | Title | Revision Date |
---|---|---|
TS 7.10 | Construction Specification for the Cleaning and Cement Mortar Lining of Cast and Ductile Iron Watermains | Apr 2013 |
TS 7.20 | Construction Specification for the Cathodic Protection of Existing Ductile and Cast Iron Watermains | Sep 2022 |
TS 7.21 | Construction Specification for Hot-Spot Cathodic Protection of Existing Iron Watermains | Nov 2016 |
TS 7.22 | Construction Specification for Cathodic Protection of New Watermains | Sep 2017 |
TS 7.30 | Procedure for Disinfecting Watermains:
TS115 – Disinfection Test Form (September 2024) TS116 – Hydrostatic Leak Test Record (August 2017) Wet Tap Procedure Notice for ECS Projects (January 2025) Wet Tap Procedure Notice for Development Engineering, Third Party and Transit Projects (January 2025) |
Sep 2024 |
TS 7.40 | Construction Specification for Watermain and Water Service Tracer Wire | Apr 2013 |
TS 7.50 | Construction Specification for Water Meter Remote Wire and Conduit Installation | Feb 2006 |
TS 7.70 | Watermain Replacement and Connection Procedure | Sep 2020 |
TS 7.80 | Material Specification for Large Diameter Watermains | Sep 2023 |
TS 441 | Amendment to OPSS.MUNI 441 (Nov 2021) – Construction Specification for Watermain Installation in Open Cut | Sep 2022 |
TS 493 | Amendment to OPSS.MUNI 493 (Nov 2019) – Construction Specification for Temporary Potable Water Supply Services | Sep 2022 |
TS 1802 | Amendment to OPSS.MUNI 1802 (Nov 2021) – Material Specification for Smooth Walled Steel Pipe | Sep 2022 |
Spec. No. | Title | Revision Date |
---|---|---|
TS 407 | Amendment to OPSS.MUNI 407 (Nov 2021) – Construction Specification for New Maintenance Holes, Catch Basins, Ditch Inlets and Valve Chamber Installations | Sep 2022 |
TS 409 | Construction Specification for Closed Circuit Television Inspection of Pipelines | Sep 2019 |
TS 410 | Amendment to OPSS.MUNI 410 (Nov 2018) – Construction Specification for Pipe Sewer Installation in Open Cut | Sep 2023 |
TS 411 | Construction Specification for Sewer and Maintenance Hole Cleaning | Sep 2019 |
TS 412 | Amendment to OPSS.MUNI 412 (Nov 2018) – Construction Specification for Forcemain Installation in Open Cut | Sep 2022 |
TS 415 | Amendment to OPSS.MUNI 415 (Nov 2018) – Construction Specification for Pipeline and Utility Installation by Tunnelling | Sep 2022 |
TS 416 | Amendment to OPSS.MUNI 416 (Nov 2018) – Construction Specification for Pipeline and Utility Installation by Jacking and Boring | Sep 2022 |
TS 470 | Construction Specification for the Installation of Chemical Grout in Sewers | Sep 2019 |
TS 471 | Construction Specification for the Installation of Mechanical Repair Sleeves | Sep 2019 |
TS 473 | Construction Specification for the Digital Scanning of Maintenance Holes | Sep 2019 |
Spec. No. | Title | Revision Date |
---|---|---|
TS 401 | Amendment to OPSS.MUNI 401 (Nov 2021) – Construction Specification for Trenching, Backfilling and Compacting | Sep 2022 |
TS 403 | Amendment to OPSS.MUNI 403 (Nov 2016) – Construction Specification for Rock Excavation for Pipelines, Utilities and Associated Structures in Open Cut | Sep 2022 |
TS 510 | Amendment to OPSS.MUNI 510 (Nov 2018) – Construction Specification for Removal | Sep 2022 |
TS 515 | Amendment to OPSS 515 (Oct 89) – Construction Specification for Rock Excavation for Pipelines and Associated Structures in Open Cut | Nov 2010 |
TS 518 | Amendment to OPSS.MUNI 518 (Apr 2017) – Construction Specification for Control of Water from Dewatering Operations | Sep 2022 |
Drawing No. | Title | Revision Date |
---|---|---|
T-701.010 | Precast Maintenance Hole 1200 mm Diameter | Sep 2022 |
T-701.011 | Precast Maintenance Hole 1500 mm Diameter | Sep 2022 |
T-701.011-1 | Semi-Precast Maintenance Hole, 825 mm to 1500 mm Diameter Pipe Maximum Depth 8 m | Apr 2013 |
T-701.012-1 | Precast Maintenance Hole 1800 mm Diameter | Sep 2022 |
T-701.013 | Precast Maintenance Hole 2400 mm Diameter | Sep 2022 |
T-701.013-1 | Typical Dual Maintenance Hole with Inverts Level Minimum Storm Size 750 mm Diameter | Apr 2013 |
T-701.013-2 | Typical Dual Maintenance Hole Maximum Storm Size 675 mm Diameter (Straight Runs Only) | Apr 2013 |
T-701.013-3 | Dual Concrete Maintenance Hole with Precast Stack (Straight Runs Only) | Apr 2013 |
T-701.015-1 | Concrete Maintenance Hole Over Stack | Nov 2016 |
T-701.015-2 | Precast Concrete Maintenance Hole Over Stack | Nov 2016 |
T-701.021 | Maintenance Hole Benching Details and Pipe Opening Alternatives | Apr 2013 |
T-701.022 | Dual System Benching Details | Apr 2013 |
T-702.040 | Precast Concrete Ditch Inlet Maintenance Hole – Type A – 1200 mm X 1200 mm, Depth – 3.6m Max | Apr 2013 |
T-702.050 | Precast Concrete Ditch Inlet Maintenance Hole – Type B – 1200 mm X 1200 mm, Depth – 3.6m Max | Apr 2013 |
T-704.010-1 | Maintenance Hole Adjustment Options A and B | Apr 2013 |
T-705.010 | Precast Catch Basin With Sump | Sep 2020 |
T-705.010-1 | Precast Catch Basin Without Sump | Apr 2013 |
T-705.010-2 | Cast in Place Catch Basin With Sump | Sep 2020 |
T-705.010-3 | Cast in Place Catch Basin Without Sump | Apr 2013 |
T-705.010-4 | Cast In Place Catch Basin With Sump – Double Top | Sep 2020 |
T-705.010-5 | Infiltration Trench with Catch Basin To Drain Laneways | Apr 2013 |
T-705.020 | Precast Double Catch Basin With Sump | Sep 2020 |
T-705.020-1 | Cast in Place Double Catch Basin Without Sump | Apr 2013 |
T-705.020-3 | Perforated Dual Chamber Catch Basin | Nov 2016 |
T-705.040 | Precast Concrete Catch Basin Ditch Inlets 600 mm x 1200 mm x Depth 4.0 m Max | Apr 2013 |
T-705.040-1 | Precast Concrete Catch Basin Ditch Inlets 600 mm x 600 mm, Depth 4.0 m Max | Apr 2013 |
T-706.010 | Catch Basin Inlet Control Assembly for Plate Type Control | Apr 2018 |
T-708.01 | Rigid Sewer Service Connections / Catchbasins Leads Connected to Rigid Sewer Main Pipe | Sep 2020 |
T-708.01-1 | Detail of Stack for Catch Basin Connections and for Maintenance Holes – Shown on Dwg. Nos. T-701.015-1 and T-701.015-2 | Apr 2013 |
T-708.01-3 | Typical Methods of Supporting House Connections and Catch Basin Leads | Apr 2013 |
T-708.01-4 | Insulation Details for Water Main and Service Connections | Sep 2018 |
T-708.01-5 | Sanitary Sewer Cleanout Option ‘A’ 100 mm Surface Clean Out | Nov 2016 |
T-708.01-6 | Sanitary Sewer Cleanout Option’B’ 100 mm Surface Clean Out | Nov 2016 |
T-708.020 | Connection Detail for Pipe at Catch Basin or Maintenance Hole | Sep 2022 |
T-709.010 | Groundwater Flow Measuring Device Piping Layout | Apr 2018 |
T-709.020 | Groundwater Sampling Access Point with Maintenance Access Hole Frame and Cover | Apr 2018 |
T-709.030 | Groundwater Sampling Access Point | Apr 2018 |
T-709.040 | Industrial, Commercial and Institutional (ICI) Waste Water Sampling Access Point and Clean-out | Sep 2018 |
T-710.010-1 | Detail of Clean-out Stopper | Apr 2013 |
T-802.032-1 | Concrete Bedding Details for Concrete Pipes | Apr 2013 |
T-804.04 | Concrete Headwall for Sewer or Culvert Pipe | Sep 2018 |
T-810.01-1 | Rip-Rap Headwall for 450 mm Diameter Pipes and Smaller | Apr 2013 |
T-1003.01 | Drop Structures for Maintenance Holes | Apr 2014 |
T-1003.01-1 | Special Drop Chamber – To Be Used Where Flow Overshoots Standard Drop Connection | Apr 2013 |
T-1003.01-2 | Internal Drop Pipe for Maintenance Holes | Sep 2019 |
T-1006.01-1 | Typical Connection to City Trunk Sewer 675 mm I.D. or Larger from Concrete to Concrete | Sep 2020 |
T-1006.010 | Flexible Sewer Service Connections / Catchbasin Leads Connected to Flexible / Rigid Sewer Pipes | Sep 2020 |
T-1007.01 | Typical Details for Supporting Services and Mains up to 300 mm | Apr 2013 |
T-1007.01-1 | Typical Details for Supporting Services and Mains up to 300 mm – Encountered in Trenches Backfilled with Unshrinkable Fill | Apr 2013 |
T-1007.01-2 | Typical Detail for Supporting Water Pipe – 300 mm Diameter and Smaller | Apr 2013 |
T-1007.01-3 | Typical Detail for Supporting Water Pipe 32 mm and Smaller | Apr 2013 |
T-1007.01-4 | Typical Detail for Supporting Water and Sewer Pipe Over New Watermain or Sewer | Jan 2015 |
T-1007.01-7 | Detail of Crossing Of New Sewer Over/Under Existing Sewer | Apr 2013 |
T-1007.01-8 | Guideline Method of Support for 75 mm to 300 mm Water Mains for use when Sheeting and Shoring is Left in Place | Apr 2013 |
T-1007.01-9 | Guideline Method of Support for 75 mm to 300 mm Water Mains for use when Sheeting and Shoring is Withdrawn | Apr 2013 |
T-1007.01-10 | Guideline Method of Support for 75 mm to 300 mm Water Mains for use when Trench is ‘V’ Cut | Apr 2013 |
T-1100.010-2 | Hooked Anchor Rods and Precast Valve Chamber Base | Apr 2013 |
T-1100.010-3 | Installation Details of Valve Tie Downs | Apr 2013 |
T-1100.010-4 | Valve Operating Nut | Apr 2013 |
T-1101.010 | Circular Precast Gate Valve Chamber 400 mm Diameter Watermains and Smaller | Sep 2020 |
T-1101.02-2 | Watermain Valve In Box and Service Valve In Box Detail | Sep 2013 |
T-1101.02-3 | Service Box in Sidewalk Domestic 19 mm and 25 mm Services | Apr 2013 |
T-1101.030-1 | Circular Precast Butterfly Valve Chamber 400 mm Diameter Watermains and Smaller | Sep 2020 |
T-1101.030-2 | Tapping Sleeve and Valve in Chamber 400 mm Diameter Watermains and Smaller | Apr 2014 |
T-1101.030-3 | Circular Precast Chamber 25 mm Air Release Valve | Apr 2014 |
T-1101.030-4 | 25 mm Air Valve Assembly | Apr 2013 |
T-1101.030-5 | Valve Settings for Concrete Pressure Pipe For 350 mm to 600 mm Diameter Watermain | Apr 2013 |
T-1102.01-1 | Sump and Drain Details For 300 mm, 400 mm and 500 mm Gate Valve and Butterfly Valve Chambers | Apr 2013 |
T-1102.01-2 | Sump and Drain Details For 600 mm Diameter and Over Gate Valve and Butterfly Valve Chambers | Apr 2013 |
T-1102.01-3 | Sump and Drain Details for Poured In Place Chambers 1200 mm Diameter Watermains and Smaller | Apr 2013 |
T-1102.01-4 | Sump and Drain Details for Precast Chambers | Apr 2013 |
T-1102.01-5 | Sump and Drain Details for Precast Chambers 1200 mm Diameter Watermains and Smaller | Apr 2013 |
T-1102.01-6 | Sump Frame and Grating Details | Sep 2017 |
T-1102.01-7 | Sump and Drain Details for Poured In Place Chambers | Apr 2013 |
T-1103.01 | Concrete Thrust Blocks for Tees, Plugs and Horizontal Bends | Apr 2013 |
T-1103.020 | Concrete Thrust Blocks for Vertical Bends | Apr 2013 |
T-1103.020-2 | Thrust Blocks Special Applications | Apr 2013 |
T-1103.020-3 | Concrete Anchor Block Details For Welded Steel Watermain Pipe For All Angles 22° 30′ and Over | Apr 2013 |
T-1103.020-4 | Concrete Casing For All Angles 22° 30′ and Over For Welded Steel Watermain Pipe | Apr 2013 |
T-1104.01 | Standard Water Service Connection Details 19 mm and 25 mm Diameter Sizes | Apr 2013 |
T-1104.02-1 | Standard Water Service Connection Details 32 mm, 38 mm and 50 mm Diameter Sizes | Apr 2013 |
T-1104.02-3 | Combine Fire and Domestic Water Connection | Sep 2018 |
T-1104.03 | 25 mm Blow-Off Assembly Detail | Apr 2014 |
T-1104.03-1 | Detail of Temporary 50 mm Dia. Blowoff and Assembly | Apr 2013 |
T-1104.03-2 | Detail of Temporary Isolating Valve and Sampling Cocks | Apr 2013 |
T-1104.03-4 | RP Connection Detail For Above Grade Installation During Disinfection | Sep 2019 |
T-1105.01 | Hydrant Set with Mechanically Restrained Joints | Sep 2017 |
T-1105.02-1 | Standard Service Connection – 1 | Apr 2013 |
T-1105.02-2 | Standard Service Connection – 2 | Sep 2021 |
T-1106.02 | Thermite Welding of Metallic Watermains | Apr 2013 |
T-1106.03-1 | Electrical Bonding of Iron Water Mains | Apr 2013 |
T-1106.03-2 | Electrical Bonding of Iron Water Mains | Apr 2013 |
T-1106.04 | Cathodic Protection for Valves not in Chamber Iron Fittings, Hydrant and Service Connection on Non-Metallic Mains | Apr 2013 |
T-1106.05 | Cathodic Protection for New Ductile Iron Water Main Construction | Apr 2013 |
T-1106.06 | Cathodic Protection on Short Sections of Ductile Iron Watermains. | Apr 2013 |
T-1106.07 | Test Station for Cathodic Protection of Ductile Iron Watermains. | Apr 2013 |
T-1106.08 | Test Station with Cathodic Protection Monitoring Probe for New or Existing Iron Water Mains | Apr 2013 |
T-1107.01-1 | Piping Layout for Meter Chamber up to 50 mm Private Water Service Pipe | Sep 2018 |
T-1107.02-1 | Piping Layout for Compound Water Meters 75 mm to 300 mm in Chambers | Sep 2018 |
T-1107.02-2 | Piping Layout for Electromagnetic Water Meters 75 mm to 300 mm in Chambers | Sep 2018 |
T-1107.02-3 | Piping Layout for Turbine Water Meters 75 mm to 300 mm in Chambers | Sep 2018 |
T-1107.03-1 | Installation Details for Compound and Turbine Type Water Meter in Buildings | Sep 2018 |
T-1107.03-2 | Installation Details for Electromagnetic Type Water Meter in Buildings | Sep 2018 |
T-1107.04-1 | Installation Details for 37 mm and 50 mm Positive Displacement Water Meter in All Buildings | Sep 2018 |
T-1107.04-2 | Installation Details for 16 mm to 25 mm Positive Displacement Water Meter in Single Family Residential Buildings | Sep 2018 |
T-1107.04-3 | Detail of Connections with Cross or Tee for Watermains | Apr 2013 |
T-1107.04-4 | 150 mm Diameter Branch Connection | Apr 2013 |
T-1107.04-5 | Service Connection Branch Diameter Larger Than Watermain | Apr 2013 |
T-1107.04-6 | Installation Details for 16 mm to 25 mm Positive Displacement Water Meter in All Buildings other than Single Family Residential Buildings | Sep 2018 |
T-1107.04-7 | Installation Details for 25 mm Fire Rated Water Meter in Single Family Residential Buildings | Sep 2018 |
T-1107.05 | Typical 150 mm Watermain on Cul-de-sac | Apr 2013 |
T-1108.01-1 | Water Meter Chamber for 75 mm or Greater Private Water Service Pipe | Apr 2013 |
T-1108.01-2 | Circular Precast Meter Chamber for up to 50 mm Private Water Service Pipe | Apr 2013 |
T-1108.01-3 | Double Check Detector Chamber | Apr 2013 |
T-1108.01-4 | Installation of Premise Isolation Blackflow Device | Sep 2018 |
T-1109.01-1 | Open Cut Concrete Encasement (Welded Steel Pipe) | Jan 2015 |
T-1109.01-2 | Open Cut Protection for Non-Encased Pipe (High Density Polyethylene) | Jan 2015 |
Drawing No. | Title | Revision Date |
---|---|---|
T-1110.01-1 | Class A Trench Detail High Risk PCCP | Apr 2017 |
T-1110.01-2 | Class B1 Trench Detail Medium Risk PCCP | Apr 2017 |
T-1110.01-3 | Class B Trench Detail Low Risk PCCP | Apr 2017 |
T-1110.01-4 | Open Cut Protection for Non-Encased Pipe (High Density Polyethylene) High and Medium Risk | Apr 2017 |
T-1110.01-5 | Trench Detail Low Risk High Density Polyethylene Pipe | Apr 2017 |
T-1110.01-6 | Trench Detail Low Risk Ductile Iron Pipe | Apr 2017 |
T-1110.01-7 | Trench Detail Low Risk Polyvinyl Chloride Pipe | Apr 2017 |
T-1110.01-8 | Trench Detail Low and Medium Risk Stainless Steel Pipe | Sep 2023 |
T-1110.01-8A | Trench Detail High Risk Stainless Steel Pipe | Sep 2023 |
T-1110.01-9 | Trench Detail Low Risk Steel Pipe | Sep 2022 |
T-1110.01-10 | Trench Detail Medium and High Risk Concrete Encasement (Welded Steel Pipe) | Sep 2022 |
Drawing No. | Title | Revision Date |
---|---|---|
T-1110.02-1 | Tunnel Liner Detail Pre-stressed Concrete Cylinder Pipe | Apr 2017 |
T-1110.02-2 | Tunnel Liner Detail HDPE Pipe | Apr 2017 |
T-1110.02-3 | Tunnel Liner Detail Steel or Stainless Steel Pipe | Apr 2017 |
Drawing No. | Title | Revision Date |
---|---|---|
T-1110.03-1 | PCCP Connection to Steel Pipe | Sep 2017 |
T-1110.03-2 | PCCP Connection to HDPE Pipe | Sep 2017 |
T-1110.03-3 | PCCP Connection to Stainless Steel Pipe | Sep 2017 |
T-1110.03-4 | Steel Pipe Connection to HDPE Pipe | Apr 2017 |
T-1110.03-5 | Steel Pipe Connection to Stainless Steel Pipe | Apr 2017 |
T-1110.03-6 | PCCP Connection to Ductile Iron Pipe | Sep 2017 |
T-1110.03-7 | PCCP Connection to PVC Pipe | Sep 2017 |
T-1110.03-8 | Steel Pipe Connection to Ductile Iron Pipe | Apr 2017 |
T-1110.03-9 | Steel Pipe Connection to PVC Pipe | Apr 2017 |
T-1110.03-10 | Polyethylene Pipe Connection to Stainless Steel Pipe | Apr 2017 |
T-1110.03-11 | Polyethylene Pipe Connection to Ductile Iron Pipe | Apr 2017 |
T-1110.03-12 | Polyethylene Pipe Connection to PVC Pipe | Apr 2017 |
T-1110.03-13 | Stainless Steel Pipe Connection to Ductile Iron Pipe | Sep 2017 |
T-1110.03-14 | Stainless Steel Pipe Connection to PVC Pipe | Apr 2017 |
T-1110.03-15 | Ductile Iron Pipe Connection to PVC Pipe | Apr 2017 |
T-1110.03-16 | Proposed Concrete Encased Steel Pipe Connection to Existing Cast Iron Pipe | Sep 2017 |
T-1110.03-17 | Proposed Pre-stressed Concrete Cylinder Pipe Connection to Existing Cast Iron Pipe | Sep 2017 |
T-1110.03-18 | Proposed Stainless Steel Pipe Connection to Existing Cast Iron Pipe | Sep 2017 |
T-1110.03-19 | Proposed Concrete Encased Steel Pipe Connection to Existing Concrete Encased Steel Pipe | Sep 2017 |
T-1110.03-20 | Proposed Pre-stressed Concrete Cylinder Pipe Connection to Existing Concrete Encased Steel Pipe | Sep 2017 |
Drawing No. | Title | Revision Date |
---|---|---|
T-1110.04-1 | Steel Pipe Welding Detail Butt-Joint | Apr 2017 |
T-1110.04-2 | Steel / Stainless Steel Pipe Welding Detail Lap-Joint | Apr 2017 |
Drawing No. | Title | Revision Date |
---|---|---|
T-1110.05-1 | Tunnel Railway Crossing Pre-stressed Concrete Pressure Pipe | Apr 2017 |
T-1110.05-2 | Tunnel Railway Crossing Detail Stainless Steel Pipe | Apr 2017 |
T-1110.05-3 | Tunnel Railway Crossing Detail Steel Pipe | Apr 2017 |
Drawing No. | Title | Revision Date |
---|---|---|
T-1110.06-1 | Tunnel Highway Crossing Detail Concrete Pipe | Apr 2017 |
T-1110.06-2 | Tunnel Highway Crossing Detail Steel Pipe | Apr 2017 |
Drawing No. | Title | Revision Date |
---|---|---|
T-1110.07-1 | Miscellaneous Appurtenances – Precast Chambers | Apr 2017 |
T-1110.07-2 | Miscellaneous Appurtenances – Cast in Place Chambers | Apr 2017 |
T-1110.07-3 | Sump and Drain Details | Apr 2017 |
T-1110.07-4 | Precast 100 mm Air Valve or M.H. Chamber | Sep 2021 |
T-1110.07-5 | Precast 100 mm Air Valve and M.H. Chamber | Sep 2021 |
T-1110.07-6 | Precast 300 mm Drain Valve and M.H. Chamber | Sep 2021 |
T-1110.07-7 | 500 / 600 Pipe 100 mm Drain Valve Chamber | Sep 2022 |
T-1110.08-1 | 750 mm Horizontal Butterfly Valve Chamber (Position A) | Sep 2021 |
T-1110.08-2 | 750 mm Horizontal Butterfly Valve Chamber (Position B) | Sep 2021 |
T-1110.09-1 | 900 mm Horizontal Butterfly Valve Chamber (Position A) | Sep 2021 |
T-1110.09-2 | 900 mm Horizontal Butterfly Valve Chamber (Position B) | Sep 2021 |
T-1110.10-1 | 1050 mm Horizontal Butterfly Valve Chamber (Position A) | Sep 2021 |
T-1110.10-2 | 1050 mm Horizontal Butterfly Valve Chamber (Position B) | Sep 2021 |
T-1110.11-1 | 1200 mm Horizontal Butterfly Valve Chamber (Position A) | Sep 2021 |
T-1110.11-2 | 1200 mm Horizontal Butterfly Valve Chamber (Position B) | Sep 2021 |
T-1110.12-1 | 1350 mm Horizontal Butterfly Valve Chamber (Position A) | Sep 2021 |
T-1110.12-2 | 1350 mm Horizontal Butterfly Valve Chamber (Position B) | Sep 2021 |
T-3000-2005-1 | Standard 225 mm Frame, 3 – Piece Chamber Cover | Jul 2005 |
Drawing No. | Title | Revision Date |
---|---|---|
1120.01-1 | Base Detail – New Maintenance Hole for Existing Large Diameter Sewer | Sep 2019 |
1120.01-2 | Riser and Chimney Detail – New Maintenance Hole for Existing Large Diameter Sewer | Sep 2019 |
1120.02-1 | Typical Repair of Exposed Sewer Crossing a Creek | Sep 2019 |
1120.02-2 | Typical Repair of Exposed Sewer Parallel to a Creek | Sep 2019 |
1120.03-1 | Connection of a Local Sewer to a Trunk Sewer | Sep 2019 |
1120.04-1 | Demolition and Removal of Precast or Poured in Place Maintenance Hole Chimney | Sep 2019 |
1120.04-2 | Demolition and Removal of Brick or Brick and Concrete Maintenance Hole Chimney | Sep 2019 |
1120.04-3 | Replacement of Precast Maintenance Hole Chimney | Sep 2019 |
1120.04-4 | Replacement of Poured in Place Maintenance Hole Chimney | Sep 2019 |
1120.04-5 | Replacement of Brick Maintenance Hole Chimney | Sep 2019 |
1120.05-1 | FRP Ladder | Sep 2019 |
1120.05-2 | FRP Safety Landing and Handrail | Sep 2019 |
1120.05-3 | Access Handle and Bracket | Sep 2019 |
1120.05-4 | FRP Ladder for Circular Maintenance Holes Less than 4.5m Depth | Sep 2019 |
1120.05-5 | FRP Handrail for Square Maintenance Holes Greater than 4.5m Depth | Sep 2019 |
1120.06-1 | Anchoring Method for Maintenance Hole | Sep 2021 |
1120.06-2 | Circular 745 mm Cover and Frame for Maintenance Hole | Sep 2021 |
1120.06-3 | Maintenance Hole Waterproofing Membrane | Sep 2021 |
1120.07-1 | Demolition Detail – Raising a Maintenance Hole Within a Flood Plain | Sep 2019 |
1120.07-2 | Installation Detail – Raising a Maintenance Hole Within a Flood Plain | Sep 2019 |
1120.08-1 | Typical Temporary Construction Access Road | Sep 2019 |
1120.08-2 | Temporary Creek Crossing for Construction Vehicles | Sep 2019 |
1120.08-3 | Wooden Swamp Mat | Sep 2019 |
1120.09-1 | IFC Maintance Hole Frame and Cover | Sep 2023 |
1120.09-2 | IFC Maintance Hole Tapered Top Assembly | Sep 2023 |
1120.09-3 | IFC Concrete Adjustment Unit | Sep 2023 |
Spec. No. | Title | Revision Date |
---|---|---|
TS 4.01 | Construction Specification for Sewer Bypass Flow Pumping | Sep 2019 |
TS 4.02 | Construction Specification for Sewer Bypass Flow Pumping for Trunk Sewers | Sep 2019 |
TS 7.10 | Specification for the Cleaning and Cement Mortar Lining of Cast Iron and Ductile Iron Watermains | Apr 2013 |
TS 460 | Construction Specification for the Cured-In-Place Pipe Lining of Sewers (For ECS Projects) | Sep 2021 |
TS 465 | Construction Specification for the Cured-In-Place Rehabilitation of Sanitary/Combined Sewer Services (Formerly TS 4.11) | Sep 2019 |
TS 466 | Construction Specification for the Cured-In-Place Pipe Spot Repairs in Sewers (Formerly TS 4.12) | Sep 2019 |
TS 467 | Construction Specification for Type A – Structural and Non-structural Maintenance Hole Rehabilitation (Formerly TS 4.13) | Sep 2020 |
TS 460 / TS 466 |
Sewer Lining Odour Notice Toronto Public Health Styrene Fact Sheet |
Sep 2019 |
Spec. No. | Title | Revision Date |
---|---|---|
TS 4.10 | Specification for Cured-In-Place Pipe (CIPP) for the Lining of Sewers and Culverts | Feb 2024 |
TS 4.14 | Specification for Spray-in-Place Thermoset Plastic Flexible Lining (SIP-TPFL) for Sewers, Storms and Culverts | Apr 2022 |
TS 4.15 | Specification for Spray-in-Place Cementitious Liner (SIPCL) for the Rehabilitation of CSP/CMP and RCP Sewers and Culvers | Jun 2022 |
TS 7.60 | Specification for the Cured-In-Place Pipe Lining of Watermains | Nov 2023 |